You are on page 1of 3

ES&H SITE VISIT REPORT

Project Number: 2200016404

Date: 14-08-2023

Report by: Muhammad Younis Khan

Critical Safety Issues:

No rest shelter is available at site and the workers are sitting on asphalt and in
sand, where there is a possibility of venomous and dangerous snakes bites,
as many times it has been observed in other sites, so we should be careful.
The attached pictures are proof.

Notes:

ACKNOWLEDGMENT OF ISSUES ACTIONED & CLOSED OUT

Contractor Safety Manager:

Name: Muhammad Younis Khan Signature:

CWC Construction Staff:

Name: Salem Al Nahdi Signature:

Once actioned & closed out, this Report is then to be returned to Report initiator (ILF Area
Safety Engineer)

Page|1
ES&H SITE VISIT REPORT

Observation Welfare Facilities


1
Location: Construction site
Observation: No rest shelter is available at
site and the workers are sitting
on asphalt and in sand, where
there is a possibility of
venomous and dangerous
snakes bites, as many times it
has been observed in other
sites, so we should be careful.
The attached pictures are
proof.
Required All people working at height in
Action: such case shall be provided
with full body harness. Stop
the work and provide all man
with full body harness
Priority: immediate

Observation 2 Welfare Facilities


Location: Outside swimming pool
Observation: No rest shelter is available
for workers and workers
are resting in sandy area
where there is a risk of
poisonous snake bitten.

Required Action: CWC need to provide rest


shelter immediately.

Priority: Immediate

Page|2
ES&H SITE VISIT REPORT

Corrective Action:

Observation 3 Exposed edge at height


Location:
Observation: Exposed leading edge is
remained without any
protection

Required Action: Physical barriers shall be


provided to all exposed
leading edge

Priority: Immediate in 3 days

Page|3

You might also like