S. No Timescale
Hazards and consequences Immediate and longer term actions
1 Electrocution Hazed Immediate Action
This may lead to SLIP, TRIP or Fall They were instructed to un-winded
scaffoldings, mobilize them on each floor
that may lead to fracture, breaking Daily
and they need to be brought to the ground
of bones and even to death.
floor through the construction service lift
Safety training to be conducted on wearing
fall preventive belts while working 1.5 Weekly
meter and above
6 Mechanical Hazzard Immediate Action
The drilling vibration shall weaken Monitoring the safe work environment
the earth at the excavation area. while excavation and proper training to be
Daily
Thereby the workers get trapped in provided for not carrying the workers on
the soil slide. And become caved in. the arm of the JCB machine