You are on page 1of 18

PEDESTAL COLUMN FOR TOWER-USD

DESIGNATION PU(Kn) φ assume ρ fc' φb capacity b


PC1 1509.6242 0.65 0.01 27.6 25 49.599569 700
PC2 1509.6242 0.65 0.01 27.6 25 49.599569 700
PC3 1509.6242 0.65 0.01 27.6 25 49.599569 700
PC4 1509.6242 0.65 0.01 27.6 25 49.599569 700

PEDESTAL COLUMN FOR TOWER-USD

DESIGNATION Ag(mm^2)
Ast Ab no. of
N Dimension( Tie
(mm^2) (mm^2) bars mm) bar(mm)

PC1 490000 5892 491 9.980 12 700 12


PC2 490000 5892 491 9.980 12 700 12
PC3 490000 5892 491 9.980 12 700 12
PC4 490000 5892 491 9.980 12 700 12
FOR TOWER-USD

Reinforcement

12 - 25 mm Ø Vertical Bars -12 mm Ø ties spaced @ 400


12 - 25 mm Ø Vertical Bars -12 mm Ø ties spaced @ 400
12 - 25 mm Ø Vertical Bars -12 mm Ø ties spaced @ 400
12 - 25 mm Ø Vertical Bars -12 mm Ø ties spaced @ 400
PEDESTAL COLUMN FOR TOWER(USD)
PC1 Specifications

f'c 27.6 Main Bar Ø 25 Pu


fy 414 Ties Ø 12 Mu
ρ 0.02 Length 0.7 Base
Type TIED C.Cover 75 C.Size
ɸ 0.65 β 0.85 d'
Ab 491 Ag 490000 As

Use ρ= 0.01
(if As/Ag is smaller than 0.01 use ρ = 0.01 )
(if As/Ag is bigger than 0.08 use ρ = 0.08 )

Use As = 4900

Compute number of bars ; (by 4)


As/Ab = 9.979633401222 say 12
As(act) = 5892

Compute for bar spacing ;


{C.Size-(D')*2) / [(No. of Bars/(4+1)]*barØ}
No. of bar / 4
= 150

Compute for ties spacing ;


Spacing 1 400 16* Bar Ø
Use min Spacing 2 576 48* Tie Ø
Spacing 3 700 C. Size
Therefore use ; 400

Solve for Pu ;
(ɸ*0.8) * {[(0.85*F'C) * (Ag-As(act)] + (As(act)*fy)} / 1000
= 7174.16

Check if Design PU > Req'd PU


7174.16 > 1509.62418
SAFE
DESIGN : 12 - 25 mm Ø Vertical Bars -12 mm Ø ties spaced @ 400

e = 6.9136412612956
e min = 70
Loadings Axially Loaded
Design Mcap 49.5995685911364
Checking Safe
OWER(USD)
fications

1509.6241771
10.437
700
700
75
-22001
paced @ 400
Extracted loads from STAAD/ Load per footing
TOWER 1 1 EQ X
PILE DL LL 2 EQ Z
TC1 61.676 230 3 DEAD
TC2 61.676 230 4 WIND +X
TC3 61.676 230 5 WIND -X
TC4 61.676 230 6 WIND +Z
7 WIND -Z
8 LIVE
2 1 EQ X
2 EQ Z
3 DEAD
4 WIND +X
5 WIND -X
6 WIND +Z
7 WIND -Z
8 LIVE
3 1 EQ X
2 EQ Z
3 DEAD
4 WIND +X
5 WIND -X
6 WIND +Z
7 WIND -Z
8 LIVE
4 1 EQ X
2 EQ Z
3 DEAD
4 WIND +X
5 WIND -X
6 WIND +Z
7 WIND -Z
8 LIVE
-5.805 -27.399 -9.827 0.009 -0.004 0.005
-9.829 -27.401 -5.805 0.001 0.001 -0.007
20.65 61.676 19.966 -2.601 0.342 1.963
-476.53 -1804.738 -640.285 -0.809 -20.4 25.77
476.53 1804.738 640.285 0.809 20.4 -25.77
-640.234 -1804.87 -476.53 -25.108 19.914 0.91
640.234 1804.87 476.53 25.108 -19.914 -0.91
82.544 230 79.085 0.239 1.729 -3.462
-5.805 27.399 9.827 -0.009 -0.004 0.005
9.829 -27.401 -5.805 0.001 -0.001 0.007
-20.65 61.676 19.966 -2.601 -0.342 -1.963
-476.53 1804.738 640.285 0.809 -20.4 25.77
476.53 -1804.738 -640.285 -0.809 20.4 -25.77
640.234 -1804.87 -476.53 -25.108 -19.914 -0.91
-640.234 1804.87 476.53 25.108 19.914 0.91
-82.544 230 79.085 0.239 -1.729 3.462
-5.805 27.399 -9.827 0.009 0.004 0.005
-9.829 27.401 -5.805 0.001 -0.001 -0.007
-20.65 61.676 -19.966 2.601 0.342 -1.963
-476.53 1804.738 -640.285 -0.809 20.4 25.77
476.53 -1804.738 640.285 0.809 -20.4 -25.77
-640.234 1804.87 -476.53 -25.108 -19.914 0.91
640.234 -1804.87 476.53 25.108 19.914 -0.91
-82.544 230 -79.085 -0.239 1.729 3.462
-5.805 -27.399 9.827 -0.009 0.004 0.005
9.829 27.401 -5.805 0.001 0.001 0.007
20.65 61.676 -19.966 2.601 -0.342 1.963
-476.53 -1804.738 640.285 0.809 20.4 25.77
476.53 1804.738 -640.285 -0.809 -20.4 -25.77
640.234 1804.87 -476.53 -25.108 19.914 -0.91
-640.234 -1804.87 476.53 25.108 -19.914 0.91
82.544 230 -79.085 -0.239 -1.729 -3.462
PEDESTAL COLUMN FOR TOWER(WSD)
PC1 Specifications
f'c 27.6 Main Bar Ø 25 Pu 718.0112
fy 414 Ties Ø 12
ρ 0.02 Length 0.6 Base 600
Type TIED C.Cover 75 C.Size 600
ɸ 0.65 β 0.85 d' 75
Ab 491 Ag 360000 As -21625.4

Use ρ= 0.01
(if As/Ag is smaller than 0.01 use ρ = 0.01 )
(if As/Ag is bigger than 0.08 use ρ = 0.08 )

Use As = 3600

Compute number of bars ; (by 4)


As/Ab = 7.33197556 say 8
As(act) = 3928

Compute for bar spacing ;


(C.Size-(D')*2) / ((No. of Bars/(4+1))*barØ)
No. of bar / 4
= 188

Compute for ties spacing ;


Spacing 1 400 16* Bar Ø
Use min Spacing 2 576 48* Tie Ø
Spacing 3 600 C. Size
Therefore use ; 400

Solve for Pu ;
(ɸ*0.8) * {[(0.85*F'C) * (Ag-As(act)] + (As(act)*fy)} / 1000
= 5189.41

Check if Design PU > Req'd PU


5189.41 > 718.0112
SAFE
DESIGN : 8 - 25 mm Ø Vertical Bars -12 mm Ø ties spaced @ 400
PEDESTAL COLUMN FOR TOWER-WSD
DESIGNATION PU(Kn) φ assume ρ fc' φb capacity b
PC1 718.0112 0.65 0.01 27.6 25 5189.41 600
PC2 718.0112 0.65 0.01 27.6 25 5189.41 600
PC3 718.0112 0.65 0.01 27.6 25 5189.41 600
PC4 718.0112 0.65 0.01 27.6 25 5189.41 600

PEDESTAL COLUMN FOR TOWER-WSD

DESIGNATION
Ag Ast Ab no. of
N Dimension( Tie
(mm^2) (mm^2) (mm^2) bars mm) bar(mm)

PC1 360000 3600 491 7.332 8 600 12


PC2 360000 3600 491 7.332 8 600 12
PC3 360000 3600 491 7.332 8 600 12
PC4 360000 3600 491 7.332 8 600 12
N FOR TOWER-WSD

Reinforcement

8 - 25 mm Ø Vertical Bars -12 mm Ø ties spaced @ 400


8 - 25 mm Ø Vertical Bars -12 mm Ø ties spaced @ 400
8 - 25 mm Ø Vertical Bars -12 mm Ø ties spaced @ 400
8 - 25 mm Ø Vertical Bars -12 mm Ø ties spaced @ 400
BASE PLATE -LRFD
MEMBER SIZE
DESIGNATION PU(kn) φ fp
Do(mm) Di(mm)
BP1 438 254 1509.6242 0.65
BP2
BP3
BP4
fc' fb
BASE PLATE FOR TOWER(LRFD)
SECTION PROPERTIES:
Concrete Pedestal:
700 x 700mm
STEEL BASE PLATE
380 x 450mm
d=360.68mm
Pu=1509.62 Kn
A=14,064.48 mm^2
MATERIAL PROPERTIES:
Fc'=27.6 Mpa
Fy=248 MPa
SOLUTION:

𝑋/700=
380/450
x=591.11

𝑌/700=
450/380
y=828.95 (governs)

ALLOWABLE BEARING PRESSURE ON THE CONCRETE PEDESTAL

Fp=0.35fc'
√(𝐴2
Fp=0.35fc' ≤0.7fc'
/𝐴1)

Fp=15.027 Mpa ≤19.32 Mpa


therefore; use Fp=15.027 Mpa
ALLOWABLE AXIAL LOAD
Fp=𝑃/𝐴

P=FpA= (15.027)(B baseplate)


P=(15.027)(380)(450)= 2569617 N
P= 2569.617 KN

THICKNESS OF BASE PLATE

bf=254 d=360.68
0.80bf=203.4 0.95d=342.464
(450−0.95𝑑)/2 (380−0.85𝑏𝑓)/2
Ib1= Ib2=
Ib1= 53.677 Ib2= 88.4 (govern)

𝑡𝑝=√((3𝑡𝑝 〖𝐼
𝑏〗 ^2)/𝑓𝑏)
;fb=0.75Fy

tp=43.5204mm

Use 45mm for Base Plate Thickness

REQUIRED AREA FOR BASE PLATE

=√((𝑃𝑢(1000))/
(Ø(0.85)(fc')))

Required area for base plate = 107,248.082〖𝑚𝑚〗 ^2


using the base plate of 380 x 450 mm , the actual stress of concrete