PRE-TASK PLANNING

Contractor Company: Central Civil Location of Work: Step One Outbound


Date: Thursday, 9/24/2020
Project Name: Supervisor Review

P.O.M Cargo Gates Modernization Mid-Morning _____


Mid-Afternoon _____

DESCRIBE WORK TO BE PERFORMED


Continued backfilling and compaction procedures for our first lift of slab on grade.

Potential Hazards
1.Electrocution/Shock 11.CAZ Needed 21.Noise
2.Fall From Heights 12.Restricted Work Area 22.MSDS Review
3.Work Overhead 13.Welding Fumes 23.Cutting and Grinding
4.Lifting: Manual Mechanical 14.Welding Arc Flash 24.Confined Space
5.Rotate/Moving Parts 15.Slag/Sparks 25.Line Breaking
6.Flying Particles 16.Flammable Material 26.Underground Utilities
7.Vehicle Traffic 17.Excavation 27.Heavy Equipment
8.Interior Forklift Traffic 18.Airborne Contaminants 28.Obstructed Pathways
9.Ladders 19.Asbestos 29.Closed Doorways
10.Proximity Near Workers 20.Lead Paint 30.Common Walls

Crew Members
Name Signatures
RISK AND HAZARD RECOGNITION/ MITIGATION
Risk / Hazard Corrective Actions
Compaction for grading. Inspect compactor prior each use, shut off compactor and let it
cool off before refueling. Maintain proper posture when
operating compactor, work up and down slopes not across.
Take breaks from vibrations when using compactor excessively.
Backfilling operation Keep communication with spotter at all times, keep backfill
operations area clear from debris and make sure no one is
standing near excavator when soil is being placed. Keep
excavator within 4ft from excavation to prevent machinery fall.
Uneven grounds/ surface Watch your step at all times. Remove any unstable material
that can cause a slip and trip hazard. Walk do not run on site.

General Housekeeping All materials must be left organized after each shift, all garbage
must be disposed of properly and excavation area must be left
barricaded and safe.

PPE High viz safety vest and personal protective equipment must be
in use at all times for task given.

Dehydration Make sure you stay hydrated throughout the day, do not intake
sugary drinks and drink water continuously. If you feel sick
please report to your supervisor immediately.

Reviewer’s Signatures
Contractor Supervisor
____________________________________________
Project Supervisor / Safety Representative

____________________________________________