ASPECTS/ HAZARDS /

ACTIVITY
SOURCE OF HAZARDS

2. Soil structure
3. Underground Water
table.
4. Traffic condition
diversion /stoppage

6. On road traffic &


speed.
7. Collapse of the road
8. Material Handling
ROAD CUTTING
10. Workers working on
the road
11. Working with the road
cutting (high
speed Blade)
12. Working with the
compacters

14. Settlement in the


road causing traffic
accident
1. Operation of
construction
machineries including
grading & compaction
3. Laying & compaction
of Granular base.
4. Curb stone fixing.
5. Application of Hot
Bitumen as binder
6. Bituminous Macadam
operation
ROADWORK’S
7. Operation of Roller
(STONE FIXING,
compactor & Tire
COMPACTION,
roller.
LEVELING &
8. Road markings, sign
ROAD
post & signals.
MARKINGS)
9. Use of compressed air
for cleaning purpose.
10. Dust, Noise &
Vibration
11. Heating
arrangements.
12. Heavy Vehicle
Movement carrying
hot Bituminous
Macadam.
13. Public road use
1. Traffic load on the
Public road
2. Bypass / temporary
access / diversion.
WORKING ON/ 3. Personal working on/
NEAR PUBLIC near the road.
ROAD 4. Traffic Management &
Signal System.
5. Construction Vehicles
& Machineries
movement.
THREATS

1. Underground services not


detected.
2. No dewatering arrangements
3. Traffic load not assessed & no
arrangement made for the traffic
safety.
6. The Machineries are not
maintained.
9. Excavated area left open with out
warning/ lights especially at night.
11. Personnel not aware of hazards
of High Speed Road cutting
Blade.
12. Compaction & reinstatement of
the road surface not is not
supervised
3. Lack of competency for the
operators (not licensed, not
experienced to operate).
4. Lack of banksman & supervision
to control the movements of
plants & machineries.
5. Lack of arrangement for handling
of the Curb stone (lifting,
positioning etc)
6. Lack of Approved heating
arrangements.
7. Lack of awareness on the
hazards of Hot Bitumen. Lack of
MSDS & understanding.
8. Lack of arrangements for
bituminous macadam application.
9. Roller / compactor operator is not
tested of “White Finger Disease”
due to vibration.
10. Personnel not aware of hazards
of Compressed air application.
11. No “Dead Man Switch” attached
at the out let nozzle & also the
hoses are not connected by
Victoria Coupling. 12. First Aid
Provision not
maintained.
13. Lack of fire protection
arrangements for handling open
flames.
14. Lack of Emergency
preparedness
15. Lack of PPE including rubber
boots/ gloves, fumes respirators,
ear muff’s, goggles etc.
16. Road worthiness for the Heavy
vehicle transposing bituminous
1. Busy Traffic in the Public Road.
2. Fluctuating Traffic, driven by
timings.
3. Deficiencies in design for
Bypass, temporary access,
diversions, road signs, signal
system etc.
4. Personnel not aware of Road
Hazards
5. Personnel are not provided with
Fluorescent jackets.
6. Movement of the Construction
Vehicles & Machineries.
7. Traffic in around the working site
is not effectively managed.
WORST CASE
EVENTS/ IMPACTS P

Collapse of the
road.
Vehicle Accident
Personal Injury
Road Traffic
Accident
Personal Injury
CONTROLS THAT CAN MINIMIZE THE RISK TO
ALARP LEVEL

ENGINEERING:
1. Design of the Road crossing in line with the site
condition.
2. Selection of site, design of the road including access & exits.
PROCEDURE :
1. Open cut road Crossing
SKILL / TRAINING:
3. Working in/ near Vehicular traffic Road.
5. Working with Road cutting M/c.
INSPECTIONS & AUDITS:
2. Audit of the Traffic management
FORMATS & RECORDS:
2. TBT & Permits to work records
OTHER HSE MEASURES:
c. The Environmental survey is conducted
d. The Personnel working on or near the road are
provided with florescent jackets.
e. Proper arrangements are made to direct the traffic
and warn the passer by.
g. Ensure all personnel are communicated with the
hazards associated.
i. Ensure excavation is guarded and during night
hours proper warning signs & barricades are
placed to ward off the stray animals & passer by.
compactor & Tire
roller.
8. Road markings, sign
post & signals.
9. Use of compressed air
for cleaning purpose.
10. Dust, Noise &
Vibration
11. Heating
arrangements.
12. Heavy Vehicle
Movement carrying
hot Bituminous
Macadam.
13. Public road use
1. Lack of pre job preparation
including traffic management,
road diversion warnings etc.
2. Lack of inspection, maintenance
& approval of the heavy
machineries
3. Lack of competency for the
operators (not licensed, not
experienced to operate).
4. Lack of banksman & supervision
to control the movements of
plants & machineries.
5. Lack of arrangement for handling
of the Curb stone (lifting,
positioning etc)
6. Lack of Approved heating
arrangements.
7. Lack of awareness on the
hazards of Hot Bitumen. Lack of
MSDS & understanding.
8. Lack of arrangements for
bituminous macadam application.
9. Roller / compactor operator is not
ENGINEERING:
1. Design of the Traffic Diversions & temporary
facilities in line with the intended Traffic Load.
PROCEDURE :
1. Traffic Diversion & Management.
2. Operating on / around the Public Road
SKILL / TRAINING:
1. Road Works- Working on / around the Public
Roads.
INSPECTIONS & AUDITS:
1. Inspection & approval of Traffic Diversions
including safety arrangements, signal systems.
FORMATS & RECORDS:
1. Inspection & Approval records of Traffic
Diversions.
OTHER HSE MEASURES:
1. Ensure the Personnel are competent and made
aware of hazards of working on/ around the
public road.
2. Ensure the diversion/ temporary roads are
properly designed for intended Traffic Load.
3. Ensure availability of proper signs, crash barriers,
warning signs, signals etc.
4. Ensure the personnel are provided with required
PPE including Fluorescent jacks.
5. Ensure the night time warnings lights are in place
and in working condition.
6. Ensure the movements of construction
machineries are restricted to construction areas &
minimum interference with the public traffic.
7. Ensure banks-man / signal-man are available to
guide construction machineries in/ out of the
construction area.
8. Ensure removal of the temporary access,
warning, sign posts, signal systems, crash barrier
at the completion of the Road works.
9. Ensure Emergency preparedness
ASPECTS/ HAZARDS / WORST CASE
Sr. No. ACTIVITY THREATS CONTROLS THAT CAN MINIMIZE THE RISK RESPONSIBILITY
SOURCE OF HAZARDS EVENTS/ IMPACTS

ENGINEERING:
1. Proper Area Drawing & Location information
PROCEDURE :
1. Lack of Information
1. Getting Lost 1. Site survey Procedure
2. Vehicle not maintained
2. Vehicle Breakdown 2. Journey Management
Communication Failure
3. Occupational Illness 3. Emergency Preparedness
3. Exposure to adverse climatic
4. Snake Bites, Scorpion SKILL / TRAINING:
condition
Bites, vector bites 1. Tool box talks Site engibeer/Site
1 SITE SURVEY 4. Lack of Information about the
5. Heat Stress Personal Injury 2. Hill driving training incharge
Animals, vectors etc.
6. Damage to the 3. First Aid
5. Lack of Protective Measures
vegetation. INSPECTIONS & AUDITS:
6. Lack of Medical Facility
7. Damage to existing 1. Daily, Monthly checks for Vehicles
7. Lack of protection against sun
facilities OTHER HSE MEASURES:
8. 10.Lack of access Route
1. Vehicle condition Checks
2. First Aid item checks
3. Communication Equipment
1. The type & soil characteristic not ENGINEERING:
identified & excavation is not 1. Design of the Excavation in line with the soil type
1. Soil Type & Location
designed in line with the soil type. & characteristic and work requirements.
2. Dimension of the
2. The UG services not identified PROCEDURE :
excavation
prior excavation, exposed & 1. Safe Excavation procedure.
5. Mechanized
protected. SKILL / TRAINING:
Excavation
3. Lack of PTW & Excavation permit 1. PTW, Excavation & Confined space entry Permit
6. Manual Excavation
4. The excavation carried out without identifying the 2. Machineries Operation (Rock Breaker/ excavators)
7. Contamination in the
depth of water table, causing collapse. 3. Banks-man training
soil
6. The Excavated area is not protected with hard INSPECTIONS & AUDITS:
8. Vegetation
barricading, no warning. 1. Excavation, Access & Side protection measures.
9. Reptiles, vectors & pests. Collapse of the
9. Depending on the dimensions of the excavation, 2. Confined Space procedure implementation.
10. No of personnel involved sides of
side protection, benching / slopping not provided. 3. PTW system Implementation
11. Type of Activity planned. excavation Site engibeer/Site
2 EXCAVATION 11. The deep excavation is not considered as confined FORMATS & RECORDS:
12. Time of presence. trapping incharge
space and no precautions taken. 1. PTW, Excavation & confined space entry permits.
13. confined space personnel.
12. No proper access & exit route planned. 2. Excavation inspection & approval.
14. Accumulation of gases Personal injury
13. In the event of use of rock 3. Confined space entry procedure & access control system
15. Soil/ material stacking
breaker/ Jack hammer personnel not provided with OTHER HSE MEASURES:
near the excavated
noise protection measures. 1. Ensure the personnel are made aware of the requirements while excavation.
area
14. The Materials not stacked away from the 2. Ensure the sides of the excavation is well protected by shoring, slopping or benching.
16. Machineries
excavated area, causing overloading of the sides. 3. Ensure proper access is maintained in the area.
Operating
15. Machineries operating too close to the excavated 4. Where required, depending on the water table dewatering system is provided.
17. Benching, steps &
area. 5. Ensure hard barricading & warning lights to restrict unauthorized access / stray animal entry.
Side protection
16. No gas testing carried out No banks man used 7. Ensure the excavated materials stacked at least 3 m away from the sided & machineries
18. Overhead Electrical
while excavating with machineries. operation is restricted beyond 2 m away.
hazards.
17. Vegetation, presence of reptiles, 8. Ensure all personnel are provided with appropriate PPE.
vectors, pests not considered. 9. PTW system is implemented & Banks-man used.
ENGINEERING:
1. Enhance mechanized process for road work activities.
INSPECTIONS & AUDITS:
1. Inspection & approval of heavy Plant & machineries.
2Operation of Roller compactor & Tire roller.
1. Lack of pre job preparation including traffic 3 Road markings, sign post & signals.
management, 4 Public road use
1. Operation of construction
road diversion warnings etc. 1. Lack of pre job preparation including traffic management, road diversion warnings etc.
machineries including
2. Lack of inspection, maintenance 2. Lack of inspection, maintenance
grading & compaction
& approval of the heavy machineries & approval of the heavy machineries
2. Laying & compaction
3. Lack of competency for the operators (not licensed, 3. Lack of competency for the operators (not licensed, not experienced to operate).
of Granular base.
ROADWORK’S not 4. Lack of banksman & supervision to control the movements of plants & machineries.
3. Curb stone fixing.
(STONE FIXING, experienced to operate). 5. Roller / compactor operator is not tested of “White Finger Disease” due to vibration.
4. Application of Hot Vehicle Accident Site engibeer/Site
3 COMPACTION, 4. Lack of banksman & supervision to control the 6. Personnel not aware of hazards of Compressed air application.
Bitumen as binder Personal Injury incharge
LEVELING & ROAD movements of OTHER HSE MEASURES:
5. Operation of Roller
MARKINGS) plants & machineries. 1. Ensure the personnel are made aware of hazards associated with road works specially for manual
compactor & Tire roller.
5. Lack of Approved heating arrangements. handling, molten Bitumen application.
6. Road markings, sign
6. Lack of fire protection arrangements for handling 2. Ensure appropriate PPE are available & provided to all personnel including fume respirator mask,
post & signals.
open flames. rubber gloves & boots, goggles, ear muffs, fluorescent Jackets etc..
7. Dust, Noise & Vibration
7. Lack of Emergency preparedness 3. Ensure the First Aid facilities are available in the area.
8. Public road use
8. Lack of PPEs 4. Ensure effective traffic management, including temporary roads, diversions, signage, signals etc.
9. Lack of competency for the road works 5. Ensure licensed, qualified & competent operators are employed for driving & operating the plants
&
machineries.
6. Ensure the all vehicles, plant & machineries are inspected, maintained & approved. Safety
features like reverse horn, flickering lights are installed,
7. Ensure banks-man supervises the movement of vehicles & machineries within the facility.

ENGINEERING:
1. Design of the Road crossing in line with the site condition.
1. Soil structure
2. Selection of site, design of the road including access & exits.
2. Underground Water table.
PROCEDURE :
3. Traffic condition
1. Open cut road Crossing
diversion /stoppage
SKILL / TRAINING:
4. On road traffic & speed.
1. Working in/ near Vehicular traffic Road.
5. Collapse of the road 1. Traffic load not assessed & no arrangement made
2. Working with Road cutting M/c.
6. Material Handling for the traffic safety.
INSPECTIONS & AUDITS:
7. Workers working on 2. The Machineries are not maintained. Collapse of the Site engibeer/Site
4 ROAD CUTTING 1. Audit of the Traffic management
the road 3. Personnel not aware of hazards of High Speed Road road. incharge
FORMATS & RECORDS:
8. Working with the road cutting Blade.
1. TBT & Permits to work records
cutting (high 4. Compaction & reinstatement of the road surface not
OTHER HSE MEASURES:
speed Blade) is not supervised
a. The Environmental survey is conducted
9. Working with the compacters
b. The Personnel working on or near the road are provided with florescent jackets.
10. Settlement in the
c. Proper arrangements are made to direct the traffic and warn the passer by.
road causing traffic
d. Ensure all personnel are communicated with the hazards associated.
accident
e. Ensure excavation is guarded and during night hours proper warning signs & barricades are
placed to ward off the stray animals & passer by.
ENGINEERING:
1. Design of the Traffic Diversions & temporary facilities in line with the intended Traffic Load.
PROCEDURE :
2. Operating on / around the Public Road
SKILL / TRAINING:
1. Road Works- Working on / around the Public
Roads.
1. Traffic load on the INSPECTIONS & AUDITS:
1. Busy Traffic in the Public Road.
Public road 1. Inspection & approval of Traffic Diversions including safety arrangements, signal systems.
2. Deficiencies in design for Bypass, temporary access,
2. Bypass / temporary FORMATS & RECORDS:
diversions, road signs, signal system etc.
access / diversion. 1. Inspection & Approval records of Traffic
3. Personnel not aware of Road
WORKING ON/ 3. Personal working on/ Road Traffic Diversions.
Hazards Site engibeer/Site
5 NEAR PUBLIC near the road. Accident OTHER HSE MEASURES:
4. Personnel are not provided with Fluorescent jackets. incharge
ROAD 4. Traffic Management & Personal Injury 1. Ensure the Personnel are competent and made aware of hazards of working on/ around the public
5. Movement of the Construction Vehicles &
Signal System. road.
Machineries.
5. Construction Vehicles 2. Ensure the diversion/ temporary roads are properly designed for intended Traffic Load.
6. Traffic in around the working site
& Machineries 3. Ensure availability of proper signs, crash barriers, warning signs, signals etc.
is not effectively managed.
movement. 4. Ensure the personnel are provided with required PPE including Fluorescent jacks.
5. Ensure the night time warnings lights are in place and in working condition.
6. Ensure the movements of construction machineries are restricted to construction areas &
minimum interference with the public traffic.
7. Ensure banks-man / signal-man are available to guide construction machineries in/ out of the
construction area.
8. Ensure removal of the temporary access, warning, sign posts, signal systems, crash barrier
at the completion of the Road works.

ENGINEERING:
1. Design & safe erection of the temporary shutter
structure for concreting.
PROCEDURE :
1. Safe Concreting Procedure
SKILL / TRAINING:
3. Working at height for 1. Working at height
movement of man & Machineries 2. Use of electrically operated tools. (Vibrator & Power trowels)
4. Electrical operated INSPECTIONS & AUDITS:
machineries (Vibrator etc). 1. Inspection of the shuttering structure & supportssystem clearance for concreting operation.
5. Exposure to cement 1. The shuttering in not properly tied/ supports are not 2. Inspection for electrical systems & Portable tools.
adequate to take the load of the concrete. Fall from height / FORMATS & RECORDS:
dust & liquid cement
3. The Platform is not well designed to take care of the Collapse of the 1. System clearance checklist for concreting.
6 Concrete activity 6. Operation of
movements of the personnel & machineries supports. 2. Inspection checklist for the Electrical System.
Vibratory.
(Vibratory) Personal Injury OTHER HSE MEASURES:
7. Movement of the
vehicles & machineries. 4. The electrical operated machineries are not ELCB 1. Ensure the concreting activity is well panned, with rebar structure complete, shutters properly
8. Location of the protected and or poorly maintained. tied &
concreting activity. 5. Personnel are not aware of the cement dust & liquid supported and is inspected for adequacy of the intended concreting load.
9. Opening & Open cement hazards 2. Ensure suitable platform & access way is provided for safe working at height.
Edges. 6. The movements of the concrete miller, pumps are 3. Ensure the open edges/ openings are guarded
not controlled in the area. with hard Barricading.
7. The Pump operators & miller operator are not 4. Ensure the personnel are aware of the cement
competent. Dust hazard & Liquid cements hazards.
8. The Opening & open edges are not protected with 5. Ensure the personnel are provided with appropriate PPE including dust mask, rubber
Hard barricading. boots & gloves and fall protection system for working at height.
9. Movement over the rebar structure/ cage is not 6. Ensure electrically operated machineries are supplied from ELCB protected Source.
controlled, not provided with proper access. 7. Ensure guards are in place for the rotating parts.
10. Power trowel blades are 8. Ensure the movement of Plant & machineries are are guided by the Banks man.
exposed/ unguarded. 9. Ensure the Pump Operator & Miller operators are licensed & competent for the job.
ENGINEERING:
1. Design & safe erection of the temporary shutter
structure for concreting.
PROCEDURE :
1. Safe Concreting Procedure
SKILL / TRAINING:
3. Working at height for 1. Working at height
movement of man & Machineries 2. Use of electrically operated tools. (Vibrator & Power trowels)
4. Electrical operated INSPECTIONS & AUDITS:
machineries (Vibrator etc). 1. Inspection of the shuttering structure & supportssystem clearance for concreting operation.
5. Exposure to cement 1. The shuttering in not properly tied/ supports are not 2. Inspection for electrical systems & Portable tools.
adequate to take the load of the concrete. Fall from height / FORMATS & RECORDS:
dust & liquid cement
3. The Platform is not well designed to take care of the Collapse of the 1. System clearance checklist for concreting.
6 Concrete activity 6. Operation of
movements of the personnel & machineries supports. 2. Inspection checklist for the Electrical System.
Vibratory.
(Vibratory) Personal Injury OTHER HSE MEASURES:
7. Movement of the
vehicles & machineries. 4. The electrical operated machineries are not ELCB 1. Ensure the concreting activity is well panned, with rebar structure complete, shutters properly
8. Location of the protected and or poorly maintained. tied &
concreting activity. 5. Personnel are not aware of the cement dust & liquid supported and is inspected for adequacy of the intended concreting load.
9. Opening & Open cement hazards 2. Ensure suitable platform & access way is provided for safe working at height.
Edges. 6. The movements of the concrete miller, pumps are 3. Ensure the open edges/ openings are guarded
not controlled in the area. with hard Barricading.
7. The Pump operators & miller operator are not 4. Ensure the personnel are aware of the cement
competent. Dust hazard & Liquid cements hazards.
8. The Opening & open edges are not protected with 5. Ensure the personnel are provided with appropriate PPE including dust mask, rubber
Hard barricading. boots & gloves and fall protection system for working at height.
9. Movement over the rebar structure/ cage is not 6. Ensure electrically operated machineries are supplied from ELCB protected Source.
controlled, not provided with proper access. 7. Ensure guards are in place for the rotating parts.
10. Power trowel blades are 8. Ensure the movement of Plant & machineries are are guided by the Banks man.
exposed/ unguarded. 9. Ensure the Pump Operator & Miller operators are licensed & competent for the job.

Site engibeer/Site
incharge
ENGINEERING:
1. Safe design of the supports & sequence of
removal of the shuttering.
PROCEDURE :
1. Safe shuttering & de-shuttering operation.
1. Unauthorized use of circular saw.
2. Safe use of Circular saw (power Tools)
2. Wrong usages of the hand tools.
SKILL / TRAINING:
1. Use of the Circular saw. 3. Wrong usage of the Power &
1. Manual handling Operation.
2. Use of Hand Tools cartridge operated tools.
2. Working at Height
(Hammer/saw etc.) 4. Lack of safety arrangements for working at height.
3. Use of Power tools & cartridge operated tools.
3. Use of Power tools/ 5. Lack of PPE Site engibeer/Site
INSPECTIONS & AUDITS:
Cartridge operated tools. 6. Lack of information on the incharge
CARPENTRY 1. Inspection & approval of the Power tools and cartridge operated tools.
4. Working at Height manual handling procedure.
WORKS Fall from height / 2. Housekeeping Inspection
5. Manual Handling 7. Arrangements for stacking & de stacking is not up to
(CUTTING, Collapse of the 3. Electrical Inspection
7 6. Nails in the Lumber the requirements,
SHUTTERING & shuttering FORMATS & RECORDS:
7. Stacking/ Un-stacking 8. Nails in the lumber, shutters are
DESHUTTERING structure 1. Inspection & Approval records of the Power tools & cartridge operated tools.
of the wood etc. left unattended.
ACTIVITY) 2. Inspection & Test results of ELCB Tripping.
8. PPE 9. Temporary supports are not of
3. Inspection record for Housekeeping.
9. Electricity adequate strength.
OTHER HSE MEASURES:
10. Temporary supports 10. The sequence of de-shuttering is
1. All carpenters are experienced for the job.
11. Use of Steel nails. not established, leading to
2. Ensure the circular saw is properly maintained, all guards in place, push sticks available and
12. Housekeeping. unintentional collapse.
emergency stop switch is clearly marked and in accessible position.
11. Lack of House keeping
3. Ensure Lumbers/Ply-boards are properly stacked.
12. Electrical connection not protected through ELCB
4. Used Lumbers & Ply-boards are de-nailed (Nail bend) & properly stored.
5. Ensure unauthorized personnel are not allowed to use the circular saw.
6. Ensure the sawdust & debris are removed regularly from the area to avoid fire hazards.
7. Ensure “working at height” procedure is followed

ENGINEERING:
machineries &
Machineries & equipment 1. None
equipment
movement not restricted to the PROCEDURE :
2. Proximity to existing
ROW. 1. Maintenance of the water Tanker
facilities
2. The vehicles carrying back filling SKILL / TRAINING:
3. Movement of Tipper
material loads are not maintained 1. Driving / Operating heavy vehicle / equipments
Trucks with load
in proper condition. Accidents while 2. Operating the compactors
4. Driving on the Public
Laying Morum & 3. Drivers & operators are not operating INSPECTIONS & AUDITS:
road
8 watering on uneven qualified & trained to drive machineries 1. Daily Pre-use & Periodic Vehicle & Machineries
5. Operator Qualification
road /operate. causing Personal inspection.
6. Use of compactors
4. Lack of banks man while injury FORMATS & RECORDS:
7. Exposed Rotating
operating near to the existing 1. Inspection record of the Vehicle & machinery
parts
facility. OTHER HSE MEASURES:
8. Noise & vibration
5. Rotating parts not guarded 1. Ensure all rotating parts are properly guarded.
9. Exhaust from
6. Adverse climatic condition is not 2. Ensure all operators are properly trained.
machineries
assessed. 3. Ensure personnel are provided with PPE & welfare facility is maintained.
10. Climatic Condition
4. Ensure dedicated water tankers are used for the watering the morum,

ENGINEERING:
1. Proper sectionalizing of the pipeline & support arrangement and identifying the location of the
lifting points.
2. Lifting Equipments
1. Movement of personnel under / around the PROCEDURE :
(Farana, Pipe layer
suspended Load. 2. Safe lifting operation of the farana, side boom, pipe-layer.
ENGINEERING:
1. Proper sectionalizing of the pipeline & support arrangement and identifying the location of the
lifting points.
2. Lifting Equipments
1. Movement of personnel under / around the PROCEDURE :
(Farana, Pipe layer
suspended Load. 2. Safe lifting operation of the farana, side boom, pipe-layer.
etc.)
2. The condition of the lifting Equipments & SKILL / TRAINING:
3. Lifting Accessories
certification & maintenance standards 1. Side Boom Operator training on tandem lifts
4. Tandem Lifting
3. SWL is not marked & Load exceeds the SWL 2. Signal man training
5. Movement with Load
4. strength of the surface is not adequate for the INSPECTIONS & AUDITS:
Laying hume pipe 6. Heavy Machineries Failure of the
heavy vehicle movement 1. Inspection of the lifting Equipment & accessories Site engibeer/Site
9 under the ground movement lifting equipment /
5. Operator of the side boom / pipe layer/ farana is not 2. Pre lift inspection of the lifting points, trench preparation, de-slinging arrangements. incharge
for CD work. 7. Over head cables accessories
qualified or competent for the activity. FORMATS & RECORDS:
8. Operator & signal
6. Signal man is not trained for the Tandem lifts 1. Record of the Inspection of the Lifting Equipments & Accessories.
personnel
7. Failure of the Lifting equipments & accessories OTHER HSE MEASURES:
9. Support
12. Hot/ humid / windy condition 1. Ensure the unauthorized personnel are kept away from the suspended load.
10. Trench
leads to difficulties in performing 2. Ensure the slinging points are properly identified for the intended load, and the SWL for the lifting
11. Presence of personnel
the activity safely Equipments is not exceeded.
in the trench
3. Ensure the trench is kept clear of personnel when the pipe lowering is in progress.
12. Climatic Condition
4. Ensure overhead power lines are identified.
5. Proper communication is maintained.