ATS CONSTRUCTION INTERNATION INC.

5th flr, Yupancgo bldg. 1606 Trade St. corner Investment Drive, Madrigal Business
JOB SAFETY ANALYSIS (JSA) WORK SHEET Park Ayala Alabang Muntinlupa City
Tel. (+632) 403-9478 / 847-7306 / 808-5812,Fax. (+632) 808-5826

Work to be undertaken : Lifting and unloading of 20ft Container Van Area: Tempfacil area
Subcontractor : ATS Construction Int'l., Inc.
Start Date :
Personal Protection Required : (a) Safety Helmet X (b) Safety Footwear X (c) Full Body Harness X (d) Proper Hand Gloves X
(e) Eye Protection X (f) Respirator (g) Ear Protection (h) Face/Welding Mask X

SEQUENCE OF BASIC JOB STEPS IDENTIFIED SAFETY, ENVIRONMENTAL AND PROCEDURE HAZARDS HAZARDOUSE CONTROL

1. Preparation and setting of equipment ground condition, protruding objects, slip, trip and fall 1. conduct tool box meeting before start of works. 2. provide approved and valid permit to work.
struck by moving equipment, 3.equipment must have valid certificate approve by authorize 3rd party. 4. only certified rigger and

operator shall perform the task. 5. all riggings tools are inspected and color coded. 6. soil and ground

condition are inspected. 7. work area are properly isolated only involve person at the area and

Moving truck or equipment properly barricaded.8. provide spotter or signal man on equipment.

2. Travel of load to site, Moving truck and equipment, struck by, caught in between, fall of load or Check proper securing of load using appropriate web sling, and assign flagman

materials to direct traffic,

3. Lifting of container van from truck to ground location Fallling of equipment and load, crane collapse, line of fire 1. provide out rigger pod and out rigger are fully extent, 2. used 5 tons up nylon sling without

damaged, 3. identify swing radius of crane and properly barricaded 4. do not enter or stay

on the suspended load 5. Use two tag line to controlled the load. 6. rigger and operator coordination,

7. Stay away on the line of fire.

weather condition

4. Dismanlting of rigging equipment and housekeeping. Slip, trip hazards, pinch point, small particles / dust Always wear complete personal protective equipment.

Prepared by: Manny Porto

This JSA to be used in conjunction with Method Statement No._____________________


JOB SAFETY ANALYSIS (JSA)

Work to be undertaken : Instrument Installation Works


Subcontractor : ATS Construction Int'l., Inc.
Start Date : Feb. 10, 2017
Personal Protection Required : (a) Safety Helmet X (b) Safety Footwear X (c) Full Body Harness X (d) Proper Hand Gloves X
(e) Eye Protection X (f) Mask X (g) Ear Protection X (h) Face/Welding Mask

SEQUENCE OF BASIC JOB STEPS IDENTIFIED SAFETY, ENVIRONMENTAL AND PROCEDURE HAZARDS HAZARDOUSE CONTROL
1. Hauling and unloading of instrument struck by equipment/moving equipment observe 2meter distance rules on moving equipment inside the plant area

falling of load / equipment use proper lifting and unloading operation, manual handling procedures

site condition, Dust , noise Complete PPE's, mask and Ear plug

slip and trip housekeeping at the area, and proper storage of materials and tools.

heavy load, used adeqaute lifting equipment, do not enter under suspended load, use two taglines,

2. Installation of instrument falling materials, fall from height secure instrument materials at height and use adequate lanyard, 100 percent tie off, use full body

harness, during use of hand tools provide tool lanyard.

slip and trip clear access and conduct housekeeping at the area.

pinch point / caught in between identify and avoid line of fire, coordination with co workers , be aware of site condition, body body system

heavy load used adeqaute lifting equipment, do not enter under suspended load.

only competent person shall perform the task.

Fire remove all combustibla materials at the area, provide fire fighting

equipment and assigned fire watcher

site condition dust and high level of noise Complete PPE's, mask and Ear plug

Conduct tool box meeting prior start of works

Secure approve working permit from issuer prior to execution of works.

Prepared by: Manny Porto


This JSA to be used in conjunction with Method Statement No. V-3170-001-A-001
hhj]

JOB SAFETY ANALYSIS (JSA)

Work to be undertaken : Installation of support using scissor lift


Subcontractor : ATS Construction Int'l., Inc.
Start Date : Feb. 27, 2017
Personal Protection Required : (a) Safety Helmet X (b) Safety Footwear X (c)
(e) Eye Protection X (f) Mask X (g)

SEQUENCE OF BASIC JOB STEPS IDENTIFIED SAFETY, ENVIRONMENTAL AN

1. Hauling and unloading of support struck by equipment/moving equipment

falling of load / equipment

site condition, Dust , noise

slip and trip

heavy load,

2. Operation of scissor lift mechanical problem, scissor lift

struck by moving equipment

person or operator

working at height, fall

Personnel passing by

3. Installation of support falling materials, fall from height

slip and trip

pinch point / caught in between

heavy load

Fire

site condition dust and high level of noise


Prepared by: Manny Porto

This JSA to be used in conjunction with Method Statement No. V-3180-001-A-014-01


SIS (JSA)

Full Body Harness X (d) Proper Hand Gloves X


Ear Protection X (h) Face/Welding Mask

NTIFIED SAFETY, ENVIRONMENTAL AND PROCEDURE HAZARDS HAZARDOUSE CONTROL

k by equipment/moving equipment observe 2meter distance rules on moving equipment inside the plant area

g of load / equipment use proper lifting and unloading operation, manual handling procedures

ondition, Dust , noise Complete PPE's, mask and Ear plug

nd trip housekeeping at the area, and proper storage of materials and tools.

y load, used adeqaute lifting equipment, do not enter under suspended load, use two

hanical problem, scissor lift daily and weekly inspection and maintenance of the unit.

k by moving equipment observe 2meter distance rules on moving equipment inside the plant area and

on or operator only authorized and competent person shall operate the equipment.

ng at height, fall wear full body harness and observe 100% tie off. Do not stored materials on th

onnel passing by observe coning system inside line 1.

g materials, fall from height secure materials at height and use adequate lanyard, 100 percent tie off, use f

harness, during use of hand tools provide tool lanyard.

nd trip clear access and conduct housekeeping at the area.

h point / caught in between identify and avoid line of fire, coordination with co workers , be aware of site co

y load used adeqaute lifting equipment, do not enter under suspended load.

only competent person shall perform the task.

remove all combustible materials at the area, provide fire fighting

equipment and assigned fire watcher

ondition dust and high level of noise Complete PPE's, mask and Ear plug

Conduct tool box meeting prior start of works

Secure approve working permit from issuer prior to execution of works.


quipment inside the plant area

manual handling procedures

ge of materials and tools.

er under suspended load, use two taglines,

ce of the unit.

quipment inside the plant area and provide barrier.

operate the equipment.

e off. Do not stored materials on the flatform

e lanyard, 100 percent tie off, use full body

ol lanyard.

he area.

ith co workers , be aware of site condition

er under suspended load.

k.

a, provide fire fighting

prior to execution of works.


JOB SAFETY ANALYSIS (JSA)

Work to be undertaken : Instrument Installation Works


Subcontractor : ATS Construction Int'l., Inc.
Start Date : Feb. 10, 2017
Personal Protection Required : (a) Safety Helmet X (b) Safety Footwear X (c)
(e) Eye Protection X (f) Mask X (g)

SEQUENCE OF BASIC JOB STEPS IDENTIFIED SAFETY, ENVIRONMENTAL AN

1. Hauling and manual lifting of support Materials/Manual handling

Fall of materials, debris and tools

Work at height

site condition ( Heat , Dust and noisy )

2. Drilling of support along line 1&2 production line ( Pipe rack ) Fire

Power tools and operator

Small paticles, metals on eyes, falling of sma

line

Heat and dust

Work at height

Existing live wire, electricution

Existing over hear crane

3. fit up and bolting of support Fall of materials, bolts and tools

Ergonimics ( improper positioning )

4. Housekeeping, bringing down of power tools and extension cord. Slip, trip and fall
Prepared by: Manny Porto

This JSA to be used in conjunction with Method Statement No. V-3170-001-A-001


SIS (JSA)

Full Body Harness X (d) Proper Hand Gloves X


Ear Protection X (h) Face/Welding Mask X

NTIFIED SAFETY, ENVIRONMENTAL AND PROCEDURE HAZARDS HAZARDOUSE CONTROL

rials/Manual handling Proper procedures for manual handling, used mechanical lifter or pulley.

of materials, debris and tools used adequate tool lanyard, leather pouch for small items, fire blanket for sma

at height Proper access, eggress, cat walk and scaffold. Use fall portection, full body ha

lanyard, observe 100% tie off.

ondition ( Heat , Dust and noisy ) Proper PPE's Dust mask and ear plugs. Time Management and exposure to he

Secure approved work permit at the area.

Provide fire protection, fire watcher and fire extinguihser near the hot work are

er tools and operator Competent person shall operate the power tools. Power tools must be in good

approved by safety inspector( Valid sticker).

l paticles, metals on eyes, falling of small particles below production Provide fire catcher in the area where in the drilling activity. Use of face shield

coordination to production line area and provide spotter below the area. Provid

pipe rack.

and dust provide adequate ventalation and wear complete PPE'S.

proper access and working platform, use of tool lanyard and fall protection both

workers. Observe 100% tie off.

ing live wire, electricution Provide barricade at the live wire, do not step on the existing cable tray use wo

ing over hear crane Provide Hard barricade with signages ( do not enter beyond this point ) on the

of materials, bolts and tools Secured all support , materials and tools above by using adequate tool lanyard

nimics ( improper positioning ) proper positioning and posture,

clear the access all the time, adequate use of personal protective equipment.
ed mechanical lifter or pulley.

or small items, fire blanket for small debris.

old. Use fall portection, full body harness with two

e Management and exposure to heat.

extinguihser near the hot work area.

ools. Power tools must be in good condition and

drilling activity. Use of face shield for drilling.

vide spotter below the area. Provide safety net on the

plete PPE'S.

tool lanyard and fall protection both for materials and

p on the existing cable tray use working palform.

ot enter beyond this point ) on the over head crane.

ove by using adequate tool lanyard.

of personal protective equipment.


JOB SAFETY ANALYSIS (JSA)

Work to be undertaken : Hauling, Lifting of Empty 20ft container van


Subcontractor : ATS Construction Int'l., Inc.
Start Date :
Personal Protection Required : (a) Safety Helmet X (b) Safety Footwe X (c) Full Body Harness X (d) Proper Hand Gloves X
(e) Eye Protection X (f) Mask X (g) Ear Protection X (h) Face/Welding Mask X

SEQUENCE OF BASIC JOB STEPS IDENTIFIED SAFETY, ENVIRONMENTAL AND PROCEDURE HAZARDS HAZARDOUSE CONTROL
1. Preparatory Works ( Removal of Railings ) Falling obejcts, people or worker involve at work area Isolate the work area, provide barricade on affected area and standby person or watcher.
Fire, welding fumes, and hot molten metals Provide adequate fire blanket during cutting of railing with stanby fire watcher and fire extinguisher

at the work area. Affected area are properly barricaded.

Potential of fall due to open area Provide temporary hard barricade ( Scaffolding pipe 1 1/2" top and mid rail )

Miscommunication Coordination of activity at line 1 personnel and affected area.

site condition ( Heat , Dust and noisy ) Wear complete personal protective equipment.

2. Hauling of panel using 3 tons boomtruck from line 2 to mix plant. Falling of panel or load, operator or workers Qualified and competent person shall perform the activity. Approved lifting plan and work permit.

Moving Equipment and rigging tools, Equipment, operator and rigger are certified. Equipment and rigging tools are inspected prior to u

Miscommunication, weather and site condition Activity are properly coordinated to other contractor, provide coning system of entry and exit to li

and mix plant area.

Work area are properly barricaded ( Danger Tape )

3. Lifting of panel using telehandler from ground to 4th level mix plant area Falling of panel or load, Aprroved lifting plan and procedures. Panel should be secure and tie off on the pork.

Operator, workers Competent/qualified operator and rigger shall perform the activity.

Miscommunication Activity are properly coordinated to James hardie Line 1 and all worker invlove at the area.

Existing equipment at mix plant All entry and exit at mix plant from ground to 4th level or affected area should be properly barric

and assigned standby watcher.

Environment , Dust and noise Wear complete PPE's ear plug and dust mask.

4. Setting and bolting of panel Line of fire, pinch point Do not enter or put your self in the line of fire, communication and coordination with co-workers.

Panel and tools Use right tools for the right jobs. Wear complete PPE'S

5. Housekeeping Protruding wire , metals and support Housekeeping at workplace.

Dust and noise Wear complete PPE's