5th flr, Yupancgo bldg. 1606 Trade St. corner Investment Drive, Madrigal Business
JOB SAFETY ANALYSIS (JSA) WORK SHEET Park Ayala Alabang Muntinlupa City
Tel. (+632) 403-9478 / 847-7306 / 808-5812,Fax. (+632) 808-5826
Work to be undertaken : Lifting and unloading of 20ft Container Van Area: Tempfacil area
Subcontractor : ATS Construction Int'l., Inc.
Start Date :
Personal Protection Required : (a) Safety Helmet X (b) Safety Footwear X (c) Full Body Harness X (d) Proper Hand Gloves X
(e) Eye Protection X (f) Respirator (g) Ear Protection (h) Face/Welding Mask X
SEQUENCE OF BASIC JOB STEPS IDENTIFIED SAFETY, ENVIRONMENTAL AND PROCEDURE HAZARDS HAZARDOUSE CONTROL
1. Preparation and setting of equipment ground condition, protruding objects, slip, trip and fall 1. conduct tool box meeting before start of works. 2. provide approved and valid permit to work.
struck by moving equipment, 3.equipment must have valid certificate approve by authorize 3rd party. 4. only certified rigger and
operator shall perform the task. 5. all riggings tools are inspected and color coded. 6. soil and ground
condition are inspected. 7. work area are properly isolated only involve person at the area and
Moving truck or equipment properly barricaded.8. provide spotter or signal man on equipment.
2. Travel of load to site, Moving truck and equipment, struck by, caught in between, fall of load or Check proper securing of load using appropriate web sling, and assign flagman
3. Lifting of container van from truck to ground location Fallling of equipment and load, crane collapse, line of fire 1. provide out rigger pod and out rigger are fully extent, 2. used 5 tons up nylon sling without
damaged, 3. identify swing radius of crane and properly barricaded 4. do not enter or stay
on the suspended load 5. Use two tag line to controlled the load. 6. rigger and operator coordination,
weather condition
4. Dismanlting of rigging equipment and housekeeping. Slip, trip hazards, pinch point, small particles / dust Always wear complete personal protective equipment.
SEQUENCE OF BASIC JOB STEPS IDENTIFIED SAFETY, ENVIRONMENTAL AND PROCEDURE HAZARDS HAZARDOUSE CONTROL
1. Hauling and unloading of instrument struck by equipment/moving equipment observe 2meter distance rules on moving equipment inside the plant area
falling of load / equipment use proper lifting and unloading operation, manual handling procedures
site condition, Dust , noise Complete PPE's, mask and Ear plug
slip and trip housekeeping at the area, and proper storage of materials and tools.
heavy load, used adeqaute lifting equipment, do not enter under suspended load, use two taglines,
2. Installation of instrument falling materials, fall from height secure instrument materials at height and use adequate lanyard, 100 percent tie off, use full body
slip and trip clear access and conduct housekeeping at the area.
pinch point / caught in between identify and avoid line of fire, coordination with co workers , be aware of site condition, body body system
heavy load used adeqaute lifting equipment, do not enter under suspended load.
Fire remove all combustibla materials at the area, provide fire fighting
site condition dust and high level of noise Complete PPE's, mask and Ear plug
heavy load,
person or operator
Personnel passing by
heavy load
Fire
k by equipment/moving equipment observe 2meter distance rules on moving equipment inside the plant area
g of load / equipment use proper lifting and unloading operation, manual handling procedures
nd trip housekeeping at the area, and proper storage of materials and tools.
y load, used adeqaute lifting equipment, do not enter under suspended load, use two
hanical problem, scissor lift daily and weekly inspection and maintenance of the unit.
k by moving equipment observe 2meter distance rules on moving equipment inside the plant area and
on or operator only authorized and competent person shall operate the equipment.
ng at height, fall wear full body harness and observe 100% tie off. Do not stored materials on th
g materials, fall from height secure materials at height and use adequate lanyard, 100 percent tie off, use f
h point / caught in between identify and avoid line of fire, coordination with co workers , be aware of site co
y load used adeqaute lifting equipment, do not enter under suspended load.
ondition dust and high level of noise Complete PPE's, mask and Ear plug
ce of the unit.
ol lanyard.
he area.
k.
Work at height
2. Drilling of support along line 1&2 production line ( Pipe rack ) Fire
line
Work at height
4. Housekeeping, bringing down of power tools and extension cord. Slip, trip and fall
Prepared by: Manny Porto
rials/Manual handling Proper procedures for manual handling, used mechanical lifter or pulley.
of materials, debris and tools used adequate tool lanyard, leather pouch for small items, fire blanket for sma
at height Proper access, eggress, cat walk and scaffold. Use fall portection, full body ha
ondition ( Heat , Dust and noisy ) Proper PPE's Dust mask and ear plugs. Time Management and exposure to he
Provide fire protection, fire watcher and fire extinguihser near the hot work are
er tools and operator Competent person shall operate the power tools. Power tools must be in good
l paticles, metals on eyes, falling of small particles below production Provide fire catcher in the area where in the drilling activity. Use of face shield
coordination to production line area and provide spotter below the area. Provid
pipe rack.
proper access and working platform, use of tool lanyard and fall protection both
ing live wire, electricution Provide barricade at the live wire, do not step on the existing cable tray use wo
ing over hear crane Provide Hard barricade with signages ( do not enter beyond this point ) on the
of materials, bolts and tools Secured all support , materials and tools above by using adequate tool lanyard
clear the access all the time, adequate use of personal protective equipment.
ed mechanical lifter or pulley.
plete PPE'S.
SEQUENCE OF BASIC JOB STEPS IDENTIFIED SAFETY, ENVIRONMENTAL AND PROCEDURE HAZARDS HAZARDOUSE CONTROL
1. Preparatory Works ( Removal of Railings ) Falling obejcts, people or worker involve at work area Isolate the work area, provide barricade on affected area and standby person or watcher.
Fire, welding fumes, and hot molten metals Provide adequate fire blanket during cutting of railing with stanby fire watcher and fire extinguisher
Potential of fall due to open area Provide temporary hard barricade ( Scaffolding pipe 1 1/2" top and mid rail )
site condition ( Heat , Dust and noisy ) Wear complete personal protective equipment.
2. Hauling of panel using 3 tons boomtruck from line 2 to mix plant. Falling of panel or load, operator or workers Qualified and competent person shall perform the activity. Approved lifting plan and work permit.
Moving Equipment and rigging tools, Equipment, operator and rigger are certified. Equipment and rigging tools are inspected prior to u
Miscommunication, weather and site condition Activity are properly coordinated to other contractor, provide coning system of entry and exit to li
3. Lifting of panel using telehandler from ground to 4th level mix plant area Falling of panel or load, Aprroved lifting plan and procedures. Panel should be secure and tie off on the pork.
Operator, workers Competent/qualified operator and rigger shall perform the activity.
Miscommunication Activity are properly coordinated to James hardie Line 1 and all worker invlove at the area.
Existing equipment at mix plant All entry and exit at mix plant from ground to 4th level or affected area should be properly barric
Environment , Dust and noise Wear complete PPE's ear plug and dust mask.
4. Setting and bolting of panel Line of fire, pinch point Do not enter or put your self in the line of fire, communication and coordination with co-workers.
Panel and tools Use right tools for the right jobs. Wear complete PPE'S