RISK - ASSESMENT

TRADE:- FIRE ALARAM AND PUBLIC AUDIO DATE: - 26-12-18.


COMPANEY: - HONEYWELL AUTOMATION INDIA PVT LTD LOCATION: - G,10th,12th,13th.
SITE: - SYNECHRON SITE REVIEW DATE: - 26-03-19.
PREPARED BY: - SHAIK NAVEED CONTACT NO: - 9676062050.

People at Further Action


sub
S.NO Activities activities Potential hazards risk and Risk rating action New risk rating moniting
how? required by whome?

L C R L C R
1.obstructed access
&egress.
2.slip,trip &fall.
3.bulky & heavy load.
4.improper handling of
material.
5.miss-communication. 1.provided the
6.lack of awarness. full body supervisor/sit
material taking 7.fall of materials on foot. harness. e
manual or material to 8.lack of man power. 2. providing the engineer/saf
1 2 3 6 1 2 2
machine the 9. lack of ppe's. safety net/life ety
shifting workpace 10.lack of supervision. line where it is engineer/site
needed. incharge
1.arranging
the tools for 1. lack of ppe's.
marking. 2.unauthorized person. Risk to the 1.inspected the
3. sharp edged. operative of scaffold perior
2.accemble 4. fall from hight. injury/medi to the work. supervisor/sit
marking or the 5.improper structure of cal 2.assemble the e
drilling or scaffoled for scaffoled. treatment / scaffoled engineer/saf
2 anchoring the activity. 6.defective wheels &bracks. fatal caused properly. ety
work 7.unsafe platform. by 3.provided the engineer/site
3.make 8.untrained scaffolders. unawarness proper safety incharge
drilling 9.lack of training. of matrial rails to the
activities for 10.improper access of for handling scaffold.
cable laying. scaffoled at work place.
11.unsafe condition of
equipment.
12.poor quality of tools.
13.improper cable
managments.
14.electrical hazards.
15.lack of inspection &
maintenace.
3 cable laying
work 1