PROJECT NAME : GREAT FOOD SOLUTIONS - RTE PLANT (MECHANICAL WORKS) REFERENCES/LEGAL REQUIRE

1100,1230, 1410 CONST.SAFETY


LOCATION : LNPI COMPLEX STA ROSA LAGUNA
PERMITS/COMPETENCIES REQ
CONTRACTOR : MAYEKAWA/ ASAHI ASIA CONSTRUCTION INC. JHA, HOTWORKS, WORKING AT
STATEMENT/METHODOLOGY
GEN. CONTRACTOR : ARCHEN TECHNOLOGIES
EQUIPMENTS / TOOLS REQUIRED: ARGON , WELDING MACHINE, OXY- PPE REQUIRED:
ACE, CHAIN BLOCK, MOBILE CRANE, FORKLIFT, PALLET TRUCK , OTHERS : FULL BODY HARNESS,APRON,
POWER TOOLS, HAND TOOLS, TIG TORCH,CUTTING OUTFIT, ROYAL EAR PLUG, FULL FACE SHIELD
CORD, PANEL BOARD ETC.

JOB HAZARDS ANALYSIS

ACTIVITY : INSTALLATION OF PIPES and Support UNIT COOLER INST. And Support (mechanical piping works) D

RISK LEVEL: H= HIGH M= MEDIUM L= LOW N= NEGLIGIBLE


INITIAL
STEP JOB /TASK STEPS POTENTIAL HAZARDS SAFE WORK / CONT
RISK LEVEL
in-adequate training, consultation 1.Review contractor site safety
and planning medium competent supervision 3. provid
completed safely
lack of competence
Plan the job prior to arrive at 1.ensure all workers are adequa
1 medium
site to undertake work

untrained personnel commencing


works medium 1.all workers to have general in

First day on site entry to unsafe


areas 1.Report to site office all worker
medium
induction/orientation
2 Entry to jobsite
accessing site via other means 1.entry to site via main gate dire
than the main gate can lead to site medium 2. review site access and delive
exposure hazards temporary faclities
if site mangement are unaware of
Site inspection identify site work being carried out then 1. review site emergency evacu
workers will be unaccounted in the medium
condition management work activity for th
event of evacuation

failure to follow traffic management


3 plan can lead to injury, damage to 1.ensure traffic management pr
vehicle and equipment medium
management are followed

prepared by: reynaldo ramos {safety officer} Page 1


3

ignoring site safety signages can


lead to exposure to hazards and 1. become familiar with site safe
medium
non-compliance site safety plan instruction (e.g. wearing of appr

collision with other vehicles, 1. the site should be designed c


overloading, reckless driving, follow safe vehicle movement a
Materials delivery at jobsite slippery roads, physical injury, bad pedestrian 2. do not overload 3
4 high
unloading of materials weather condition, overhead unloading area 4. provide a ma
powerlines avoid rolling of pipes.

1. hot works permit must be ava


completed 2. wear proper PPE
apron, hand protection, googles
eye injury, fumes, noise, cut cumbustible materials 4. thorou
5 Fabrication of pipe support high before and after job task.5. ens
laceration, fire, burn, electrecution
condition and check for damage
electrical wiring installed (e.g. ro

1. Proper techniques when liftin


pinched, back injury, cut/laceration, help of hauling pipes manually r
hauling of pipe and pipe
6 struck by,crushing, slip/trip. high use pallet truck, trolly or boom t
support to installation area
Strain/sprain injury unloading 4. use mechanical eq
and heavy load

1. install scaffolding work platfo


inspected 2. certified rigger to s
lifted load falling from above or un
place using wire rope or chain b
controlled lifted load causing injury
erecction and installation of on all lifted loads 4. correct rigg
7 and damage to property/ high
c- channel support cummunication to be used at al
equipment, fatality, crushing injury,
area, spotter to control site acce
slip/trip,Pinched, fall hazards
at height must wear full body ha
lifeline/anchorage

1. install scaffolding work platfo


inspected 2. certified rigger to s
lifted load falling from above or un
place using wire rope or chain b
controlled lifted load causing injury
Lifting pipes into position on all lifted loads 4. correct rigg
8 and damage to property/ high
area using chain block cummunication to be used at al
equipment, fatality, crushing injury,
area, spotter to control site acce
slip/trip,Pinched, fall hazards
at height must wear full body ha
lifeline/anchorage

1. install scaffolding work platfo


inspected 2. certified rigger to s
lifted load falling from above or un
place using wire rope or chain b
controlled lifted load causing injury
Unit Cooler installation and on all lifted loads 4. correct rigg
9 and damage to property/ high
erection/unit cooler support cummunication to be used at al
equipment, fatality, crushing injury,
area, spotter to control site acce
slip/trip,Pinched, fall hazards
at height must wear full body ha
lifeline/anchorage

prepared by: reynaldo ramos {safety officer} Page 2


pinched, fall hazards, physical 1. fitting up pipes to be done by
10 Fitt-up of pipes high
injury certified pipe fitter

1. when working at elevated are


platform properly checked and i
system hotworks,working at hei
equipped with fire extinguisher
welding,cutting and grinding wo
eye injury,fire hazards caused by must be removed or screen from
burns, sparks and flashes, wear proper PPE welding mask
welding, cutting and grinding
11 fumes,dust, noise,welding slags, high face shield, googles or respirato
of pipes
poor ventillation, falls, lifeline/anchorage when working
electrecution, poor housekeeping management in place and elect
certified electrician 8. effective h
after job task

1. know the classification of pai


fall hazard, slip/trip, hazardous
(MSDS) 2. wear appropriate PP
Application of primer paint to vapours from paint, fire, ergonomic
12 high lifeline/anchorage, hand gloves
pipes and pipe support hazard, heat stress, dust ,
not apply paint on near welding
electrecution
overhead powerlines, electrical

1,approved procedure and eme


available and understood 2.radi
exposure to radiation, biological with crew 3. ensure permit to w
Radiographic testing of changes in humans, radiation proper barricade, warning signs
13 high
welded pipies injury, radiation sickness, fall RADIOGRAPHIC TEST IS IN P
hazards AWAY''and constant monitoring
available at site , toolbox talks p
work platform / scaffolding when
wear full body harness and lifeli

1.restriction notice and barricad


the system subject for testing 2
high pressure leak, over pressure, ''DANGER HYDROSTATIC and
burst pipe/hose, noise, slip/trip, fall PROGRESS KEEP AWAY''3.do
Pressure Testing
14 hazard, dust, rotating equipt, high beyond required specification 4
(Hydrostatic & Pneumatic)
electrecution, spillage, physical provide work platform/scaffoldin
injury and wear full body harness lifeli
communication during testing, h
start jobtask, pressure relive va

1. effective housekeeping works


poor housekeeping, obstruction
ease the flow of materials 3.clea
pipe materials and scraps, slip/trip
removal of unwanted materials
15 Housekeeping works hazards, cutting/puncturing, tearing high
proper materials stacking/pile o
of hands and or body parts, fire
warning sign to keep away peop
hazard due to poor housekeeping
materials.

prepared by: reynaldo ramos {safety officer} Page 3


PREPARED BY: NOTED BY:

REYNALDO E. RAMOS ENGR. LITO GUEVARRA- PROJ.


SAFETY OFFICER ENGR. JOSHUA ENOJAS - PROJ
RICHARDLEE ORZAME - MPC O

prepared by: reynaldo ramos {safety officer} Page 4


LEGAL REQUIREMENT: OSH STANDARDS, D.O, 13, RULE 1080,
CONST.SAFETY PROGRAM
PETENCIES REQUIRED: SITE SAFETY MANUAL, EXECUTION PLAN,
KS, WORKING AT HEIGHT,LIFTING PLAN, METHOD
ETHODOLOGY

S,APRON,

works) DATED :

EGLIGIBLE
REVISED ACTION BY
E WORK / CONTROL MEASURES RISK DATELINE
LEVEL
actor site safety plan 2. Provide adequate Foreman
ervision 3. provide equipt. to ensure job low Supervisor
ly all workers
Foreman
rkers are adequately trained and competent
low Supervisor
ork
all workers
Foreman
have general induction/orientation low Supervisor
all workers
Foreman
office all workers to undertake
low Supervisor
ation
all workers
ia main gate directed by site management Foreman
ccess and delivery area 3. provide low Supervisor
ies all workers

Foreman
mergency evacuation plan and advise site
low Supervisor
ork activity for the day
all workers

Foreman
management procedures developed by site
low Supervisor
re followed
all workers

prepared by: reynaldo ramos {safety officer} Page 5


Foreman
liar with site safety signs and follow all
low Supervisor
wearing of appropriate PPE)
all workers
ld be designed constructed to maintain and
cle movement and separate vehicle from Foreman
o not overload 3. barricade the area of low Supervisor
4. provide a materials rack filing system to all workers
pipes.

rmit must be available and properly


ear proper PPE such as welding mask,
otection, googles 3. remove any
aterials 4. thorough housekeeping works Foreman
r job task.5. ensure power tools is in good low Supervisor
heck for damage 6. provide approved all workers
installed (e.g. royal cord)

iques when lifting object 2. ask someone for


pipes manually rather just one person 3. Foreman
, trolly or boom truck for loading and low Supervisor
e mechanical equipt. When hauling bulky all workers

ding work platform properly check and


rtified rigger to sling loads, secure loads in
e rope or chain block 3. tagline to be placed
Foreman
s 4. correct rigging signals and total
low Supervisor
to be used at all times 5. barricade work
all workers
control site access.6. all workers working
wear full body harness and
ge

ding work platform properly check and


rtified rigger to sling loads, secure loads in
e rope or chain block 3. tagline to be placed
Foreman
s 4. correct rigging signals and total
low Supervisor
to be used at all times 5. barricade work
all workers
control site access.6. all workers working
wear full body harness and
ge

ding work platform properly check and


rtified rigger to sling loads, secure loads in
e rope or chain block 3. tagline to be placed
Foreman
s 4. correct rigging signals and total
low Supervisor
to be used at all times 5. barricade work
all workers
control site access.6. all workers working
wear full body harness and
ge

prepared by: reynaldo ramos {safety officer} Page 6


Foreman
es to be done by only experienced and
low Supervisor
ter
all workers

g at elevated area ensure scaffolding work


ly checked and inspected 2. ensure PTW
s,working at height 3. provide fire watcher
re extinguisher during 15-30 minutes after
and grinding works 4. cumbustible material
ed or screen from slag heat and sparks 5.
E welding mask, apron, hand gloves, full Foreman
ogles or respirator 6. wear full body harness low Supervisor
ge when working at height. 7. cable all workers
place and electrical wiring maintain with
ian 8. effective housekeeping before and

ssification of paint hazards and precautions


r appropriate PPE full body harness Foreman
ge, hand gloves, respirator, dust mask 3. do low Supervisor
on near welding works 4. look out for all workers
rlines, electrical live wires.

cedure and emergency planning in place,


nderstood 2.radiation monitoring device
sure permit to work in place 4, erection of
Foreman
e, warning signs ''DANGER
low Supervisor
IC TEST IS IN PROGRESS KEEP
all workers
stant monitoring 5. emergency took kit
, toolbox talks prior to start of work 6.install
scaffolding when working at height and
harness and lifeline/anchorage.

ice and barricades shall be provided around


ject for testing 2.provide warning sign
DROSTATIC and PNEUMATIC TEST IS IN
EEP AWAY''3.do not overpressure the pipe Foreman
d specification 4.wear appropriate PPE 5. low Supervisor
atform/scaffolding when working at height all workers
ody harness lifeline/anchorage 6. proper
during testing, hand tools training prior to
essure relive valve to be installed.

sekeeping works 2. reduce handling to


f materials 3.clean up during the shift 4.
Foreman
anted materials and debris and scraps 5.
low Supervisor
s stacking/pile of pipes 6.provide barrier or
all workers
keep away people in case of rolling pipe

prepared by: reynaldo ramos {safety officer} Page 7


EVARRA- PROJ. MANAGER
ENOJAS - PROJ. IN CHARGE
RZAME - MPC OSH PRACTITIONER