Trimurti Fabricators Pvt Ltd.

DATE: 13/6/2022

PROJECT: PERSTORP – ELEPHANT PROJECT

MONSOON PROTECTION PLAN

SL.NO. ASSOCIATED RISK CONTROL MEASURES PRESENT STATUS RESPONSIBILITIES REMARKS


AREA
1 Approach/accessible road 1. Avoid slippery roads. 1. Implemented RCM
for staff, workers & 2. Safe approach for cranes, 2. Implemented
vehicles vehicles Etc.

2 Electrical connection, 1. Canopy provided to all PDB 1. Implemented Electrician


earthling, boards/panels, panel boxes. 2. Implemented
and halogen to be covered. 2. Double body earth provided to
all PDB & Extension Board. 3. Implemented
3. Electrical rubber mat provided
to all PDB. 4. Implemented
4. All portable power tools to be 5. Implemented
stored in a dry place.
5. Tarpaulin provided for all
welding and grinding m/c
during rainy

3 Project workplace area 1. Arrange tarpaulin to protect all 1. Implemented RCM, Safety Officer
power tools. 2. Implemented
2. Inform all operators not to 3. Implemented
move closer to the excavated 4. Implemented
area. 5. Implemented
3. Tell all to workers avoid slippery 6. Implemented
roads. If non-avoidable use the 7. Implemented
suitable PPE for work. 8. Implemented
4. Ensure daily check of the
Trimurti Fabricators Pvt Ltd. DATE: 13/6/2022

PROJECT: PERSTORP – ELEPHANT PROJECT

MONSOON PROTECTION PLAN

scaffolding before the


commencement of work.
5. Restrict Erection work at height
during rainy.
4 Hot Work Activities in 1. Hot work (welding/grinding) 1. Implemented RCM/Site Engineer
Monsoon plan will be carried out in a dry place 2. Implemented
area and a tarpaulin provide for 3. Implemented
height work. 4. Implemented
2. Insulated S hook provided.
3. All power cable cords route
overhead.
4. Do not work in wet
conditions/rainy

4 Monsoon PPE’s 1. Safety Gumboots to all. 1. Not Implemented RCM, Store In-charge Inform RCM
2. Raincoats 2. Not Implemented before starting
3. All the PPE & tools to be stored 3. Implemented the monsoon
in a dry place 4. Implemented provides
gumboots and
4. All mandatory PPE must be
raincoats.
worn.
5 Workmen’s 1. Prevent contaminated drinking 1. Implemented Admin/HR
colony/hutment. water. 2. Implemented
2. Do not wear wet clothes.

6 Construction material & 1. GI Shed Provided Chemical & 1. Implemented RCM, Store In-charge
chemical storage. contraction material. 2. Implemented
2. Drip tray provided for chemical.
Trimurti Fabricators Pvt Ltd. DATE: 13/6/2022

PROJECT: PERSTORP – ELEPHANT PROJECT

MONSOON PROTECTION PLAN

7 Temporary monsoon 1. Pota Cabin for staff 1. Implemented RCM


protection shed for staff & 2. GI Sheet Shed provided for 2. Implemented
workers workers. Near TFPL store. 3. Implemented
3. Temporary rest shed provided
in PEB warehouse for workers.

8 Working at height 1. Tarpaulin to be provided 1. Implemented Rcm & Safety Officer


2. Ensure daily check of the 2. Implemented
scaffolding before the 3. Implemented
commencement of work. 4. Implemented
3. Restrict Erection work at height
during rainy.
4. If the scaffold wet condition
work should be stopped.
9 First aid and medical 1. First aid box Available 1. Implemented Rcm & Safety Officer
treatment at the site. 2. Perstorp OHC. 2. Implemented

10 Monsoon Safety 1. Awareness program 1. Not Implemented Safety Officer


Precaution/Awareness 2. Sign Board 2. Not Implemented
Program & Displays.
Monsoon decease
precaution.

11 Lightning arrester 1. Body earthing provided 1. Implemented Electrician


to porta cabin.
Trimurti Fabricators Pvt Ltd. DATE: 13/6/2022

PROJECT: PERSTORP – ELEPHANT PROJECT

MONSOON PROTECTION PLAN

Prepared By: Sign Approved By: Sign