TASK TITLE: Welding cutting & grinding Date: Activity: Welding cutting & grinding inside Storage Tank TRA No. Location: Description: Confined Space entry in storage tank for welding, cutting grinding. [Day+Night] RISK AL EVALUATION RESIDUAL S/ ACTION TO BE TAKEN AR (Refer to RISK No HAZARD HAZARD EFFECT Evaluation form) CONTROLS P . Y/ S P R DESCRIBE ACTION MANPOWER S P R N 1. Perform detailed gas analysis by a competent person. 2. Gas meter should be Calibrated 3. No entry will be allowed unless Oxygen level is achieved within 20.8 - 1. Gas monitoring as 21.0%. per the define 4. The overall environment inside frequency confined space (temperature, humidity, 2. Confined space 1. visibility etc) should be conducive for SPA: Site ventilated. Unconsciousness human entry. Supervisor 3. Mutual Oxygen Deficiency / Fatality 5. Forced ventilation with the help of CSA/SBM, 1. E 8 11 communication plan E 4 7 Yes 2. Recordable blowers / ejectors will be ensured. In Safety between SBM & Injury case of no ventilation, no entry will be Watchman Entrant allowed, no electrical cables contact with AGT (SGS) 4. Time interval for the tank maximum duration of 6. Set mode of communications (Visual work followed rest. Eye Contact, Voice Contact, Whistling, and Tagline Signals) to be established and practiced between CSA & Entrant. 7. Emergency response plan (ERP) to be followed accordingly in case of emergency. 1.Adequate lightening 1.Recordable 1. Ensure adequate lighting Welding arrangements, Injury due to arrangements during night to avoid any Supervisor Poor illumination F 8 10 2. Work in adequate F 4 5 Yes 2. darkness serious accident. 2. Safety light. 2. Stop the job if darkness encounter. Supervisor SPA: Site 1. Don’t panic in the result of power 1. Controlled Supervisor Power failure in Personnel injury failure in confined space. 3. G 8 9 evacuation CSA/SBM, G 2 3 Yes confined space due to panic 2. Ensure Controlled evacuation 2. Emergency light Safety Watch 2. Hand torch should be available 1. Controlled (24 volts) and protected 1. controlled voltage electrical supply to be ensured in the SPA: Site inside confined space confined space. Supervisor 2. Connections through 2. Ensure the use of ELCB CSA/SBM, 4. Electrocution 1.Fatality E 8 11 ELCB. 3. Lighting arrangements should be as E 1 4 Yes Safety 3. Industrial electrical per standards, mean proper fixation, use Watchman appliances of grounding cables and ELCB to be 4. Equipments checklist 4.Checklisted Equipments to be used duly inspected by inspectors. Supervisor 1. Recordable Awkward ingress & 1. Use proper access 1. Use proper access way provided for CSA/SBM, 5. Injury F 7 9 F 2 4 Yes egress way for entry and exit. entry & exit. Safety Watchman 1. Simultaneous activities are strictly not Fatality, allowed while working at height. Supervisor, Recordable 1.No parallel activity 6. SIMPOS E 6 9 2. Access control to be implemented Safety Watch E 2 5 Yes Injury, 2.Access control 3. Entry of unauthorized personnel is not allowed 1. Proper railing system should be erected to prevent the falling of personnel. 1. Guard railing 2.. All the workforce required to use Falling from height Supervisor, 1. Fatality due to 2. Use of PFAS mandatory PPE’s including additional 7. from S/F inside Safety head injury E 7 9 3. Install toe Boards PPE’s Such as safety harness belt with E 2 4 Yes tanks Watchman dual lanyard and shock absorber. 3. Restrict the unauthorized entry. 4. Don’t climb on scaffolding without Green Tag. Temporary Supervisor, hearing loss, 1.Ear plug/ear muff 8. High Noise G 8 9 Use ear plug or ear muff Safety G 2 3 Yes Hearing Watchman impairment 1. Rest frequently 1. Maximum work duration inside 1.Unconsciousne 2. Come out if feel confined space will be 30 minutes ss Supervisor, Emergency dizziness followed by 10 minutes rest. 9. 2. Dizziness E 7 9 Safety E 2 4 Yes situation in CSE 3. Stop welding 2. In case of any uncertainty, leave the 3. Fatality Watchman 4. Continuous area swiftly. ventilation 3. Continuous Ventilation required. 4. Make sure that the oxygen level achieved 20.8-21% before rescue operation.
GENERAL COMMENTS: Abbreviations
1. TBT will be conducted prior to job start. SPA: Single Person Accountable 2 Proper PPE’s are mandatory for all workers. GCM: General Conversation Meeting 3. Housekeeping of the area should be carried out on prior basis. CSA: Confined Space attendant 4. Supervisor full time must be available. ELCB: Earth Leakage Circuit Breaker 5. Stand by vehicle/Ambulance must be available at site to rescue the victim. DB: Distribution Board SIGNATURE RISK ASSESSMENT APPROVAL NAME OF TEAM MEMBERS I’m satisfied that the safeguard put in place will reduce the level of Risk to an acceptable level and the Task/Action is permitted to proceed. HITRA Team Leader Reviewed by: ____ ____________________ Mechanical Engineer Date: ________________________ Time: ____________________ Authorizing S = Severity; P = Probability, R = Risk Signatory: _______________ DATE: ________________