PROJECT
PFCC GASOLINEHYDROTREATING UNIT)
EPCC-02 PACKAGE (MS BLOCK- NHT, ISOM & PFCC GASOLINE HYDROTREATING UNIT
UNIT No : 000
DOC TITLE : HIRAC- For enabling works
PROCUREMENT CODE 3 – DOCUMENT DOES NOT CONFORM TO BASIC REQUIREMENTS AS MARKED. RESUBMIT
FOR REVIEW
AS BUILT
CODE R – DOCUMENT IS RETAINED FOR RECORDS. PROCEED WITH MANUFACTURING/ FABRICATION
CODE V – VOID
Likelihood – Possibility of occurrence of risks based on present gaps (technological / operational / competence / measurement and monitoring);
UL: Unlikely, L: Likely, VL: Very Likely, FR: Frequent, C: Continuous
Impact – SI: Slight Injury, MI: Minor Injury, MJ: Major Injury, SF: Single Fatality, MF: Multiple Fatalities
Level of consequence – Refer Guidance criteria for this i.e. possible degree of damage;
Project Title: MS Block – NHT, ISOM & PFCC Gasoline Hydrotreating Unit (EPCC-02) HRRL, Pachpadra, Barmer Rajasthan.
Owner: M/s HPCL Rajasthan Refinery Ltd (HRRL).
Worksite: HPCL Rajasthan Refinery Ltd., Barmer Location: HRRL, Pachpadra, Barmer, Rajasthan
Assessm
Activity People/ Hazards LC R/ Existing control in place / use Assessm Additional
SL. Risk ent w/o
Property/ / NR/ existing ent with Measures – (If
IP
Environme existing
No. Involved C/ E control any)
nt at risk
BC
control
Involved
1-Ensure proper
workers / 1. Slips, Trips, Falls Ensure access to work area to be clear from any kind of supervision
Area
Personal obstacles.
Engineers, 2. Plant collides with vehicles or 2- Follow work
1 Preparation S NR 2 3 6 Deploy flagman with moving equipment’s. 2 2 4
Operators. Injuries procedures
personals. Vehicles should be positioned
3. Improper ground level. Area to be barricaded.
3-Trainings
Activity should be carried out under close supervision.
5 Mechanical Involved Toppling of Crane Serious S NR 2 3 6 Area Preparation shall be ensured before setting up the 2 2 4 1-Ensure proper
lifting of workers, Failure of lifting tools Injuries to crane. Lift area to be barricaded. supervision
materials, Operators. Access to the top of the Personal, The functions of the crane shall be checked by the 2- Follow work
trailer/load operator prior to start of work visually. procedures
Position of Task Hand injury Property Experienced operator with valid refinery license should
Pinch Point be engaged to operate crane
crane Supervisor Damages. 3-Trainings
Un authorized Entry A check list shall be used for inspection of crane daily by
Fall of materials the operator / Job supervisor
All lifting tools and tackles should be inspected daily
prior to issue by store in charge and record shall be
maintained. Ensure valid TPI & Colour code is available
/ done.
All the lifting tools and tackles shall be checked visually
prior to start of work by job supervisor during DTRA/TBT
and also inspect prior to each lift.
Untying and removal of metal supports of the load shall
be done by the rigger/driver.
Lifting hooks having TPI shall be used.
Slinging/removal of slings shall be done by an approved
and trained rigger.
Monthly inspection of the tools and tackles shall be done
by the competent person /HSE department and record
shall be kept.
Ladder shall be used for access supported by a person
holding or tied off to a rigged structure at both ends.
Minimum two tag line to be used by helpers (Ensure the
used tag line should be free from joint and minimum of 5
Mtr / sufficient length).
The load shall be place on sufficient sleepers to avoid
pinch points. Place sleepers at equal distances. Do not
keep more than 2 sleepers on top of another in any
case. Use sufficient sleepers with adequate width. Use
cribbing method for placing sleepers.
Operator should not lift the material prior to instruction
by deployed rigger. Always perform a check lift and
ensure the Centre of Gravity of the load is maintained.
Use job specific PPEs. Never abuse PPEs.
to be erected to prevent unauthorized entry.
Employees should not go under suspended load.
Drive the Proper Speed Limit (5 MPH) and Constantly 1-Ensure proper
1. Hitting People or obstacles on Scan for Potential Accidents. supervision
Removal of Involved
Material from workers, site with Truck Vehicle to be inspected before entering the site.
2. Unwanted loss of or shifting load Soil 2- Follow work
Site Truck driver informed and understands the requirements
6 contaminatio S NR 2 2 4 1 1 1 procedures
Supervisor, in this document.
Truck/ trailer 3. Backing vehicle striking worker n.
Driver reads and “signs off” on document. 3-Trainings
unwanted Engineers.
rolling 4. Set parking brakes and chock Have proper PPE available for drivers so they can exit
tires. the cab to remove/ tie downloads.
Be sure all items are securely tied and be away
1. Communication
Serious A route survey by site engineer /safety personnel for
Carry Out Involved personal area hazard identification.
survey activity workers, 2. Presence of hydrocarbon Visible contact with supervisor and work staff
injuries,
7 /toxic gases or vapors. S NR 2 3 6 2 2 4 Not applicable
at Site and UG Supervisors Buddy system to be maintained
scanning Operators. Property Ensure that valid calibration certificate of UG scanner.
3. High temperature
damage. Ensure two-way communication during DTRA /TBT.
Obtain valid permit to work prior start-up of the activity
Comply to gas testing requirements – if applicable
8 Road Safety in Involved Electrical environment Serious s NR 2 3 6 Authorised person accompanies required approved 2 2 4 1-Back fill it ASAP
yard workers, Moving vehicles in vicinity personal electrically resistance foot ware
2- Take work
Operators,
Contact of underground injuries, Approved handling procedures permit
Supervisors electrical
Possible contaminated fill soil Property Gloves to resistance contact 3-Informe to
Electrical moments in damage. PMC/Owner – if
Equipments
geophones needed