Name of the Project / Factory / Workshop / Job No:22020 – Qatargas- BARZAN Division/ Area: Plant, Admin, BFOC & NFXP
Name of the Project Director / Site / Workshop Manager: Mr.K.M.Shadab / Staff No.90128
SECTION A: Project HSE Lead
Avg. No of
No. of
man No. of Man days
- No. of LTI - - Hospital -
days lost
Ref.cases
worked
No. of Near Miss No. of
No. of First
Man-hours -
Aid cases
- Incidents - HSEMeeting -
worked reported conducted
SECTION B: Project HSE Officer/Engineer
D Dang Remedial Action
Hazard
at Equipment/ Doc
er Dang Proposed/ Additional Action
Action By with Target
Sl. No. a Observations Level er control measure / taken
Ref. Staff No& Name. date
ty (LXSX code Applicable Legal on
pe E) requirement to comply
Landscape equipment was stored in an Improper Advised the concerned person to 1 week Open-
open area as no shaded storage places storage of store all this gasoline operated On
1 UC BXK-1 are available for landscape equipment in equipment M 8 equipment under a shed to protect Landscape RT approv
it from getting exposed to the al
admin areas. sunlight. stage
The rest shelter roof sheets support have Damaged 3 Days
Open-
visible signs of damage and mold, and the roof/ceiling
The concerned person was On
2 wooden sheets seem swollen and puffy. supports
UC BSS-1 M 8 advised to replace the roof sheets Civil/Landscape approv
can fall off ASAP. al
and sustain
stage
injury.
It was noticed that a few essential first aid Lack of first The issue was notified to the 1 Week
3 aid kits Intend
UC BZ-Yard kits were not available inside the box at L 4 concerned person for the filling of HSE-Management
raised
BZ Yard. first aid kits.
All fire extinguisher external service is Delay in
overdue, the FE was supposed to be sent equipment’ The concerned person was
4 s service Intend
UC BZ-Yard on or before May 23, 2023, which was the M 8 informed regarding this standing HSE
raised
recommended date for external issue.
inspection.