Document number
Lifting Operation
RA no.
Activity Lifting Operations
Date
Location Project
Potential Hazards / Conditions Considered (Tick Box) Persons At Risk (Tick Box)
SAFE WORK PLACE PROPER BARRICADE AND WARNING SIGN IN THE AFFECTED AREA
Personal Protective Equipment (PPE) Requirement (Tick Box)
H (HIGH-Potential to cause death or permanent injury) M (MEDIUM – Potential to cause loss time injury) L (LOW – An injury treatable with First Aid)
1. IMPROBABLE. 1. NEGLIGIBLE.
HIGH = 15 – 25 4 4 8 12 16 20
2. REMOTE. 2. MINOR.
3 3 6 9 12 15
3. PROBABLE 3. REPORTABLE. MEDIUM = 07 – 14
2 2 4 6 8 10
4. OCCASIONAL. 4. SERIOUS. LOW = 01 - 06 1 1 2 3 4 5
5. FREQUENT 5. CATASTROPHIC. 1 2 3 4 5
SEVERITY (S)
NOTE: 1. Risk assessment must be addressed to workers by work in charge before starting job.
2. Risk assessment is a continuous process hence to be reviewed depending on activity and risk involved
Page 1 of 3
Risk Assessment Document number
Lifting Operation
ACTIVITY: ACTIVITY:
Risk Controlled By
S. N. S. N. Harm Control Measures Residual Risk
LXS L M H Whom
Serious injury,
Untrained Operator / Fatality, Competent Operator and Banksman having valid 3 rd party certificate to be Supervisor /
01. 2X5 L
Banksman Material appointed. Foreman.
Damage.
Certified Cranes, Equipments and Lifting Tackles.
Serious injury,
Pre-start inspection must be done prior to start.
Defective Lifting Equipment Fatality, Supervisor /
02. 3X5 All lifting gears, tackles and lifting hooks to be visually inspected for any kind of L
and Lifting Tackles Material Foreman.
defects prior to use.
Damage.
After use all lifting gear and tackles to be stored as per manufactures instruction.
Serious injury, Certified and Experienced banks man and Riggers.
Fatality, Suitable and safe lifting gears / tackles to be used. Supervisor /
03. Improper Use of Lifting Gear. 3X5 L
Material Do not shorten the length of slings by making knots. Foreman.
Damage. Do not attach any substandard components to lifting gears.
Serious injury, Certified and experienced Operator, banks man and Riggers to be appointed.
Incorrect Slinging and Lifting Fatality, Safe lifting procedure to be addressed to the lifting team and to be followed. Supervisor /
04. 3X5 L
Methods Material Load to be lifted by attaching the slings to designated lifting point. Foreman.
Damage. Ensure centre of gravity of the load prior to advance the lifting operation.
Ascertain the load prior to lift.
Do not exceed the Safe Working Load (SWL) of any lifting equipment / gear.
Serious injury, Load chart and 3rd party test certificates to be displayed in the operator cabin.
Over Loading of Cranes/Lifting Fatality, All cranes over one tone capacity must be fitted with an automatic safe load Supervisor /
05. 3X5 L
Equipments/gears. Material indicator with a visual warning to the operator and an audible warning to those Foreman.
Damage. in the vicinity.
Do not carry out the lifting operation in heavy wind condition.
Do not allow shock loading and horizontal pulling of load.
Serious injury, Certified and experienced signal man to be appointed.
Incorrect Signals / Fatality, Ensure wireless radio is working properly and battery pack is fully charged prior Supervisor /
06. 3X5 L
Communication System. Material to start lifting operation. Foreman.
Damage. Lifting operation must be stopped if any problem occurred in the communication.
Ensure enough space is available in the work area to handle the load safely.
Minor / Serious Centre of gravity of the load to be ensured to prevent uncontrolled movement of
injury, load.
Supervisor /
07. Fall of Persons. Fatality. 3X5 Do not stand on the top of a load while hoisting. L
Foreman.
Ensure slings are not snatched on any work platform or persons standing in the
area while hoisting.
Use Safety Harness where fall hazard exist.
Page 2 of 3
Risk Assessment Document number
Lifting Operation
ACTIVITY: ACTIVITY:
Risk Controlled By
S. N. S. N. Harm Control Measures Residual Risk
LXS L M H Whom
Certified Cranes, Equipments and Lifting Tackles.
Serious injury,
All lifting gears, tackles and lifting hooks to be visually inspected for any kind of
Fatality, Supervisor /
08. Fall of Materials. 3X5 defects prior to use. L
Material Foreman.
Secure all loose materials properly and safely prior to lift.
Damage.
Do not allow anybody to stand / pass through under suspended load.
Crane must be thoroughly inspected and certified by DM approved 3rd party after
Serious injury, erection, jack-up and major repair or after every 12 months.
Fatality, Experienced and certified operator to be appointed to operate the crane. Supervisor /
09. Collapse of Cranes. 3X5 L
Property Do not exceed the SWL. Foreman.
Damage. Do not carry out any lifting operation in adverse weather condition. (Heavy
wind).
Serious injury, Centre of gravity of the load to be ensured prior to lift.
Uncontrolled movement of Fatality, Do not carry out any lifting operation in heavy wind condition. Supervisor /
10. 3X5 L
load. Material Tag line to be used to direct the load into position and prevent it spinning. Foreman.
Damage. Slew the load smoothly.
Serious injury, Wind speed to be monitored frequently.
Supervisor /
11 Adverse Weather Fatality, Material 3X5 Do not carry out any lifting operation in adverse weather condition (Heavy wind, L
Foreman.
Damage. poor visibility etc).
If anybody asking for a lift which is not safe, never do it. Do not work under
Serious injury, pressure.
Supervisor /
12 Working under pressure. Fatality, Material 2X5 Always follow the approved / correct lifting procedure and instructions of lifting L
Foreman.
Damage. Supervisor / Foreman / person responsible for the crane / Operators &
Banksman.
Prepared By:
Approved By:
Page 3 of 3