You are on page 1of 2

SKAF CONSTRUCTION PVT.

LTD
Kalpataru Manipada Rehab Building
Kalina Santacruz (E)
Hazard Identification & Risk Assessment (HIRA)

Name of the Job Site: Kalpataru Manipada Rehab Building Kalina Santacruz (E)
Activity: Carpentry work shop Date: 10.05.2019

Action By
Probability

Residual
Severity
Sl Additional

Rating
Rating

Level
Sub

Risk

Risk
Population
N Hazard Possible at risk
Existing Control Measure Control
activity
o Outcome Measures

1 Operation Unauthorized Injury Operator - Authorized operators are allowed to Operate the plant. 1 4 L L
Operation 01 Operator Identity system is implemented.
Unguarded Entanglement Helper- All rotating parts are guarded. 1 4 L L
rotating parts 03 Emergency Stop buttons are provided.
Working area is demarcated and kept free of material at
all times.
Illumination Fall & Trip 1-3 Min. of 54 lux illumination is provided. 2 2 L L
Improper Slip, trip & fall Approach to the work area is kept clean. 2 2 L L
Approach
Poor Fire, Slip & 1-2 Regular Housekeeping is maintained. 1 4 L L
Housekeeping trip Space around wood working machine is free from
obstruction.
A cordoned area is demarcated to dump the wood
shavings, dust & Pieces.
Fire Fire 1-2 Saw dust is not accumulated near by the machine. 2 3 M Fire point & L
Regular cleaning for saw dust is maintained. training to be
Fire Extinguishers are kept. done
Adequate Water is available;Smoking is strictly prohibited
Electricity Electrocution 1-2 Cables are routed through conduits and through RCCB. 1 4 L L
Earthing for DB & metallic equipment. Frequent checking
of RCCB.
Authorized electrician are deployed for maintenance &
rectification works
Action By
Probability

Residual
Severity
Sl Additional

Rating
Rating

Level
Sub

Risk

Risk
Population
N Hazard Possible at risk
Existing Control Measure Control
activity
o Outcome Measures

Waste Air pollution 1-3 Saw dust are regularly collected & dumped in saw dust 1 3 L L
Generation dumping yard.
Dumped saw dust are put in land fill or given for
2 General
Domestic use
Excessive Noise 1-3 Regular maintenance is carried out. 1 2 L L
Noise Workmen provided with Ear Plug

CONSTRUCTION MANAGER/SECTION ENGINEER EHSO