Site Internal HSE Observation Report

Report #: 004 Site Riyadh City South-N10 Project 02


Total No of observations:
Inspection By: Godlove Shey Inspection Date: 15-09-2022 Report Issued Date: 15-09-2022 Closeout Date: Good Practice Total Closed 00

Observation

SN Severity Action By
Location Observation Observation Closeout Photo (Evidence) Action taken Status
Photos LOW Med HIGH
Unsafe lifting of kerstones with Hiab
crane. It’s strictly forbidden to lift
kerbstones with webbing slings.
01 Action Required: Eng. Samir
Designated Kerb Lifter (Block Grab Open
Area-3
Attachment) should be provided
H

Unsafe stacking of kerbstones. Only


two layers is allowed to stack
kerbstones in this project. More
than two layers is NOT allowed.
Open
Eng. Parvinder
Action Required: H
The kerstones should be re-stack in
to two layers.
Area-6
2

Page 1 of 4
Hazard Classification
HIGH Rectify before works recommence /24 Hours
MED Rectify within 3 Days
LOW Rectify within 7 Days

Page 2 of 4