JOB SAFETY ANALYSIS

PRE-TASK BRIEFING

Prepared by: Reviewed / Approved Reviewed by Approved By


Name: by: Safety Personnel
Nesma HSE KEO HSE team
Description of Lifting the Materials BY MOBILE CRANE Name/Position Name/Position
Task:
Duration of the job: 1 WEEK Sign: Sign:
Area of work: Zone – TIME: Permit Number:
MAIN STEPS OF TASK POTENTIAL HAZARDS CONTROL ACTIONS NEEDED TO REDUCE RISK
Each step is for a specific part of the task. Identify the hazards relating to each List the controls required to reduce the risk in each step.
step.

lifting the materials using mobile crane. If boom failure or seal damaged,  Allow 3rd party certified crane operator to operate the
cause Serious fatality or injuries and crane.
property damages.  Allow 3rd party certified par higher.

Wind speed.  Do not operate the crane if the wind speed is


Failed rigging. 32KPH.
Uncontrolled loads  Daily rigging inspection.
 Taglines used every time.

Improper Training and hands  Operator and rigger to be vigilant during the
signals. operation of crossover tower crane boom.
Falling material from height.  Give the best training to flagmen and riggers.

Page 1 of 2 N&P/OHS/KAAR/02/00
Page 2 of 2 N&P/OHS/KAAR/02/00