Installation of Fence

JOB SAFETY ANALYSIS


PRE-TASK BRIEFING
Project for Sharaan Nature
Reserve
Reviewed by Approved By
Reviewed / Approved by:
Prepared by: Name:
Safety Personnel
Nesma HSE KEO HSE team

Description of Task: Carpentry Work Name/Position Name/Position

Duration of the job: 12- HOUR Sign: Sign:

Area of work: ZONE 5 TIME: Permit Number:

MAIN STEPS OF TASK POTENTIAL HAZARDS CONTROL ACTIONS NEEDED TO REDUCE RISK
Each step is for a specific part of the Identify the hazards relating to each step. List the controls required to reduce the risk in each step.
task.

Carpentry Work Lack of Training and not properly Give Proper training and instructions to the employees.
Assembling framework. communicate the work.
Drilling.
Use of hammer Slip, Trip and Fall. Good standard of housekeeping to be maintained. All dusts and off cuts to be
regularly cleaned away.

Noise and vibration. Maintain power tools to reduce noise, provide appropriate ear plugs.
Select power tools with minimum level of vibration.

Fire, Smoke inhalation. All worker must know about the fire hazards and must know how to use fire
extinguisher.

Electricity and Electrical Shock. Visual check of plugs, cables on daily bases before starting the work.
Also conduct monthly inspection of all portable devices.

Use of Hand Tools, Cut, and wound. Ensure that correct tools are available and used for the job.
Hammerhead to be secure and undamaged.
Housekeeping All tools must be kept clean and clear and housekeeping must be carried out at
the start and end of the shift.
 For each hazard, indicate who is at risk: employees (E), sub-contractor employees (SC), Members of Public (P), Others (Specify) (O)
Page 1 of 2 N&P/OHS/KAAR/02/00
Installation of Fence
JOB SAFETY ANALYSIS
PRE-TASK BRIEFING
Project for Sharaan Nature
Reserve
CREW SIGN ON SHEET
NAME SIGNATURE DATE NAME SIGNATURE DATE