. Health, Safety and Environtmantal Risk Assessment.

Title Risk assessment for Testing and Commissioning of Storm Network (RC Pipes) Risk Assesssment No.00201
Company OMEGA ENGINEERING W.L.L Department MEP Date:07/11/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00201
Discription of Activity/Task: Testing and Commissioning of Storm Network (Reinforced Concrete Pipes-RC Pipes)
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

 Ensure walkthrough/ talk through, to identify any unsafe


-Unsafe Job location. conditions and layout of the cable installation area, so as
-Unsafe/ Restricted means of  to plan accordingly.
1. Preparation. Workers.
 In case of Unsafe/ Restricted work access routes, ensure
a. Site. access and egress to work  Foremen/
location. Supervisors. accesses are created/made safe as far as reasonably
-Presents of Other activities from practicable and plan accordingly.
 Engineers.
other work Groups  Ensure proper job coordination with other work groups
 Inspectors.
-Inadequate Illumination/ who might be/cause harm.
 Any person in  Ensure appropriate level of lux & ventilation are planned
Ventilation. the vicinity.
-Lack of appropriate temporary and provided.
Material storage area.  Decide suitable temporary storage area as per material
-Poor Housekeeping. size& shape to ensure free accesses.
-Presences of Unprotected  Ensure installation location are at an acceptable standard
of housekeeping.
edges/open holes, Protruding
 Ensure all falling Hazards, protruding sharp objects are
Rebar/ sharp objects, Uneven/
protected and floor surfaces treated, to eliminate tripping,
Smooth or Contaminated floor. slipping hazards.
- Pollution.  Ensure all health unfriendly environmental factor are under
4 3 12 control including dusts. 1 3 3
b.  Ensure provision of suitable, reliable and inspected
Tools/Equipment/I - Use of Unsuitable and  Operators/ tools/equipment/instruments, including 3rd party, periodic
nstruments. Uninspected Tools/ Equipment Helpers. &pre-use inspections (3rd party& calibration certificates) as
and instruments.  All other per main contractors’ procedure.
- Noise and vibration. people in  Potentials for high noise/vibration during equipment use
the vicinity. shall be identified and provided for.
 Ensure workers competence and identify any training need
and act accordingly.
 Develop & implement behavioral changing programs such
c. Personnel as awareness campaigns, award/incentive scheme and
disciplinary actions.
-Incompetent workers.
 Ensure all workers are provided necessary trainings
-Poorly cultured workforce. (induction and Job specific trainings such as working at
-Lack of specific required training/  Any person height, confine space entry, use of power tools, etc.) and
induction Training for workers. in the ensure availability of all required certifications.
-Unavailability of PPEs. vicinity.  Provide & ensure use of required PPEs and watch out for
-Presences of unsafe personality negative behaviour during personnel selection.
traits.  Ensure affected areas are inspected by competent person
to ensure safe conditions prior to commencing.

 Follow QD-SBG procedure for material, equipment and


. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for Testing and Commissioning of Storm Network (RC Pipes) Risk Assesssment No.00201
Company OMEGA ENGINEERING W.L.L Department MEP Date:07/11/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00201
Discription of Activity/Task: Testing and Commissioning of Storm Network (Reinforced Concrete Pipes-RC Pipes)
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

personnel mobilization to the site.


 Traffic management shall be under control such as use
of flagmen and obeying site traffic rules such as speed
limit, no using of ear phone while driving and use of
seat belts.
 Ensure only calibrated/inspected instruments/tools are
mobilized and certificates kept within reach.
 Ensure required welfare facilities such as drinking
water thermos and lunch container are provided to the
workers before proceeding for induction training.
 Ensure only inducted workers are allowed to the site.
 Ensure Tools/equipment are mobilized into the site not
 Manual handling. causing access obstructions.
 Lack of/ inappropriate  Workers  Ensure that the weight of instruments & equipment are
proximity of welfare  Pedestrian appropriately for worker to handle, otherwise apply
facilities such as s team lifting and shifting.
drinking water.  Supervisor  Ensure the manufacturers instruction on instrument
Mobilization/  Provision of s/foremen. and equipment handling and usage, are understood
2. Demobilization uncalibrated/incorrectly  Inspectors. and followed.
of materials, calibrated instruments  Client 4 5 20
 Ensure tools are provided with tool boxes.
1 3 3
workers and leading to use of representa  Ensure the availability of emergency respond
Equipment’s incorrect instrument. tives. equipment are mobilizes in the work area including the
 Mobilization of workers availability of a first aider.
without inducted.
 Ensure each worker has been provided required PPEs
 Obstructing the access including water thermos bottle.
with mobilized
 Ensure that heavy material manual lifting and transfer
instruments,
are carried out under appropriate level of supervision
equipment, and/or
by a competent supervisor.
materials.
 Ensure all mobilized materials are stacked properly in a
 Slip, Trip and fall at
safe manner not more than 1.5m height but otherwise,
same level.
ensure the materials are suitably secured.
 Provide correct manual handling techniques training.
 Ensure floors are not contaminated, are free from
objects that can cause tripping(housekeeping to be
carried out pro to starting)
 Significance and consequence of extreme
temperature/ weather shall be a topic in every toolbox
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for Testing and Commissioning of Storm Network (RC Pipes) Risk Assesssment No.00201
Company OMEGA ENGINEERING W.L.L Department MEP Date:07/11/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00201
Discription of Activity/Task: Testing and Commissioning of Storm Network (Reinforced Concrete Pipes-RC Pipes)
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

 Exposure to high talk & pre-start briefing.


temperature  Monitor and follow the humidity index.
 Direct sun light which  Advise employees to take more fluid.
 Take rest at regular intervals as recommended by the
could lead to
humidex chat.
 Dehydration All workers  Provide enough ventilation or air conditioned and
 Heat stress, The Foremen/ appropriate cool resting places.
Work during Supervisors/ others
Extreme  Heat stroke,  Avoid working in direct sun during extreme hot climates
 Physical exertion, staffs and people in  Ensure that the significance of the temperature-
Weather open places.
 Fatigue and humidity monitoring flags is implemented.
Conditions
 Wear appropriate clothing.
a. Working  loss of control  Use proper PPEs to protect oneself from radiant heat
under direct (light colored coveralls, helmets etc.)
sunlight/  Provide cold drinking water at the place of work with
3 5 15 2 3 6
3. Working in  Over exposure to the workers provided personal thermos water bottle
high unhealthy cold weather  Proper supervisory control.
temperature, leading to, nonfreezing  Confined space entry shall be avoided unless confined
climate. (chilblain, emersion foot
space temperature and other hazardous parameters
are under maximum control.
and trench foot) freezing  Ensure workers are provided with electrolyte.
All workers
(frostnip, frostbite) and  Disallow working between 11.30am -3.00pm as per
b. Working Foremen/supervisors.
hypothermia injuries. All employee. Qatar regulation.
during  Inability to hold objects  Ensure proper awareness to the workers on proper
extreme cold. firmly which could lead to dressing (insulating dresses) to be protected during
3 4 12 2 2 4
losing hold of held cold weather.
materials, sometimes at  Ensure appropriate rest breaks in a warm rest area.
height from height.  Provide heating facilities for food and hot drink
purposes.
 Ensure regular weather monitoring to identify quickly
when it is not safe to work and take the necessary
action of stopping the work.
 Provide heat loss resistant container for workers foods.
 Provide appropriate level of supervision.
 Make available in the site emergency arrangement.
 Obtain PTW prior to start activity & TBT training to
operatives
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for Testing and Commissioning of Storm Network (RC Pipes) Risk Assesssment No.00201
Company OMEGA ENGINEERING W.L.L Department MEP Date:07/11/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00201
Discription of Activity/Task: Testing and Commissioning of Storm Network (Reinforced Concrete Pipes-RC Pipes)
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

 Ensure all operatives received safety induction.

 Provide use of power tools training to operatives by a


competent trainer.
 Ensure electrical power tools are inspected and color
 Defective portals coded by OMEGA competent electrician.
 Wrong Tool  Visual Inspection must be carried out before using the
 Electrocution tools.
 Poor electrical extension  Defective head tools and homemade tools shall not be
All workers used in the site.
cord management.
The Foremen/  Use Suitable tool for work.
 Incompetent operatives Supervisors/ others  Ensure ELCB are provided to electrical power supply
 Poor illumination in work staffs and people in sources.
area. the vicinity.  Ensure electrical cables are protected from water / spilled
liquid and generally ensure proper cable management.
 Noise/ Vibration.
4. Working with 4 4 16  Proper earthlings shall be provided for the electrical 2 2 4
 Flying particles equipment.
hand  Uninspected equipment.  Only industrial sockets shall be used.
Tool/Instrume  Use of power tools without  Only authorized electricians shall be allowed to carry out
training. power tool inspections/repairs.
nts.
 Use of sharp cutting hand  Disconnect power supply while carrying out repairs and
tools while the machine is idle.
 Do not lift or lower the power tool using the power cable.
 Ensure damaged and defective tools are tagged off not to
use.
 In the event of noisy/and vibrating portable power tools,
ear protective equipment shall be provided and job rotation
shall be implemented.
 Ensure use of appropriate PPEs such as suitable hand
gloves, while using sharp cutters.
 If the cutter is power tool, ensure users at trained/
competent.
 Use shall be under proper supervision
 Proper illumination to be provided as per QCS
requirements.
 Proper cable management to be maintained.
 Ensure suitable hand gloves are provided and allow only
competent users to operate sharp cutting hand tools
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for Testing and Commissioning of Storm Network (RC Pipes) Risk Assesssment No.00201
Company OMEGA ENGINEERING W.L.L Department MEP Date:07/11/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00201
Discription of Activity/Task: Testing and Commissioning of Storm Network (Reinforced Concrete Pipes-RC Pipes)
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

 Ensure TBT or pre-starrt task briefing and that the crew


properly signed on the starrt card are completed before
start.
 Ensure materials are stacked in a safe manner (max:
1.5 meters high), without obstructing accesses or
 Poor illumination emergency exit routes.
 Slippery surface & uneven -All night shift workers  Ensure appropriate PPEs are provided including clear
surface. including equipment glasses
 Lone working operative. operators.  Provide sufficient lights on the working areas.
 Inadequate supervision. -Night shift Foremen  Ensure provision of Barricades and high visible
 Moving equipment. & Supervisors.
signage where applicable especially around
 Fatigue - Night shift
inspectors. excavations and open floors. 1 3 3
Working at -Night visitors. 3 5 15  Use warning Lights to warn against hazards.
5. Night  Provide additional directional signage especially along
traffic routes.
 Work should be carried out under proper supervision.
 Proper planned method of work.
 Ensure pre-start briefing is provided to workers by their
superiors before work starting,
 Obtain PTW for the particular activity.
 Ensure there are no lone working by any of the
workers, put workers in work groups.
 Provide enough drinking water in the work area.
 Ensure proper segregation of traffic routes from
pedestrian routes.
 Ensure effective fatigue management by considering
appropriate work hours and allowing adequate rest.
 No worker shall be allowed to work at night and in the
morning. If such need arises, the worker shall be
allowed a bed rests of not less than 7 hours before he
can join the second shift required.

 Soft & uneven floor.


 Ensure provision of Toolbox talk at the start of the activity
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for Testing and Commissioning of Storm Network (RC Pipes) Risk Assesssment No.00201
Company OMEGA ENGINEERING W.L.L Department MEP Date:07/11/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00201
Discription of Activity/Task: Testing and Commissioning of Storm Network (Reinforced Concrete Pipes-RC Pipes)
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

 Use of damaged followed by daily pre-start briefings and ensure all the
operatives have signed the start card.
uninspected ladders.
 Ensure ladders are inspected and color coded before use
 Unsecured ladders. including visual Inspection before use to identify significant
 Use of one ladder by damages to the ladder.
workers at a time.
 Ladder are considered for only access to work location. If it is
 Overreaching from ladders. necessary to use it for work, it must be for temporary work
 Wrong positioning of ladder  All workers, purpose and must be ensured to be Suitable for the work.
(not complying with 1:4). working at  Ensure workers are trained to work at height and provided
proper Supervision.
 Absence of 1 meter step out height.
 Wear appropriate PPE such as fall arrest system hand gloves,
extension from platform.  Foremen/ safety Goggles & safety helmet.
 Lack of three-point contact Supervisors  Three-point contact must be maintained at all times and avoid
Usage of . overreaching when using ladders
Access during use
 Inspectors  Access ladders positioning shall comply with ratio 1:4, secured
equipment  Incomplete scaffold. up & down and extend at least 1m from the platform. If not
6. (ladder and  Loss platforms. 4 5 20
secured, it must be adequately held by another worker, and
2 3 6
shall not be for work of any sort at height above 3m.
scaffold),  Overloaded scaffold.  For type A ladders, it shall be fully extended and supported
 Scaffolds with poor with the supports provided by the manufactures and its use
structural integrity. shall be as per manufacturer instructions and the 3 top rungs
must not be used to avoid overreaching.
 Scaffold with missing guard  Ensure ladders are placed on a level surface, slip free.
rails  Ensure ladder position are not blocking the emergency escape
 Poor housekeeping on the routes and ensure it is not blocked by material.
 Scaffolds shall be erected and tagged by a competent and
platform of the scaffold and
certified scaffolders and scaffold Inspectors respectively.
around the base of its  Ensure top, mid rails & toe boards are present before use .
access ladder.  Workers shall only use scaffolds with a green tag including
 Electrical cables in contact user visual inspection.
with scaffold pipes.  Ensure all workers using scaffolds must be in a fall arrest
system which shall be 100% tie off at all time.
 Ensure that worker is properly instructed, informed, trained and
monitored for compliance, to always bypass the energy
absorber at any height below 6 meters.
 Ensure that the scaffold is not overloaded & ensure proper
housekeeping.
 Scaffolds shall not block access and materials shall not block
means of accessing scaffold through its ladder.
 Ensure electrical extension cables are not in contact with
scaffold pipes.
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for Testing and Commissioning of Storm Network (RC Pipes) Risk Assesssment No.00201
Company OMEGA ENGINEERING W.L.L Department MEP Date:07/11/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00201
Discription of Activity/Task: Testing and Commissioning of Storm Network (Reinforced Concrete Pipes-RC Pipes)
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

 All
workers
who may
 Repetitive activities. work in  TBT (Tool Box Talk) QD-SBG (Daily Safety Task)
 Excessive weight the  Use of Manual handling aids.
leading to back affected  Ensure correct assessment of weight prior to manual
Injury, Upper and area. lifting to ensure workers are not subjected to
Manual Lower Body Injury,  Superviso overweight.
Handling Sprains and Strains. rs,  Implement team lifting in case of heavy weights.
Activities  Sharp edges. foremen,  Ensure Walkways and work areas are clear from
7. 2 2 4
 Use of improper Engineers obstacles to avoid tripping on the way, while manually
4 4 16
manual lifting . transferring materials and pipes from one location to
Support fixing.
techniques.  All people another.
in the  Provide Manual lifting Technics training reinforced by
affected regular information and instructions.
area  Adequate level of supervision.
including
 Give adequate rest breaks and employ job rotation to
visitors.
minimize fatigue.
 Ensure provision & use of required PPEs especially
hand gloves.
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for Testing and Commissioning of Storm Network (RC Pipes) Risk Assesssment No.00201
Company OMEGA ENGINEERING W.L.L Department MEP Date:07/11/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00201
Discription of Activity/Task: Testing and Commissioning of Storm Network (Reinforced Concrete Pipes-RC Pipes)
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

 Unsecured energy
sources.  All
 Obstruction of workers  Shorting down by competent/authorized person.
who may  Ensure all control devices are adequately
emergency control,
work in managed/controlled as per plans.
Work firefighting equipment.  Ensure supplies to unwanted area are prevented by
completion,  Physical hazards the
isolation.
Housekeeping  Fire hazards due to affected  All sources of energy must be secure and locked with
& energy human error. area. LOTO lock by authorised person only and tagged.
security  Environmental hazards.  Superviso  Good standard of housekeeping to be maintained at
Spillage, Contaminated rs, 4 4 16 the end and clean up spillages with content of spill kit 2 2 4
8. waste (hazardous), foremen, and dispose waste appropriately.
Flammable/explosive Engineers  Accesses/egresses to be properly managed, those
. meant to be open must be kept open and those
atmosphere. planned to be closed must be closed.
 All people
in the  All emergency control must not be obstructed with
affected materials,
 All potentially flying, falling material to be organized &
area
secured properly.
including  Observe, maintain safe and proper storage of
visitors. materials/equipment used, maintenance of PPEs after
use..
 Post emergency contact at relevant locations.
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for Testing and Commissioning of Storm Network (RC Pipes) Risk Assesssment No.00201
Company OMEGA ENGINEERING W.L.L Department MEP Date:07/11/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00201
Discription of Activity/Task: Testing and Commissioning of Storm Network (Reinforced Concrete Pipes-RC Pipes)
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

Additional comment/Information:

Risk Assessment Team

Name Designation Department Signature

Mr. Ahmed Dabbous Project Director Management

Mr. Jai Prasad B. Nair HSES Manager(QD-SBG) HSES

Mr. Daniel Nbuduisi Chilaka-anya. HSE Manager(OMG) HSE