Title Risk assessment for Testing and Commissioning of Storm Network (RC Pipes) Risk Assesssment No.00201
Company OMEGA ENGINEERING W.L.L Department MEP Date:07/11/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00201
Discription of Activity/Task: Testing and Commissioning of Storm Network (Reinforced Concrete Pipes-RC Pipes)
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R
Use of damaged followed by daily pre-start briefings and ensure all the
operatives have signed the start card.
uninspected ladders.
Ensure ladders are inspected and color coded before use
Unsecured ladders. including visual Inspection before use to identify significant
Use of one ladder by damages to the ladder.
workers at a time.
Ladder are considered for only access to work location. If it is
Overreaching from ladders. necessary to use it for work, it must be for temporary work
Wrong positioning of ladder All workers, purpose and must be ensured to be Suitable for the work.
(not complying with 1:4). working at Ensure workers are trained to work at height and provided
proper Supervision.
Absence of 1 meter step out height.
Wear appropriate PPE such as fall arrest system hand gloves,
extension from platform. Foremen/ safety Goggles & safety helmet.
Lack of three-point contact Supervisors Three-point contact must be maintained at all times and avoid
Usage of . overreaching when using ladders
Access during use
Inspectors Access ladders positioning shall comply with ratio 1:4, secured
equipment Incomplete scaffold. up & down and extend at least 1m from the platform. If not
6. (ladder and Loss platforms. 4 5 20
secured, it must be adequately held by another worker, and
2 3 6
shall not be for work of any sort at height above 3m.
scaffold), Overloaded scaffold. For type A ladders, it shall be fully extended and supported
Scaffolds with poor with the supports provided by the manufactures and its use
structural integrity. shall be as per manufacturer instructions and the 3 top rungs
must not be used to avoid overreaching.
Scaffold with missing guard Ensure ladders are placed on a level surface, slip free.
rails Ensure ladder position are not blocking the emergency escape
Poor housekeeping on the routes and ensure it is not blocked by material.
Scaffolds shall be erected and tagged by a competent and
platform of the scaffold and
certified scaffolders and scaffold Inspectors respectively.
around the base of its Ensure top, mid rails & toe boards are present before use .
access ladder. Workers shall only use scaffolds with a green tag including
Electrical cables in contact user visual inspection.
with scaffold pipes. Ensure all workers using scaffolds must be in a fall arrest
system which shall be 100% tie off at all time.
Ensure that worker is properly instructed, informed, trained and
monitored for compliance, to always bypass the energy
absorber at any height below 6 meters.
Ensure that the scaffold is not overloaded & ensure proper
housekeeping.
Scaffolds shall not block access and materials shall not block
means of accessing scaffold through its ladder.
Ensure electrical extension cables are not in contact with
scaffold pipes.
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for Testing and Commissioning of Storm Network (RC Pipes) Risk Assesssment No.00201
Company OMEGA ENGINEERING W.L.L Department MEP Date:07/11/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00201
Discription of Activity/Task: Testing and Commissioning of Storm Network (Reinforced Concrete Pipes-RC Pipes)
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R
All
workers
who may
Repetitive activities. work in TBT (Tool Box Talk) QD-SBG (Daily Safety Task)
Excessive weight the Use of Manual handling aids.
leading to back affected Ensure correct assessment of weight prior to manual
Injury, Upper and area. lifting to ensure workers are not subjected to
Manual Lower Body Injury, Superviso overweight.
Handling Sprains and Strains. rs, Implement team lifting in case of heavy weights.
Activities Sharp edges. foremen, Ensure Walkways and work areas are clear from
7. 2 2 4
Use of improper Engineers obstacles to avoid tripping on the way, while manually
4 4 16
manual lifting . transferring materials and pipes from one location to
Support fixing.
techniques. All people another.
in the Provide Manual lifting Technics training reinforced by
affected regular information and instructions.
area Adequate level of supervision.
including
Give adequate rest breaks and employ job rotation to
visitors.
minimize fatigue.
Ensure provision & use of required PPEs especially
hand gloves.
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for Testing and Commissioning of Storm Network (RC Pipes) Risk Assesssment No.00201
Company OMEGA ENGINEERING W.L.L Department MEP Date:07/11/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00201
Discription of Activity/Task: Testing and Commissioning of Storm Network (Reinforced Concrete Pipes-RC Pipes)
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R
Unsecured energy
sources. All
Obstruction of workers Shorting down by competent/authorized person.
who may Ensure all control devices are adequately
emergency control,
work in managed/controlled as per plans.
Work firefighting equipment. Ensure supplies to unwanted area are prevented by
completion, Physical hazards the
isolation.
Housekeeping Fire hazards due to affected All sources of energy must be secure and locked with
& energy human error. area. LOTO lock by authorised person only and tagged.
security Environmental hazards. Superviso Good standard of housekeeping to be maintained at
Spillage, Contaminated rs, 4 4 16 the end and clean up spillages with content of spill kit 2 2 4
8. waste (hazardous), foremen, and dispose waste appropriately.
Flammable/explosive Engineers Accesses/egresses to be properly managed, those
. meant to be open must be kept open and those
atmosphere. planned to be closed must be closed.
All people
in the All emergency control must not be obstructed with
affected materials,
All potentially flying, falling material to be organized &
area
secured properly.
including Observe, maintain safe and proper storage of
visitors. materials/equipment used, maintenance of PPEs after
use..
Post emergency contact at relevant locations.
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for Testing and Commissioning of Storm Network (RC Pipes) Risk Assesssment No.00201
Company OMEGA ENGINEERING W.L.L Department MEP Date:07/11/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00201
Discription of Activity/Task: Testing and Commissioning of Storm Network (Reinforced Concrete Pipes-RC Pipes)
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R
Additional comment/Information: