. Health, Safety and Environtmantal Risk Assessment.

Title Risk assessment for T&C Fire rated Bus Duct. Risk Assesssment No.00462
Company OMEGA ENGINEERING W.L.L Department MEP Date:30/12/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00462
Discription of Activity/Task: Testing and Commissioning of Fire rated Bus Duct.
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

 Ensure walkthrough/ talk through, to identify any unsafe


-Unsafe Job location. conditions and layout of the cable installation area, so as
-Unsafe/ Restricted means of  to plan accordingly.
1. Preparation. Workers.
 In case of Unsafe/ Restricted work access routes, ensure
a. Site. access and egress to work  Foremen/
location. Supervisors. accesses are created/made safe as far as reasonably
-Presents of Other activities practicable and plan accordingly.
 Engineers.
from other work Groups  Ensure proper job coordination with other work groups who
 Inspectors.
-Inadequate Illumination/ might be/cause harm.
 Any person in the  Ensure appropriate level of lux & ventilation are planned
Ventilation. vicinity.
-Lack of appropriate temporary and provided.
Material storage area.  Decide suitable temporary storage area as per material
-Poor Housekeeping. size& shape to ensure free accesses.
 Ensure installation location are at an acceptable standard
-Presences of Unprotected
of housekeeping.
edges/open holes, Protruding
 Ensure all falling Hazards, protruding Rebars / sharp
Rebar/ sharp objects, Uneven/
objects are protected and floor surfaces treated, to
Smooth or Contaminated floor. eliminate tripping, slipping hazards.
- Pollution.  Ensure all health unfriendly environmental factor are under
4 3 12 control including dusts. 1 3 3
b.  Ensure provision of suitable, reliable and inspected
Tools/Equipment/I - Use of Unsuitable and  Operators/ tools/equipment/instruments, including 3rd party, periodic
nstruments. Uninspected Tools/ Equipment Helpers. &pre-use inspections (3rd party& calibration certificates) as
and instruments.  All other per main contractors’ procedure.
- Noise and vibration. people in the  Potentials for high noise/vibration during equipment use
vicinity. shall be identified and provided for.
 Ensure workers competence and identify any training need
and act accordingly.
 Develop & implement behavioral changing programs such
c. Personnel as awareness campaigns, award/incentive scheme and
disciplinary actions.
-Incompetent workers.
 Ensure all workers are provided necessary trainings
-Poorly cultured workforce. (induction and Job specific trainings such as working at
-Lack of specific required height, confine space entry, use of power tools, etc.) and
training/ induction Training for ensure availability of all required certifications.
new workers.  Any person  Provide & ensure use of required PPEs and watch out for
-Unavailability of PPEs. in the negative behaviour during personnel selection.
-Presences of unsafe vicinity.  Ensure affected areas are inspected by competent person
personality traits. to ensure safe conditions prior to commencing.
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for T&C Fire rated Bus Duct. Risk Assesssment No.00462
Company OMEGA ENGINEERING W.L.L Department MEP Date:30/12/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00462
Discription of Activity/Task: Testing and Commissioning of Fire rated Bus Duct.
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

 Follow QD-SBG procedure for material,


equipment/instrument and personnel mobilization to
the site.
 Traffic management shall be under control such as use
of flagmen and obeying site traffic rules such as speed
limit, no using of ear phone while driving and use of
seat belts.
 Ensure only calibrated/inspected instruments/tools are
 Manual handling. mobilized and certificates kept within reach.
 Lack of/ inappropriate  Ensure required welfare facilities such as drinking
proximity of welfare water thermos and lunch container are provided to the
facilities such as workers before proceeding for induction training.
drinking water.  Ensure only inducted workers are allowed to the site.
 Provision of  Ensure Tools/equipment are mobilized into the site not
uncalibrated/ causing access obstructions.
incorrectly calibrated  Ensure that the weight of instruments & equipment are
instruments leading to appropriately for worker to handle, otherwise apply
Mobilization/ use of incorrect  Workers
team lifting and shifting.
2. Demobilization instrument.  Pedestrians
 Ensure the manufacturers instruction on instrument
of materials,  Mobilization of  Supervisors 4 5 20
and equipment handling and usage, are understood
1 3 3
workers and workers without /foremen. and followed.
Equipment’s inducted.  Inspectors.  Ensure tools are provided with tool boxes.
 Obstructing the  Client  Ensure the availability of emergency respond
access with mobilized representati equipment are mobilizes in the work area including the
instruments, ves. availability of a first aider.
equipment, and/or
 Ensure each worker has been provided required PPEs
materials.
including water thermos bottle.
 Slip, Trip and fall at
 Ensure that heavy material manual lifting and transfer
same level.
are carried out under appropriate level of supervision
by a competent supervisor.
 Ensure all mobilized materials are stacked properly in a
safe manner not more than 1.5m height but otherwise,
ensure the materials are suitably secured.
 Provide correct manual handling techniques training.
 Ensure floors are not contaminated, are free from
objects that can cause tripping(housekeeping to be
carried out pro to starting)
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for T&C Fire rated Bus Duct. Risk Assesssment No.00462
Company OMEGA ENGINEERING W.L.L Department MEP Date:30/12/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00462
Discription of Activity/Task: Testing and Commissioning of Fire rated Bus Duct.
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

 start briefing.
 Monitor and follow the humidity index.
 Advise employees to take more fluid.
 Take rest at regular intervals as recommended by the
humidex chat.
Work during  Exposure to high  Provide enough ventilation or air conditioned and
Extreme temperature appropriate cool resting places.
Weather  Direct sun light which  Avoid working in direct sun during extreme hot climates
Conditions.  Ensure that the significance of the temperature-
could lead to All workers
humidity monitoring flags is implemented.
 Dehydration The Foremen/
 Wear appropriate clothing.
a. Working  Heat stress, Supervisors/ others
staffs and people in 3 5 15  Use proper PPEs to protect oneself from radiant heat 2 3 6
under direct  Heat stroke, (light colored coveralls, helmets etc.)
sunlight/ open places.
 Physical exertion,  Provide cold drinking water at the place of work with
Working in the workers provided personal thermos water bottle
 Fatigue and
3. high  Proper supervisory control.
temperature,  loss of control  Confined space entry shall be avoided unless confined
climate. space temperature and other hazardous parameters
are under maximum control.
 Over exposure to  Ensure workers are provided with electrolyte.
unhealthy cold weather  Disallow working between 11.30am -3.00pm as per
Qatar regulation.
leading to, nonfreezing 3 4 12 2 2 4
 Ensure proper awareness to the workers on proper
(chilblain, emersion foot dressing (insulating dresses) to be protected during
All workers
b. Working and trench foot) Foremen/supervisors. cold weather.
during freezing (frostnip, All employee.  Ensure appropriate rest breaks in a warm rest area.
extreme cold. frostbite) and  Provide heating facilities for food and hot drink
hypothermia injuries. purposes.
 Inability to hold objects  Ensure regular weather monitoring to identify quickly
firmly which could lead when it is not safe to work and take the necessary
to losing hold of held action of stopping the work.
materials, sometimes at  Provide heat loss resistant container for workers food.
height from height.  Provide appropriate level of supervision.
 Make available in the site emergency arrangement.
 Significance and consequence of extreme
temperature/ weather shall be a topic in every toolbox
talk & pre-
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for T&C Fire rated Bus Duct. Risk Assesssment No.00462
Company OMEGA ENGINEERING W.L.L Department MEP Date:30/12/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00462
Discription of Activity/Task: Testing and Commissioning of Fire rated Bus Duct.
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

 Obtain PTW prior to start activity & TBT training to


operatives
 Ensure all operatives received safety induction.

 Provide use of power tools training to operatives by a


competent trainer.
 Ensure electrical power tools are inspected and color
coded by OMEGA competent electrician.
 Visual Inspection must be carried out before using the
tools.
 Defective head tools and homemade tools shall not be
 Defective portals used in the site.
 Wrong Tool  Use Suitable tool for work.
4. 4 4 16  Ensure ELCB are provided to electrical power supply 2 2 4
 Electrocution sources.
Working with All workers
 Poor electrical extension The Foremen/  Ensure electrical cables are protected from water / spilled
Power Tools & cord management. liquid and generally ensure proper cable management.
Supervisors/ others
hand Tool  Incompetent operatives staffs and people in the  Proper earthlings shall be provided for the electrical
vicinity. equipment.
 Poor illumination in work
 Only industrial sockets shall be used.
area.  Only authorized electricians shall be allowed to carry out
 Noise/ Vibration. electrical inspections/repairs.
 Flying particles  Disconnect power supply while carrying out repairs and
 Uninspected equipment. while the machine is idle.
 Use of power tools without  Do not lift or lower the power tool using the power cable.
training.  Ensure damaged and defective tools are tagged off not to
use.
 Use of sharp cutting hand
 In the event of noisy/and vibrating portable power tools,
tools
ear protective equipment shall be provided and job rotation
shall be implemented.
 Ensure use of appropriate PPEs such as suitable hand
gloves, while working.
 If the cutter is power tool, ensure users are trained/
competent.
 Use shall be under proper supervision
 Proper illumination to be provided as per QCS
requirements.
 Proper cable management to be maintained.
 Ensure suitable hand gloves are provided and allow only
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for T&C Fire rated Bus Duct. Risk Assesssment No.00462
Company OMEGA ENGINEERING W.L.L Department MEP Date:30/12/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00462
Discription of Activity/Task: Testing and Commissioning of Fire rated Bus Duct.
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

competent users to operate sharp cutting hand tools

 Ensure TBT or pre-starrt task briefing and that the crew


properly signed on the starrt card are completed before
start.
 Ensure materials are stacked in a safe manner (max:
1.5 meters high), without obstructing accesses or
emergency exit routes.
 Ensure appropriate PPEs are provided including clear
-All night shift workers glasses
including equipment  Provide sufficient lights on the working areas. 1 3 3
operators. 3 5 15
 Poor illumination  Ensure provision of Barricades and high visible
5. -Night shift Foremen &
Working at  Slippery surface & uneven signage where applicable especially around
Supervisors.
Night surface. excavations and open floors.
- Night shift inspectors.
 Lone working operative.  Use warning Lights to warn against hazards.
-Night visitors.
 Inadequate supervision.  Provide additional directional signage especially along
 Moving equipment. traffic routes.
 Fatigue  Work should be carried out under proper supervision.
 Proper planned method of work.
 Ensure pre-start briefing is provided to workers by their
superiors before work starting,
 Obtain PTW for the particular activity.
 Ensure there are no lone working by any of the
workers, put workers in work groups.
 Provide enough drinking water in the work area.
 Ensure proper segregation of traffic routes from
pedestrian routes.
 Ensure effective fatigue management by considering
appropriate work hours and allowing adequate rest.
 No worker shall be allowed to work at night and in the
morning. If such need arises, the worker shall be
allowed a bed rests of not less than 7 hours before he
can join the second shift required.
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for T&C Fire rated Bus Duct. Risk Assesssment No.00462
Company OMEGA ENGINEERING W.L.L Department MEP Date:30/12/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00462
Discription of Activity/Task: Testing and Commissioning of Fire rated Bus Duct.
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

 Soft & uneven floor.


 Ensure provision of Toolbox talk at the start of the activity
 Use of damaged followed by daily pre-start briefings and ensure all the
uninspected ladders. operatives have signed the start card.
 Unsecured ladders.  Ensure ladders are inspected and color coded before use
including visual Inspection before use to identify significant
 Use of one ladder by damages to the ladder.
workers at a time.
 Overreaching from ladders.  Ladder are considered for only access to work location. If it is
 Wrong positioning of necessary to use it for work, it must be for temporary work
purpose and must be ensured to be Suitable for the work.
ladder (not complying with  Ensure workers are trained to work at height and provided
1:4).  All workers, proper Supervision.
 Absence of 1 meter step working at  Wear appropriate PPE such as fall arrest system hand gloves,
6. height. 4 5 20 safety Goggles & safety helmet. 2 3 6
out extension from
Usage of  Foremen/  Three-point contact must be maintained at all times and avoid
platform. Supervisors. overreaching when using ladders
Access  Lack of three-point contact  Access ladders positioning shall comply with ratio 1:4, secured
 Inspectors
equipment during use up & down and extend at least 1m from the platform. If not
(ladder and secured, it must be adequately held by another worker, and
 Incomplete scaffold. shall not be for work of any sort at height above 3m.
scaffold), 
 Loss platforms. For type A ladders, it shall be fully extended and supported
with the supports provided by the manufactures and its use
 Overloaded scaffold. shall be as per manufacturer instructions and the 3 top rungs
 Scaffolds with poor must not be used to avoid overreaching.
structural integrity.  Ensure ladders are placed on a level surface, slip free.
 Ensure ladder position are not blocking the emergency escape
 Scaffold with missing routes and ensure it is not blocked by material.
guard rails  Scaffolds shall be erected and tagged by a competent and
 Poor housekeeping on the certified scaffolders and scaffold Inspectors respectively.
platform of the scaffold and  Ensure top, mid rails & toe boards are present before use .
 Workers shall only use scaffolds with a green tag including
around the base of its
user visual inspection.
access ladder.  Ensure all workers using scaffolds must be in a fall arrest
 Electrical cables in contact system which shall be 100% tie off at all time.
with scaffold pipes.  Ensure that worker is properly instructed, informed, trained and
monitored for compliance, to always bypass the energy
absorber at any height below 6 meters.
 Ensure that the scaffold is not overloaded & ensure proper
housekeeping.
 Scaffolds shall not block access and materials shall not block
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for T&C Fire rated Bus Duct. Risk Assesssment No.00462
Company OMEGA ENGINEERING W.L.L Department MEP Date:30/12/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00462
Discription of Activity/Task: Testing and Commissioning of Fire rated Bus Duct.
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

means of accessing scaffold through its ladder.


 Ensure electrical extension cables are not in contact with
scaffold pipes.
 Incorrect /lack of  Ensure TBT (Tool Box Talk) QD-SBG (Daily Safety
Task deals in details safe system of work, hazards and
identification of circuit to
control measures.
work on.  Ensure each critical item is identified by means of
 Incorrect / lack of proper labels to avoid/reduce mistake.
isolation of the system  Ensure supply is completely cut off, isolated and
Testing 1 to work on. isolation secured with locks/tags.
Cold Test  Absent of perimeter  Possess the keys, install access barriers with caution
barrier, caution and and danger notices where necessary to avoid
-Continuity test. danger notice.
5 5 25 unauthorized interferences. 2 3 6
7.  The equipment/circuit should be proved dead prior to
 Not confirming that the
commencing the activity for an opportunity to correct
circuit is dead prior to any mistake.
working. All workers
 ELCB to be confirmed active and effective first.
 Unauthorized Supervisors/
Foremen.  Associated isolation to be secured with locks and tags
personnel/ interference Inspectors. and person in charge to retain the keys.
with isolation. And passerby  Ensure selection of competent electricians for the task
and provide them with clear instruction and information.
 Incompetent operatives.  Provide appropriate level of supervision.
 Improper supervision,  Ensure accesses are clear from trip and fall hazards
 Lack of ’s and ensure sufficient and effective lighting in the area.
 Improper access/  Ensure adjacent life conductors are made exclusion
egress. zone with 1m minimum clearance and provide warning
 Interface with other signage.
 Ensure necessary PTW (including Electrical PTW) are
potentially hazardous
available and its requirements followed.
system,  Ensure personnel’s, tool and material are removed
 Uncontrolled energy. from the rest area before the test starts
 Lighting and  Ensure the correct equipment is used and the
operatives are competent to use it.
 Ensure provision & use of P.P.E (Goggles, Ear Plugs,
Nose Masks, and Electrical robber hand gloves).
 Maintain good housekeeping at all times.
 Suitable fire extinguisher (CO2, DCP), should be kept
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for T&C Fire rated Bus Duct. Risk Assesssment No.00462
Company OMEGA ENGINEERING W.L.L Department MEP Date:30/12/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00462
Discription of Activity/Task: Testing and Commissioning of Fire rated Bus Duct.
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

in place.
 Use only suitable and inspected instrument& tool.

 Work on de-energized circuits whenever possible. Use


proper lock-out/tag-out procedures. If these procedures
are not in place or not enforced, assume the circuit is live.
 Ensure those carrying out testing are competent and
provide more training (induction, TBT, Pre-STARRT task
briefing) in which hazards, safe working methods and
5 4 20 precaution must be included. 1 4 4
 Contact with live
 Ensure effective use of Pre-electrical energizing check list.
conductors leading to  All workers.  Ensure instructions and information from a competent
Testing 2
8. electric shock.  Supervisors. Engineer to supervisors and to those undertaking the
Insulation  Foremen. testing, are clear and well understood.
 Short circuit leading to
Testing.  Inspectors.  Use protective gear. Use insulated tools, Wear flame
fire or explosion. resistant clothing, safety glasses, and insulation gloves,
 And one
 Over loading leading to Remove watches or other jewelry, and stand on an
within the
insulation mat.
fire or explosion. vicinity
 Never connect the insulation tester to energized
 Incompetent/Unauthoriz conductors or energized equipment and always follow the
ed person powering the manufacturer’s recommendations.
 Shut down the equipment to be tested by opening fuses,
panel. switches, and circuit breakers.
 Abnormal operation of  Disconnect the branch circuit conductors, grounded
conductors, grounding conductors, and all other equipment
panel due to poor from the unit under test.
installations leading to  Discharge conductor capacitance, both before and after
fire outbreak. the test. Some instruments may have automatic discharge
functions.
 Check for any leakage current through fuses, switches,
and breakers on de-energized circuits. Leakage current
can cause inconsistent and incorrect readings.
 Don’t use an insulation tester in a dangerous or explosive
atmosphere since the instrument can generate arcing in
damaged insulation.
 Use insulated rubber gloves when connecting test leads.
 Continuous supervision to be maintained at all stages of
the process and lone working must be prohibited.
 Emergency preparedness, adequate emergency
equipment are provided and competent emergency
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for T&C Fire rated Bus Duct. Risk Assesssment No.00462
Company OMEGA ENGINEERING W.L.L Department MEP Date:30/12/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00462
Discription of Activity/Task: Testing and Commissioning of Fire rated Bus Duct.
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

a. Isolation of  Presence of operatives are standby.


unwanted uncontrolled charges
circuits. which can harm the  Ensure provision and use of PVC gloves.
operator while isolating.  Ensure the body & environment are dry.
 Presence of Flammable  Ensure suitable foot isolation from the ground (dry
vapour in the Electric Safety Shoe).
Room.  Ensure the hands are free from tools (screw driver,
5 4 20 1 4 4
 Fire & Explosion.  All workers Spanners, etc.).
 Unauthorized who may  Switch ON carefully & safely.
9. Energizing of work in the  Ensure affected areas are free from flammable/
Equipment affected toxic atmosphere before switching ON.
 Other workers working area.  Keep Suitable fire extinguishers ready for use.
in the electrical rooms  Supervisors  Install lock & tag (LOTO) as per procedure as well
, foremen, as keep the Key in safe custody.
 Poor communication
Engineers.  Ensure effective supervision and monitoring of the
and coordination.
 All people process.
 Operator contact with
in the  Check all the rooms to ensure no workers are
charges leading to present in the rooms before powering and
electric shock. affected
area designate one worker to prevent access by
5 4 20 unauthorized persons once powered. 1 4 4
including
 Segregation of affected area with blue and white
visitors.
warning taps & install relevant warning signs.
 Coordinate with other workgroups who might be
harmed& inform them about the hazards present.
b. Isolating of  Arrange for firefighting and competent first aider.
final
distribution  Running Equipment
board.  Energized Circuit
 Ensure only competent personnel isolates.
 Ensure provision/use of PVC hand gloves.
 Isolate first before switching ON any power supply.
 Identify & confirm the switchgear feeding electrical
power to the installations.
 Isolate safely electrical power from the switchgear.
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for T&C Fire rated Bus Duct. Risk Assesssment No.00462
Company OMEGA ENGINEERING W.L.L Department MEP Date:30/12/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00462
Discription of Activity/Task: Testing and Commissioning of Fire rated Bus Duct.
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

 Unless there is a compelling safety issue such as life-


support equipment, alarm systems, hazardous location
ventilation, or lighting required for safety, standards
10 5 4 20 requires that circuits be de-energized and the system 2 2 4
be placed in an Electrically Safe Work Condition before
any work is performed.
 Placing equipment in Electrically Safe Work Condition,
 Electricians
 Contact with live cable /Operators.
always follow proper Lockout/tagout procedures.
leading to electric shock  Follow the recommended electrical precaution by RA.
 All worker.  The Hazards must be identified and warning labels
or electrocution.
Live  Supervisor. must be applied to all equipment that may be worked
 Short circuit leading to
 Foremen. on while energized.
Electricity fire or explosion. 
 Inspectors. Workers must be trained on the equipment, hazards
-Commissioning  Over loading leading to and safety precautions, and be certified as “qualified”
fire or explosion.  And one
of Fire rated Bus to work on energized equipment. Training and
within the
Duct.  Incompetent/Unauthoriz certification must be documented.
vicinity  All work performed on energized equipment must be
ed person powering the
panel. preceded by a job briefing and a signed Energized
 Abnormal operation of Electrical Work Permit.
 When working on or near energized circuits, proper
panel due to poor
protective clothing must be worn. The minimum flame
installations leading to retardant clothing, safety glasses, and protective
fire outbreak. gloves and equipment must meet recognized standard
(IEC60331-1, HSG 85) guidelines. Protective insulating
blankets and mats are also used to minimize exposure.
 Be certain there is adequate lighting for the tasks to be
performed. Portable lighting must be fully insulated so
that it will not accidentally cause short circuits when
used near energized components.
 Use barricades or barriers to warn unqualified
individuals from entering the area.
 Be prepared for the unexpected. Make sure
emergency communications and trained medical
personnel are available if something goes wrong.
 Use current-limiting overcurrent protective devices
wherever possible to reduce the potential electrical
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for T&C Fire rated Bus Duct. Risk Assesssment No.00462
Company OMEGA ENGINEERING W.L.L Department MEP Date:30/12/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00462
Discription of Activity/Task: Testing and Commissioning of Fire rated Bus Duct.
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

hazards.
 Prior to carrying out work that involves the
removal of existing accessories, a competent
engineer responsible for the task is to ensure
5 4 20 accessories and lighting connections are by use 2 2 4
 Work on Live electric of an LVMPRI: Positively identified;  Isolated
11 accessories from all energy sources and the isolation
 Ignition source (electric secured with LOTO locks & tags; and  Proven
sparks).  Authorised de-energised.
Maintenance  Incompatible/unsuitable technician  Prior to the commencement of the task, ensure
tools.  Supervisors that all preparatory test has been conducted by
Disconnection
and removal of  Defective/uninsulated , foremen, filling up the check list both from QA/QC
malfunctioning tools. Engineers inspectors and HSE department.
parts.  Incompetent personnel  Fire rated Bus Duct live maintenance work must
 Uninspected tools. be classified as high risk and approved
 Presence of flammable procedure and precautions must be followed.
atmosphere/  Ensure maintenance is done by competent
incompatible activities. workers & improve competency by provision of
 Interface with other relevant information, clear instructions, trainings
activity. and appropriate level of supervision.
 Ensure good standard of housekeeping before,
during and after the task.
 Workers removing any parts must ensure that
they are positively identified to prevent the wrong
accessories being removed.
 Ensure Electrical permit to work and LOTO PTW
is obtained and procedure followed.
 Unauthorised entry to be prohibited by making
the area exclusion zone and posting caution and
danger signs.
 Testing Insulated Tools, Testing Insulated
Gloves/ coveralls/other PPEs, Testing Insulated
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for T&C Fire rated Bus Duct. Risk Assesssment No.00462
Company OMEGA ENGINEERING W.L.L Department MEP Date:30/12/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00462
Discription of Activity/Task: Testing and Commissioning of Fire rated Bus Duct.
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

Barriers to be used.

12 4 3 12
 Ensure that the switches/keys are adequately 2 2 4
 All workers managed as per plans (once that need to be
who may closed must be ensured closed, or otherwise).
Work work in the  Ensure supplies to unwanted area are prevented
completion affected by isolation.
, area.  All sources of energy must be secure and locked
 Unsecured energy
Housekeeping  Supervisors with LOTO lock by authorised person only.
sources.
& energy , foremen,  Good standard of housekeeping to be
 Obstruction of
security Engineers.
emergency control, maintained.
 All people
firefighting equipment.  Accesses/egresses to be properly managed,
in the
 Physical hazards those meant to be open must be opened must
affected
 Fire hazards due to be kept open and those planned to be closed
area
human error. must be closed.
including
 Environmental hazards.  All panels, firefighting equipment and emergency
visitors.
control must not be obstructed with materials,
equipment.
 All potentially flying, falling material to be
organized & secured properly.
 All hazardous, combustible waste to be
disposed/managed accordingly by applying
waste reuse, reduction, and recycle.
 Observe, maintain safe and proper storage of
materials/equipment used, maintenance of PPEs
after use.
 Provide, protect& prevent all electrical cables
from exposing people to danger.
 Safety cones and barricades used, have to be
removed accordingly.
 Insulated electrical Tools, Insulated electrical Gloves/
coveralls/other PPEs, Insulated electrical Barriers to be
used.
. Health, Safety and Environtmantal Risk Assessment.
Title Risk assessment for T&C Fire rated Bus Duct. Risk Assesssment No.00462
Company OMEGA ENGINEERING W.L.L Department MEP Date:30/12/2019
Location Lusail Project Applicable to use: LUS-CP7B-QDSBG-MST-EL-00462
Discription of Activity/Task: Testing and Commissioning of Fire rated Bus Duct.
GENERAL RISK ASSESSMENT
Ref Risk Rating Residual
. Activities Potential/Hazards Persons at Risk Risk Rating
No:
Control Measures
L S R L S R

Additional comment/Information:

Risk Assessment Team

Name Designation Department Signature

Mr. Ahmed Dabbous Project Director Management

Mr. Mohammad Afwan HSES Manager(QD-SBG) HSES

Mr. Daniel Nbuduisi Chilaka-anya. HSE Manager(OMG) HSE