Professional Documents
Culture Documents
1
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
2
1
1 Erection and Incorrect sequence/ Operatives/Staff 4 4 16 HIGH 1) Ensure PTW to be in place. 2 4 8 LOW Supervisor
dismantling of Improper erection 2) Only trained persons are authorized to Engineer
Mobile tower and dismantling of build towers in line with manufacturer’s
scaffolding for scaffold instructions which must then be inspected
Testing & and tagged by a competent person
commissioning 3) Ensure that all personnel involved in the
of Emergency task understand the hazard and risk involved
Light System related to the task.
4) Area inspected prior to where structure is
to be erected.
5) Use towers with locking wheels and
outriggers.
6) Maneuver scaffolds by pushing/pulling
from the base only when free of
persons/equipment/materials/tools.
7)Secure the tools and objects kept on the
platform.
8) Minimize loading of materials on platforms
9) Implement safe working platform with
appropriate toe board to prevent falling
object
3
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
4
10)Guard rails and toe boards to be used for
all working platforms
11) Provide safe access to scaffold platforms
12) Do not climb cross-bracing as a means of
access
3 Use of power Damaged Operatives and 3 4 12 Medium 1. All portable electrical equipment must be 1 4 4 Low Supervisor
tools such as Sockets & cable staff PAT tested and color coded. Make sure Foreman
Drill insulation. the test dates are visible on the Site Eng.
machine/Grinder Electrocution equipment.
Electric shock 2. Ensure all disk shall be appropriate and
Short circuit & expiry date is over.
5
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
6
3. Ensure all power tools are in good
condition and appropriately maintained
4. Damaged industrial sockets and power
cables must be removed.
5. Ensure the electrical cable is not damaged
Burns
and has not been repaired with insulating
Trip/Fall
tape or unsuitable connectors.
Noise
Hearing loss 6. Ensure cables from power tools shall be
Vibration organized so as not to present a tripping
Dust hazard
7. Only trained competent operatives to
operate the power tools.
8. Ensure proper and regular maintenance
of equipment that takes account of noise
9. Ensure proper hearing protection always.
10.Make sure people use the right tool for
the job and are trained to use it correct
Power tools must be 110 Volt
4 Working near Unauthorized Operatives/Sta 4 5 20 HIGH 1) Ensure proper PTW is in place and correct 1 5 5 LOW Supervisor
live services Person ff/all isolation procedure have been carried out Engineer
Contact with live surrounding (i.e. LOTO)
services personnel 2) Ensure STARRT card is duly filled by
Inadvertent release working with in responsible person
of energy the area 3) Ensure Proper RAMS briefing with sign off
Electrical Hazard sheet signed by all involved personnel.
Electrocution 4) All tools and equipment properly pre-
7
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
8
inspected and colour coded
4) Post Warning Signs & Caution Tags In the
Electric Burn
Concern Area.
Short circuit
5) Un-Authorized Persons visible Warning
Fire
Signs Must be in place in the work area.
Lack of barricade
7) Visual Inspection Of Cables If Any Damage
and warning signs
8) Maintain good housekeeping
Trip/Fall
9) Ensure proper Fire fighting equipment is in
Property Damage
place and easily accessible.
Personnel injury
10) Ensure sufficient and appropriate PPE at
all times.
5 Use of Ladder Falling from height Operatives/ 3 4 12 Medium Ladder is not to use daily basis but in certain 1 4 4 Low Commissioni
Staff/ cases where there is very narrow place and ng Eng.
Working on Uneven even podium ladder not possible to fix in that Sup
ground cases Ladder can use if permission granted Foreman
from McLaren Safety
Falling objects 1) Only light work, off short duration and
work in which the operative can maintain
secure hand and foot hold can be undertaken
form a ladder
2) Never try to overreach with any ladders
3) Check the ladder is of suitable quality for
industrial use and is in good condition
4) Maintain a minimum of 3 points of contact
with stepladders at all times
(feet/thighs/hands)
If possible, avoid the use of stepladders at a
working height of 2 meters and more.
9
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
10
5) Check the ladder legs (and stays) are fully
deployed or locked (depending on type) to
maintain maximum base dimensions and the
step ladder is orientated to provide maximum
stability.
6) Stepladders/ladders has to be used on
leveled ground/firm base
7) Ensure that during using ladder from the
top 2 steps is blocked to avoid climb on that.
8) The ladder securely fixed to prevent
slipping outwards or sideways or securely
footed at all times.
9) Person must hold the ladder while another
operative working on it
8) Materials should not be placed above the
thread of ladders/step ladders
9) Do not carry any materials in one hand
while climbing or getting down from ladder
10) Ensure the area under the ladder is
barricaded especially if it is being used in a
public area.
11) Ensure the ladder is electrical insulated
podium type if working in live services
6) Fiber Optic Damage to existing Operatives/Staff 3 4 12 MED 1) Ensure proper PTW is obtained and 1 4 4 LOW Supervisor
Cable laying and services / complete all correspondence documents. Engineer
cable pulling Ergonomic hazard 2) Ensure the operatives are all well trained
Sharp edges and competent.
Pinch point (Hand 3) Ensure the access and egresses are free
11
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
12
from obstruction
4) Ensure proper Communication /
Coordination and close supervision.
5) Use proper body positioning and safe
handling procedures while lifting, pushing,
or dragging material.
6) Provide warning Sign boards
&barricading shall be provided.
7) Use padding to reduce direct contact with
injuries) sharp edges.
Musculoskeletal 8) Ensure proper Job rotation.
disorders 9) Provision of cable rollers.
Awkward 10) Keep fingers away from the pinch point
Posture/position area.
Slip/Trip
7 ARC Flash Involved all 4 4 16 High 1) Ensure that the test equipment used are 1 4 4 Low Testing &
Short circuit operatives having valid test certificates. Commission
13
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
14
Electric shock 2) The test leads are properly clamped/fixed ing engineer
Poor with the device/cable under test to avoid
communication sparks.
Lack of grounding 3). Identify and avoid electrical hazards
Fatality 4). Follow safe work practices such as,
lockout/tagout procedures.
Testing and 5) Trained and Competent personnel shall
commissioning be allowed to carry out the works
of 5). Ensure that the electrical apparatus is
FACP/PAVA/ELV safe
System 6). Ensure that sufficient spacing is
maintained with test equipment/device-
cable under test with other nearby
conductive materials
7). Both in service and abandoned cables
must be positively identify through existing
records and authorized tests.
8). Ensuring all cables and capacitors are
discharged before and after the application
of test voltage.
9). Ensuring temporary conductors used for
testing purposes must be of an adequate
size and be easily visible.
10). Ensuring effective communication and
close supervision within the work team.
17
Base Risk Ranking Residual Risk Ranking Person
CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Responsible
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk
L S L S
Score Rating Score Rating
18
11). A proper earth electrode resistance
tester should be used to measure earth
electrode resistance
2
3
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21 Approved By: Name Vishnu Mohan Position _PM________ Signature _ ________ ___________