JOB TITLE / AIM: JSA for the insulation of stripper column

JSA DATE:4/2/2007 JSA NO./ REVISION:


SUPERVISOR/ JSA LEADER Muhammad Omer SCRIBE: Abdullah Khan
PARTICIPANTS: M saleem, M, Nadeem ,M Arshad , M Azam Rauf ,Nisar Ahmad , Muhammad Nawaz < Maula Bux , M Panah ,
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps: List the main sequential steps. Each step should accomplish a specific component of the task.
1
1-Scaffold erection and dismantling
2-Cleaning of vessel
3-Spreading of polyurethane
4- Installation of glass net, stainless steel net, cladding Sheet, strip, Tightening of strip with tightening machine
5- Drilling in vessel strips
6- Pouring of silicon in gaps
7-Demobilization Digitally signed
by Abdullah Khan

Abdullah DN: cn=Abdullah


Khan, o=Descon,
ou=HSE, c=PK

Khan
Date: 2007.02.09
Signature
06:58:11 Z
Alternatives Considered: MSDS, Fire extinguisher Not Verified

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE, S: First aid kit must be present at the area and the HSE personnel is the first response in case of
emergency, Ambulance to be positioned near work area at all times

Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 . Mobilization of equipment and Unauthorised equipment/tools brought out Before mobilizing any equipment/tools make
materials to site sure that the materials got inspected and
colour coded.
Ensure that all personnel prior to start the
have been inducted and oriented about the
hazard in the job site.
Workers starting the job unfit to work All personnel must undergone fitness
certificate from the Del doctor. Not fit to work
shall not be allowed to work at the project
site.
Working with out JSA Ensure all the persons take part in the
toolbox meeting discussion. JSA was
discussed to workers and signed at the back.

Hand Injury Ensure proper hauling of materials/get help if


required/Wear hand gloves.
Exposure of workers to various hazard like Ensure workers are complying with the min.
hand injury, dust, eye injury PPE req. Safety shoes, helmet, safety glass,
dust mask,

2 Manual hauling of materials Exposure of workers to various hazard like Ensure workers are complying with the min. PPE
hand injury, dust, eye injury req. Safety shoes, helmet, safety glass,
Back injury Workers will be oriented about the proper posture
and positioning during the execution of the job.
Unskilled and uninducted personnel starting Ensure that toolbox meeting was regularly
the job conducted and people are aware of the job and the
hazard enclosed in the job they are performing.
JSA was discussed and signed at the back
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Personnel and equipment interface Ensure that during unloading of materials it will
be unloaded at the safe side not in traffic side. A
watchman must be available during unloading
Fall of materials to worker Materials should not be thrown down during
unloading instead there will be two person at the
trolley and three person shall stand down
receiving the rebars at a time and place at the
Hand injury ground.
Ensure workers are wearing the hand gloves

Trips Ensure materials are properly stage

3 Erection of scaffolding Fall of Workers or Materials Ensure workers are wearing appropriate full body
Harness and tie-off 100% on yellow tag
Scaffolding. No one should access a scaffold if
there is a red tag or no tag. Works on scaffold
must be supervised at all times. No equipment and
tools will be stored on the scaffold. All persons
working on scaffold must be trained on working
at heights and use of harnesses. All harness must
be checked daily by a competent person and
inspected monthly and logged. NO workers
should alter the scaffolding Ensure that no tools or
materials will be stored at the working platform
Ensure that no throwing of materials at elevated
area Ensure that area was secured and barricaded
Ensure that the scaffold is approved inspected by
BHPB person prior to used and tagged
Ensure workers properly inducted about the
Back injury proper positioning Ensure workers are complying
with the min. PPE req. Safety shoes, helmet,
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
safety glass, dust mask, Ensure workers have
provided water and proper shade.

4 Cleaning of vessel Persons walking on vessel No person shall be allowed to walk on vessel
while cleaning
Cleaning brush with long handle shall be used for
cleaning purpose.
Incase of person walking on vessel full body
harness shall be worn with 100 % tie off.
5 Spreading of polyurethane Skin irritation / Inhalation Plastic glove shall be worn while spreading of
polyurethane
Dust mask shall be used to prevent the inhalation
of polyurethane.
MSDS shall be available and all the instructions
shall be followed
As polyurethane is flammable fire extinguisher
shall be in place.
No grinding and welding works shall be done
where insulation work is going on.

6 Installation of glass net, stainless Pinch point, cutting injury All the bendings shall be moulded in side to avoid
steel net, cladding Sheet, strip, the cut or pinch point hazards.
Tightening of strip with tightening Be aware of hand held in the tightening machine
machine leather gloves shall be worn.
7 Drilling for blind reverts Loose clothing No loose clothing shall be worn scarf are not
allowed while drilling in progress.
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
SIMOPS Other workers/contractors working on the area
will be inform and advised to stop if necessary
8 Pouring of silicon in gaps MSDS MSDS for silocon shall be with doctor and
attached with JSA
9 Demobilzation Same Proper house keeping shall be done prior to
demobilization