PREPARED BY : NOR MUHD AFIQ B. NOR ZAMBRI DIV/DEPT : SUNWAY CONSTRUCTION DESCRIPTION OF JOB : JET GROUTING REVIEWED BY : ZAHRUL HUZAIRI LOCATION : KLCC HER NO : 06 REV NO : 00 APPROVED BY : TYPE OF ACTIVITIES : ROUTINE/ NON ROUTINE/EMERGENCY DATE : 04 / 03 / 2014 PAGE : Hazard (1) Threat (6) Barrier (7) Top Event (2) Control / Recover Consequences (3) Risk Rating (4) Initial Risk Final Risk Level Remedial Action Measure (8) P A E R Level (5) (9) Plan (10) Sub-activity:- Survey work & setting out Negligence of No Induction, Contact with Emergency recovery Body Injuries H H - M H M Nil operator communication toolbox, underground team, Special between worker briefing on utilities such as Toolbox and operator, awareness power, water, less awareness of operator, pipe etc. of the operator Full standing supervision by supervisor, finding utilities need to isolate
Sub-Activity:- Mobilization & Demobilization of Jet Grouting Machine
Negligence of Miss Engage Topple of Emergency recovery Major Injuries H H - M H M Nil operator communication experienced machine team, Special between and grouting and Toolbox, Re-briefing operator and competent caught in to the operator and signalman, less machine between signalman awareness of operators operator and use competent signalman, toolbox
Sub-Activity:- Lifting Equipment/ check supporting devices of the machine
Wear and tear No inspection Daily Wire cable Emergency recovery Major Injuries H H - M H M Nil of wire rope on the wire rope inspection snaps team, Special and other checklist by Toolbox, Re-briefing machine device operator, to the operator induction, toolbox,
Page 1 of 3 SUNWAY CONSTRUCTION SDN BHD PROJEK KLCC P1
HAZARD & EFFECT MANAGEMENT PROCESS (HEMP)
PREPARED BY : NOR MUHD AFIQ B. NOR ZAMBRI DIV/DEPT : SUNWAY CONSTRUCTION DESCRIPTION OF JOB : JET GROUTING REVIEWED BY : ZAHRUL HUZAIRI LOCATION : KLCC HER NO : 06 REV NO : 00 APPROVED BY : TYPE OF ACTIVITIES : ROUTINE/ NON ROUTINE/EMERGENCY DATE : 04 / 03 / 2014 PAGE : Hazard (1) Threat (6) Barrier (7) Top Event (2) Control / Recover Consequences (3) Risk Rating (4) Initial Risk Final Risk Level Remedial Action Measure (8) P A E R Level (5) (9) Plan (10) Sub-Activity:- Preparation of Grout using cement Contact with Heavy wind, Follow Effect to health, Emergency recovery Major Injuries M - M M M L Nil Cement improper PPE, CSDS for and skin team, Special (Chronic disease) compound improper PPE, Toolbox and Re- handling of material briefing for workers material handling, handling the material and others, provide perimeter blanket to cover for heavy wind
Sub-Activity:- Drilling using drilling machine
Unstable Raining season, Operator to Machine topple, Emergency recovery Major Injuries H H - - H M Nil condition of no steel plate, check machine topple team, Special ground not enough ground and hit workers Toolbox space to park stability, the machine Provide enough space for that activity, wear ppe, Induction and Toolbox
Page 2 of 3 SUNWAY CONSTRUCTION SDN BHD PROJEK KLCC P1
HAZARD & EFFECT MANAGEMENT PROCESS (HEMP)
PREPARED BY : NOR MUHD AFIQ B. NOR ZAMBRI DIV/DEPT : SUNWAY CONSTRUCTION DESCRIPTION OF JOB : JET GROUTING REVIEWED BY : ZAHRUL HUZAIRI LOCATION : KLCC HER NO : 06 REV NO : 00 APPROVED BY : TYPE OF ACTIVITIES : ROUTINE/ NON ROUTINE/EMERGENCY DATE : 04 / 03 / 2014 PAGE : Hazard (1) Threat (6) Barrier (7) Top Event (2) Control / Recover Consequences (3) Risk Rating (4) Initial Risk Final Risk Level Remedial Action Measure (8) P A E R Level (5) (9) Plan (10) Sub-activity:- Using High Pressure Grouting Horseplay with No awareness Follow Contact with Emergency recovery Major Injuries H - M - H M Nil the high of the workers proper Safe skin team, Special pressure that using the Operating Toolbox grouting machine Procedure (sop) when handling with high pressure machine, Induction, Toolbox
PREPARED BY : …………………………………… APPROVED BY : …………………………………..(PIC) SUPERVISOR : ……………………………………..
NAME: NOR MUHD AFIQ B. NOR ZAMBRI NAME: NIRMALENDU KUMAR DAS NAME:______________________________