Sequence of Hazard Hazard BEFORE RPC Risk Reduction Measures AFTER RPC
Basic Job Effect Severity/ Severity/
Steps Probability Probability
Spot Moving Personal Fatal or 2 1.1 Toolbox talk. 1: No injury/ 3
Equipment Equipment. injury, Permanent 1.2 Lift load with tag line on it. illness.
Crane Damage Disabling injury. 1.3 One personnel to give crane operator signals. Probability:
Operation. to Probability: 1.4 Control load out area by instructing other personnel remote, not
Sling Failure, equipment remote, not likely to stay clear lift area. likely but
Trip Hazards. . but possible 1.5 Wear PPE. possible
Overhead load. 1.6 Good communication between spotters on boat and
crane operator.