You are on page 1of 2

Assessors Name: Assessors signature: Location of Date of Review date:

Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

01 Prior to the Project Site Engineer


commencement  The ground surface is Manager
Moving of of the activity not uneven for shifting Supervisor
Materials Body Construction
High Yes Yes
(Shifting) posture of material. Manager Foreman
 Identify the required Site Manager Charge hand
manpower and
Project Operators
evaluate the required Engineer
Helpers
lifting device; reduce
Caught in HSE Manager
High Yes Yes
between manual handling.

 Ensure good grip, good


Yes footing and keep the

load closer to the man


Bumped High Yes Yes
lifting.

 Enhance proper lifting

Humid/ Hot High Yes Yes Yes technique, bend knees

of joints. Back
Medium
reasonably straight and

use leg muscles by

providing training to the


employees.

 Provide warning

RISK RATING MATRIX 1 E = employees


C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009
Sajimon KK – January 09
Assessors Name: Assessors signature: Location of Date of Review date:
Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

barricades, safety

signage, secure defined


Low
location of activities

 Schedule heavy objects

in morning and move

those light weights

during night.

 Ensure potable drinking

water availability and

other kind of energy

drink. Proceed to cool

area once feel

dizziness.

RISK RATING MATRIX 2 E = employees


C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009
Sajimon KK – January 09