HAZARD IDENTIFIED RISK ASSESMENT AND RISK CONTROL (HIRARC)

Company: Conducted by :
Yung Kong Construction sdn bhd
(Name, Designation)

Plastering work (Future Activity) ROBBY A/L ANIL


Process/Location:
SAFETY AND HEALTH OFFICER
Approved by:
Lim sok hiong
(Name,Designation) Date: (From:1/9/2018 to 2/12/2020 )
Site agent

Date: 1/9/2018 Review Date: - Next Review Date: 30/11/2018

1. Hazard Identification 2. Risk Analysis 3. Risk Control


L S R
I E I
No Work Activity? Hazard Which can cause/effect Existing Risk K V S Recommended PIC
Control E E K Control (Due
L R
(if any) I I
Measures Date/Status)
H T
O Y
O
D

1. Plastering work Dust Pollution Lung Housekeeping ,used 3 1 3 Refer to SDS and keep Safety Dept &
disease(silicosis)/nose disposal mask and copy for site personnel Site
and throat irritation training reference supervisor

Full PPE
Refer to SDS and keep Safety Dept &
Wallcrete contact Skin/eye irritation compliance, tool box 3 1 3
copy for site personnel Site
training
reference supervisor

Falling object while Extensive body Full PPE 3 4 12 Working at height safe Safety Dept &
hoisting cement beg injury/fatal compliance, tool box operational procedure site
and sand training and training supervisor
1. Hazard Identification 2. Risk Analysis 3. Risk Control
L S R
I E I
No Work Activity? Hazard Which can cause/effect Existing Risk K V S Recommended PIC
Control E E K Control (Due
L R
(if any) I I
Measures Date/Status)
H T
O Y
O
D
Cement mortar Eye/skin illness or Full PPE 3 1 3 Refer to SDS and keep Safety Dept &
splash irritation compliance, tool box copy for site personnel site
training reference supervisor

Sharpe edge object- Bodily injury and first Eliminate, Full PPE 3 1 3 Random inspection Safety Dept
pallet,door,or aid type injury compliance and worn proper PPE
window frame