You are on page 1of 1

ESqUIRE KNIT COMPOSITE LIMITED.

STANDPIPE SYSTEM I NSPECTION CHECKLIST


INTERNAL (WEEKLY)
lnspection Date: 2_9- l1 -23
STA' 'us

INSPECTION PROCESS OK NOT REMARKS

Fire Department Connection functional and condition check. Also Ensure


that, there is no blockage and physical damage present.

All gate valve functional and condition check. AIso ensure that all are wide
open.

All Hose pipe condition check.


B.aLl..".-
{cruuA 'rr^r-rd
*)1\/eE\-
L Water preassure is present at requitred level.

All preassure guage meter condition check and working properly


\/-

Weekly Draining and refilling through drain valve to clean the water,

AII air release valve is working properly.

All landing valve Condition check,


also ensure that there is no physical damage occur

L
All hose box physical condition check.
\r/'

*+w*
lnspected By -M2 ftr"f
Section tnchilge