PROJECT ON THR CONSTRUCTION OF THREE HOSTEL BLOCKS

AT UOB JALO CAMPUS

SUBMITTED TO SUBMITTED BY
E. MOHAMED MAHFOUZ MOHAMED BASHASHA

(1032)

Date: 23rd Aug, 2019


IDENTFCATION
Uob Jalo Issued A Tender For The Construction Of Three Hostel Blocks. As
The Number Of Students Are Increasing Each Year So Is The Demand Of The
Hostel Blocks Because Most Of The Student Are From Different Area Of Libya

Barga Contracting and Real Estate Investment Bid on the above mentioned
tender which was issued by Uob Jalo and submitted proposal for the project .

Barga Contracting and Real Estate Investment has a well organized project team
as well as necessary equipment for the construction of the Hostel Blocks.

Based on the proposal submitted by the contractor, Uob Jalo selected Barga
Contracting and Real Estate Investment for the construction of the Hostel
Blocks.

PROJECT SCOPE
Barga Contracting and Real Estate Investment Selected a consulting company
(Libya consulting pvt. Limited) to design the architectural and structural
drawings and designs for the construction of the Three Hostel Blocks at Uob
Jalo. The consulting company will therefore design the drawings and make all
the technical specification s in the process of the complete delivery of the Hostel
Blocks. As well as consulting company will appoint an engineer to approve and
check the status of the project at each point of completion. The total covered
area of the project should be 35,000 ft 3. Therefore Barga Contracting and Real
Estate Investment will complete the construction of the Hostel Blocks as per the
requirements and specifications.

PROJECT OBJECTIVES
To provide flawless, safe, rigid and tolerant construction so that the end product
is as per the requirements of the client. Contracting and Real Estate Investment
desires to complete the project within the approved budget and time and with the
involvement of all the project teams and also to provide the final product as per
the expectations of the client .

PROJECT SCHEDULE
Project to be completed within two years from the date of signing of contract .