You are on page 1of 1

LOKASI PEKERJAAN :

300 KETERANGAN :
GARIS PAGAR
BATAS TANAH

200 30 110 35 30

200
BAK KONTROL BAK KONTROL SEPTICTANK FIBER

27

200
400

100
KAP. 12 M3
RESERVOIR

200

150

125
150

KEGIATAN :
150
150

PEKERJAAN :
1000

150

KONSULTAN PERENCANA :
150
250

FADLULLAH,ST.
200

DIREKTUR

JUDUL GAMBAR :
GRILL SALURAN

KOLAM PEMBUANGAN
EXISTING

200 125 150 150 175 150 150 175 150 150 125

275 325 300 325 275


28

1500 150
4

SIKU L 40x40mm
PLAT STRIP 38x4 mm BANGUNAN Digambar : ihs
PIPA INSTALASI AIR BEKAS
TOILET EXISTING
DAN INSTALASI AIR HUJAN Struktur : sl

Arsitek : jp

Skala :
SKALA 1 : 50 JUMLAH : 4 UNIT SKALA 1 : 100
PIPA INSTALASI AIR KOTOR

Tahun Anggaran :

No. Gambar :

You might also like