You are on page 1of 3

Dewi Sabrina Safitri

101316105
PE 2

Depth (ft) Bit Size (in.) Drilling Time (hrs) WOB (lb) N (rpm) Mud density (ppg) ROP (ft/hr)
6000 8.5 4.72 35,000 120 9 1271.19
6500 8.5 4.85 35000 120 9 1340.21
7000 8.5 6.5 35000 110 9 1076.92
7500 8.5 7.58 35000 110 9 989.45
8000 8.5 11.21 30000 110 9.4 713.65
8500 7.875 10.87 30000 110 9.4 781.97
9000 7.875 12.69 30000 110 9.4 709.22
9500 7.875 14.28 30000 110 9.8 665.27
10000 7.875 6.49 30000 110 10.1 1540.83
10200 7.875 7.61 30000 100 10.1 1340.34
10400 7.875 8.1 30000 100 10.1 1283.95
10600 7.875 8.62 30000 100 10.5 1229.70
10800 7.875 9.17 30000 90 11.1 1177.75
11000 7.875 10.47 30000 90 11.1 1050.62
11200 7.875 11.17 30000 90 11.3 1002.69
11400 7.875 11.91 30000 90 11.6 957.18
11600 7.875 9.13 35000 90 11.6 1270.54
11800 7.875 9.71 35000 90 11.8 1215.24
12000 7.875 9.71 35000 90 13.1 1235.84
12200 7.875 10 35000 90 13.4 1220.00
12400 7.875 11.11 35000 90 13.6 1116.11
12600 7.875 11.11 35000 90 14.2 1134.11
12800 7.875 11.71 35000 90 14.5 1093.08

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 0.00
6000 6000

7000 7000

8000 8000
Depth (f)
Depth (f)

9000 9000

10000 depht vs d 10000

11000 11000

12000 12000

13000 13000
d Exponent
13000
d Exponent
d dc
0.58 0.58
0.56 0.56
0.60 0.60
0.63 0.63
0.70 0.67
0.69 0.66
1.) Determined whether there are any indications
0.72 0.69 of over pressure zone based on drilling data from mud logger
0.74 0.68 and shows the starting depth of abnormal zone.
0.47 0.42 Show the calculation process (1 sample data) of d exponent
and dc exponent. Assuming the mud density equivalent
0.49 0.43 to normal formation pressure is 9.0 ppg
0.50 0.45
0.51 0.44
0.49 0.40
0.53 0.43
0.55 0.43
0.56 0.44
0.49 0.38
0.51 0.39
0.50 0.35
0.51 0.34
0.54 0.36
0.53 0.34
0.54 0.34

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
6000

7000

8000
Depth (f)

9000

10000 depht vs dc

11000

12000

13000
dc Exponent

You might also like