You are on page 1of 1

Perhitungan volume pengecoran segmen 2 + Dinding Spillway

segmen 2
2
Keterangan A(m ) l(m) V (m3) Total (m3)
pondasi 2.675 12.34 66.019
sloof2 0.647 10.04 6.496
lantai 70.522 0.3 21.157 98.660
sloof3 0.647 5 3.235
lantai 5.844 0.3 1.753
Dinding spillway bag.sayap 2.849 4 11.396
43.8746
Dinding spillway bag. memanjang 2.849 11.4 32.4786
total 142.534

You might also like