CHECK LIST sl. Description Completed’ No Yes _No Setti 1. | Check the approved site plans and setting out drawings for dimensional correctness and clarity 2. | Site has been cleared and leveled as per requirement 3. _ | Are the required tools and equipments available for marking ? 4, | Check ifthe calibration of the leveling instrument older than 6 months ? 5. | Check ifthe TBM’s have been established and cross check their level with respect to a permanent bench mark 6. | Check the set back distances as per the setting out drawings 7. | Check ifall the marking pillars are at the same level 8. | Check the spacing between any two consecutive marking pillars is within 5m, 9. | Check randomly ifthe marking pillars are starting from a depth of 30cms below the surrounding natural ground level 10. | Check if PCC has been laid before constructing the marking pillars 11. | Check if step down pillars have been constructed on sloping ground 12. | Check if the grid lines have been marked on the pillars almost near the center of the pillar. 13. | Check if the name of the grid has been painted on the marking pillar. 14, Check if the thickness of the marking line on the pillar is of the same thickness as the division mark on the measuring tape. (should not be unclean or very thick ) 15. | Check if the marking pillar has been plastered and white washed 16. | Check ifthe marking pillars have been barricaded and protected, 17. | Check ifthe traverse and the setting out has been cross checked by a marking supervisor from another site © SIM 2008 39 1 2. Description arking Cross check the grid lines that have been transferred to the ground, Check the dimensions of the area where the PCC will be laid Check ifthe top of all the pegs/ button marks are at the same level Peon) Check the grid lines that have been transferred and confirm their accuracy with respect to the relevant drawings. Check the dimensions of the column! footing that have been marked Check the diagonals of the column/ footing Cross Check the location of the column/ footing with respect to the already casted columns / footings if any The cement paste used for marking should be properly cured (Hessian cloth or gunny bag should be laid and curing should be done) for a minimum of 3days Check if the right angle template used is in proper working condition Check the diagonals of the starter marking Check the plumb of the starter marking of peripheral columns with respect to the columns below. After the starter marking, check if the mark is clear and accurate, with The marking that has been made will have to be checked by an experienced engineer Check if two rings have been inserted just above the slab top level, two rings further up for the dowel bars, to maintain the required cover. Completed Yes Bema No 40 CHAPTER 1 MARKING Sl. No oie 1 2 3. 4. Ellas Description enon Cross check the entire meter marking that has been done. Check if the meter mark is displaying; the block number, RL, RL+1m, and Total height (H+ - height with respect to 0.000 level). Check if the meter mark is clean and well maintained. Check if an FFL benck mark has been established under the meter mark. ina Check the room dimensions after the thread is tied. Ensure that the location of the door and openings are marked along the line of the thread ar) Check if the minimum plaster thickness is available using a nylon thread along the button marks in all direction Ensure that the distance between consecutive button marks is not more than 1.5m. Check the vertcality of the button marks on the walls using a 2m spirit level Check the button marking done for architectural features, Mone Check if the center of al the balcony openings is along the same vertical line, using a plumb bob. Check if all the balcony railings are of the same size ma Check the height of the mid landing slab bottom level Check the height of the riser of each step, that is marked on the column. Completed Yes No @ STM 2008 4 Description Completed Yes No marking 1 Check the height of the mid landing slab bottom level, 2 Check the height of the riser of each step, that is marked on the column. sement drain slope marking 1. | Check if the location, alignment and the dimensions of the marking is according to the GFC drawings. Son 1. | Check ifthe height if the hand rail marking is ata height of 1m through out. 42 CHAPTER 1 MARKING

You might also like