MECHANICAL WORKS

• Ductworks (Ventilation, A/C, Pressurization)


1.0 Smoke test / pressure test (leak test)
2.0 Air balancing of air distributions (grilles/diffusers)
• Pipeworks (Chilled Water, Condenser Water, LPG, Fuel pipes)
1.0 Hydrotest / pressure test, Pneumatic Test
• Fuel Storage Tank
1.0 Pneumatic / Pressure Test
2.0 Oil Level Controller
• Refrigerant Pipes
1.0 Pressure Leak, Flushing, Vacuuming
• Condensate Drain Pipes
1.0 Gravity Test
2.0 Flow test
• Chiller (Air-cooled, Water-cooled)
1.0 Insulation / Continuity Test of Feeder Lines
2.0 Electrical Reading
3.0 Rated Cooling Capacity
4.0 Functional of Safety Devices
5.0 Water Balancing
6.0 Simulation of Metering Devices Calibration
• Cooling Tower
1.0 Insulation / Continuity Test of Feeder Lines
2.0 Electrical Reading
3.0 Rated Cooling Capacity
4.0 Make-up Water Flow rate
5.0 Functional of Safety Devices
• Heat Exchanger
1.0 Rated Cooling Capacity
2.0 Simulation of Metering Devices Calibration
• Pumps (Chilled Water, Condenser Water, Fuel Oil Pumps)
1.0 Insulation / Continuity Test of Feeder Lines
2.0 Electrical Reading
3.0 Flowrate (gpm) vs Dynamic Head (meter)
4.0 Functional of Safety Devices
5.0 Water Balancing
6.0 Simulation Test for System Operation
7.0 Simulation of Metering Devices Calibration
• Fans / Blowers
1.0 Insulation / Continuity Test of Feeder Lines
2.0 Electrical Reading
3.0 Noise decibel test
4.0 Air Flowrate Capacity
5.0 Air Balancing
6.0 Functional test of Safety Devices
7.0 Functional test interfacing to FDAS (Stair/Elevator Press Fan, Smoke
Evacuation Fan)
• FCU / AHU / PWCU / VAV
1.0 Insulation / Continuity Test of Feeder Lines
2.0 Electrical Reading
3.0 Noise decibel test
4.0 Rated Capacity
5.0 Air Traverse Reading / Air Balancing
6.0 Water Balancing
7.0 Functional test of Safety Devices
8.0 Simulation Test of Motorize Valve, Thermostat Controller, VFD
9.0 Simulation of Metering Devices Calibration
10.0 Functional test interfacing to FDAS (Smoke Dectection)
• ACCU
1.0 Insulation / Continuity Test of Feeder Lines
2.0 Electrical Reading
3.0 Rated Capacity
4.0 Functional test of Safety Devices
• LPG
1.0 Pneumatic / Pressure Test
2.0 Functional of Safety Devices
• Others (Pending / Punchlist items)

ELECTRICAL and AUXILIARY WORKS


• Wires / Cables
1.0 Insulation / Continuity Test of Feeder Lines
2.0 Resistance Test and Hi-pot Test
3.0 Mandrelling Test for Conduits
• Switchgear
1.0 Factory Acceptance Test (Plant Visit)
2.0 Contact Resistance Test
3.0 Functional test of Safety Devices
4.0 Polarity Test
• Transformer
1.0 Insulation Resistance Test
2.0 Winding Resistance Test
3.0 Turns Ratio Test
4.0 Excitation Test
5.0 Di-electric Breakdown Voltage Test
• Capacitor Bank
1.0 Functional / Simulation Test
• Generator Set
1.0 Factory Acceptance Test (Plant Visit)
2.0 Load / Endurance Test
3.0 Functional test of Safety Devices
• Sync Panel / ATS / MTS
1.0 Load Transfer (Normal to Emergency Power and vise versa)
2.0 Load Sharing / Load Demand (Synchronizing)
3.0 Functional test of Safety Devices
• Panel boards / ECB
1.0 Voltage Test
2.0 Functional test
• Lightings
1.0 Functional Test
2.0 Branch Circuit Test (Loop Test)
• Electrical & Auxiliary Devices/Fixtures (Switches, Outlets, etc...)
1.0 Voltage Test
2.0 Functional test
• Lightning and Grounding Works
1.0 Continuity Test
2.0 Earth Resistance Test
• Conveying System (Elevator / Escalator)
1.0 Load Test
2.0 Functional test of Safety Devices
3.0 Functional Test of Intercom and Fireman’s Switch
4.0 Functional test interfacing to FDAS
• BMU / Gondola
1.0 Load Test
2.0 Electrical Reading
3.0 Functional of Safety Devices
• FDAS System
1.0 Functional test of devices (Smoke, Heat, Bell, Manual Pull Station)
2.0 Simulation Test of Interfaced System
• Background Music / Paging System
1.0 Functional test of devices
2.0 Noise Decibel Test
• CCTV and Security System
1.0 Functional test of devices
2.0 Simulation Test of Camera’s Locations indicating in Monitor
• Others (Pending / Punchlist items)

PLUMBING WORKS
• Water lines, Sanitary and Storm Drainage Pipes
1.0 Hydrotest / Gravity Test / Pressure Test
2.0 Disinfection / Potability Test
• Domestic Water Tank
1.0 Hydrotest / Pressure Test
2.0 Disinfection / Potability Test
• Pump (Transfer, CPS, Submersible)
1.0 Insulation / Continuity Test of Feeder Lines
2.0 Electrical Reading
3.0 Flowrate (gpm) vs Dynamic Head (meter)
4.0 Functional test of Safety Devices
5.0 Simulation Test of System Operation
6.0 Simulation of Metering Devices Calibration
• Fixtures / Drains
1.0 Flow Test
2.0 Slope to Drain
3.0 Functional Test

FIRE PROTECTION WORKS


• Pipe Works (Dry and Wet)
1.0 Hydro-test (leak test)
2.0 System Flushing Test
• Pumps (Fire Pump / Jockey Pump)
1.0 Insulation / Continuity Test of Feeder Lines
2.0 Electrical Reading
3.0 Flowrate (gpm) vs Dynamic Head (meter)
4.0 Functional of Safety Devices
5.0 Simulation Test for System Operation (Cut-in/cut-out, parallel operation…)
• Sprinkler Heads
1.0 Hydro and Flushing Test
2.0 Bursting Test
• Flow and Supervisory Switches
1.0 Functional Test
2.0 Simulation Test
Supplemental Requirements

1.0 All necessary testing gadget/equipment must be calibrated to assure


accuracy of test results.
2.0 Initial testing of Contractors to all equipment, facility or utility system should
be performed and passed.
3.0 All data on initial testing form of APMC shall be accomplished and submitted
to us at least 2 days before the actual final testing.
4.0 Supplier/Contractor’s approved methodology for testing should be available
during the testing.

Assessment and Acceptance

1.0 Reading should be within (+) or ( –) 10% of the design parameters.

2.0 Actual data shall not cause damage to equipment or system during normal
and continuous operation.

3.0 Shall not cause system in-efficiency which will result to higher power
consumption.