You are on page 1of 27

CONTRACT NO.

: 4850000259
COMPANY : PC KETAPANG II Ltd (PCK2L)
CONTRACTOR : PT. Timas Suplindo
PROJECT TITLE : EPCIC of BTJT-A WHP Deck Extension and Well Tie-In for Bukit

No. Document No. Description

1 2
1. Detail Design Engineering for Addtional Flowline
1.1 PROCESS
2.2.1 Study and Philosophy
BTJT-A-B-BOD-0001 Project Design Basis (General) - Addendum
BTJT-A-B-REP-0006 Vent, Relief and Blowdown Report (WHP) - Addendum
BTP3-000-DD-TMS-BTJT-A-B-RPT-0002 Process Simulation Study
BTJT-A-B-PHL-0004 Process Control and Safeguarding Philosophy(Welhead Platform) - Addendum
BTJT-A-B-PHL-0005 Safe guarding Memorandum (Welhead Platform) - Addendum

2.2.2 Calculation
BTP3-000-DD-TMS-BTJT-A-B-CAL-0001 Process and Utility Demand / Requirement Calculation (WHP) - Addendum
BTP3-000-DD-TMS-BTJT-A-B-CAL-0002 Corrosion Inhibitor Package Calculation
BTP3-000-DD-TMS-BTJT-A-B-CAL-0003 Line Sizing Calculation

2.2.3 List Drawing

11-BTJT-A-B-3000 Line List

2.2.4 Drawing
2.2.4.1 Process Flow Diagram & Heat Material Balance
11-BTJT-A-B-1041 Process Flow Diagram Future Well W-0340
11-BTJT-A-B-0101 Heat and Material Balance

2.2.4.2 Utility Flow Diagram


11-BTJT-A-B-2001 UFD Vent, Blowdown, Closed Drain And Open Drain Collection
11-BTJT-A-B-2003 Utility Flow Diagram Chemical Injection System
11-BTJT-A-B-2022 Utility Flow Diagram New Chemical Injection (Corrosion Inhibitor) System
11-BTJT-A-B-2004 Utility Flow Diagram Diesel System
BTJT-A-B-2000 Utility Flow Diagram Power Gas System

2.2.4.3 Piping and Instrumentation Diagram


11-BTJT-A-B-1009 P&ID Production and Test Manifold (Modification)
11-BTJT-A-B-1017 P&ID Gas Lift Manifold (Modification)
11-BTJT-A-B-1029 P&ID Single Completion Well W-0340 and Flowline (Future)
11-BTJT-A-B-1030 P&ID New Production and Test Manifold (Continued)
11-BTJT-A-B-2010 P&ID Instrument Gas Receiver(Modification)
11-BTJT-A-B-2011 P&ID Diesel System (Modification)
11-BTJT-A-B-2016 P&ID Chemical Injection System (Scale Inhibitor) (Modification)
11-BTJT-A-B-2017 P&ID Chemical Injection System (Wax Inhibitor) (Modification)
11-BTJT-A-B-2018 P&ID Chemical Injection System (Hydrate Inhibitor) (Modification)
11-BTJT-A-B-2019 P&ID Chemical Injection System (Pour Point Depressant) (Modification)
11-BTJT-A-B-2023 P&ID New corrosion inhibitor peckage
Open 1
NTRACT NO. : 4850000259
MPANY : PC KETAPANG II Ltd (PCK2L)
NTRACTOR : PT. Timas Suplindo
OJECT TITLE : EPCIC of BTJT-A WHP Deck Extension and Well Tie-In for Bukit Tua Phase 3 Devel

Critical
Document No. Description Last Rev. from Synergy

1 2 8 9
etail Design Engineering for Addtional Flowline
1.1 PROCESS
2.2.1 Study and Philosophy
BTJT-A-B-BOD-0001 Project Design Basis (General) - Addendum 1
BTJT-A-B-REP-0006 Vent, Relief and Blowdown Report (WHP) - Addendum 0
TP3-000-DD-TMS-BTJT-A-B-RPT-0002 Process Simulation Study 0
BTJT-A-B-PHL-0004 Process Control and Safeguarding Philosophy(Welhead Platform) - Addendum 0
BTJT-A-B-PHL-0005 Safe guarding Memorandum (Welhead Platform) - Addendum 0

2.2.2 Calculation
TP3-000-DD-TMS-BTJT-A-B-CAL-0001 Process and Utility Demand / Requirement Calculation (WHP) - Addendum 0
TP3-000-DD-TMS-BTJT-A-B-CAL-0002 Corrosion Inhibitor Package Calculation 0
TP3-000-DD-TMS-BTJT-A-B-CAL-0003 Line Sizing Calculation 0

2.2.3 List Drawing

11-BTJT-A-B-3000 Line List 0

2.2.4 Drawing
2.2.4.1 Process Flow Diagram & Heat Material Balance
11-BTJT-A-B-1041 Process Flow Diagram Future Well W-0340 0
11-BTJT-A-B-0101 Heat and Material Balance 0

2.2.4.2 Utility Flow Diagram


11-BTJT-A-B-2001 UFD Vent, Blowdown, Closed Drain And Open Drain Collection 0
11-BTJT-A-B-2003 Utility Flow Diagram Chemical Injection System 0
11-BTJT-A-B-2022 Utility Flow Diagram New Chemical Injection (Corrosion Inhibitor) System 0
11-BTJT-A-B-2004 Utility Flow Diagram Diesel System 0
BTJT-A-B-2000 Utility Flow Diagram Power Gas System 0

2.2.4.3 Piping and Instrumentation Diagram


11-BTJT-A-B-1009 P&ID Production and Test Manifold (Modification) 0
11-BTJT-A-B-1017 P&ID Gas Lift Manifold (Modification) 0
11-BTJT-A-B-1029 P&ID Single Completion Well W-0340 and Flowline (Future) 0
11-BTJT-A-B-1030 P&ID New Production and Test Manifold (Continued) 0
11-BTJT-A-B-2010 P&ID Instrument Gas Receiver(Modification) 0
11-BTJT-A-B-2011 P&ID Diesel System (Modification) 0
11-BTJT-A-B-2016 P&ID Chemical Injection System (Scale Inhibitor) (Modification) 0
11-BTJT-A-B-2017 P&ID Chemical Injection System (Wax Inhibitor) (Modification) 0
11-BTJT-A-B-2018 P&ID Chemical Injection System (Hydrate Inhibitor) (Modification) 0
11-BTJT-A-B-2019 P&ID Chemical Injection System (Pour Point Depressant) (Modification) 0
11-BTJT-A-B-2023 P&ID New corrosion inhibitor peckage 0
Open 2
O. : 4850000259
: PC KETAPANG II Ltd (PCK2L)
: PT. Timas Suplindo
LE : EPCIC of BTJT-A WHP Deck Extension and Well Tie-In for Bukit Tua Phase 3 Development Pr

Critical
Orginato
ment No. Description Last Rev. from Synergy
/ Scope

1 2 8 9 10
n Engineering for Addtional Flowline
SS
2.2.1 Study and Philosophy
-B-BOD-0001 Project Design Basis (General) - Addendum 1 AEM
-B-REP-0006 Vent, Relief and Blowdown Report (WHP) - Addendum 0 AEM
MS-BTJT-A-B-RPT-0002 Process Simulation Study 0 AEM
-B-PHL-0004 Process Control and Safeguarding Philosophy(Welhead Platform) - Addendum 0 AEM
-B-PHL-0005 Safe guarding Memorandum (Welhead Platform) - Addendum 0 AEM

2.2.2 Calculation
MS-BTJT-A-B-CAL-0001 Process and Utility Demand / Requirement Calculation (WHP) - Addendum 0 AEM
MS-BTJT-A-B-CAL-0002 Corrosion Inhibitor Package Calculation 0 AEM
MS-BTJT-A-B-CAL-0003 Line Sizing Calculation 0 AEM

2.2.3 List Drawing

JT-A-B-3000 Line List 0 AEM

2.2.4 Drawing
2.2.4.1 Process Flow Diagram & Heat Material Balance
JT-A-B-1041 Process Flow Diagram Future Well W-0340 0 AEM
JT-A-B-0101 Heat and Material Balance 0 AEM

2.2.4.2 Utility Flow Diagram


JT-A-B-2001 UFD Vent, Blowdown, Closed Drain And Open Drain Collection 0 AEM
JT-A-B-2003 Utility Flow Diagram Chemical Injection System 0 AEM
JT-A-B-2022 Utility Flow Diagram New Chemical Injection (Corrosion Inhibitor) System 0 AEM
JT-A-B-2004 Utility Flow Diagram Diesel System 0 AEM
-A-B-2000 Utility Flow Diagram Power Gas System 0 AEM

2.2.4.3 Piping and Instrumentation Diagram


JT-A-B-1009 P&ID Production and Test Manifold (Modification) 0 AEM
JT-A-B-1017 P&ID Gas Lift Manifold (Modification) 0 AEM
JT-A-B-1029 P&ID Single Completion Well W-0340 and Flowline (Future) 0 AEM
JT-A-B-1030 P&ID New Production and Test Manifold (Continued) 0 AEM
JT-A-B-2010 P&ID Instrument Gas Receiver(Modification) 0 AEM
JT-A-B-2011 P&ID Diesel System (Modification) 0 AEM
JT-A-B-2016 P&ID Chemical Injection System (Scale Inhibitor) (Modification) 0 AEM
JT-A-B-2017 P&ID Chemical Injection System (Wax Inhibitor) (Modification) 0 AEM
JT-A-B-2018 P&ID Chemical Injection System (Hydrate Inhibitor) (Modification) 0 AEM
JT-A-B-2019 P&ID Chemical Injection System (Pour Point Depressant) (Modification) 0 AEM
JT-A-B-2023 P&ID New corrosion inhibitor peckage 0 AEM
Open 3
S
U
B
C
: 4850000259 C
u
: PC KETAPANG II Ltd (PCK2L) O
r
N
r
: PT. Timas Suplindo T
e
: EPCIC of BTJT-A WHP Deck Extension and Well Tie-In for Bukit Tua Phase 3 Development Project
R
n
A
t
D
C
a
T
tS

Critical
Orginator Ot
e
No. Description Last Rev. from Synergy
/ Scope R a
t
R
S
u
e
U
s
c
2 8 9 10 B
###
e
neering for Addtional Flowline M
i
Iv
2.2.1 Study and Philosophy S
e
S
d
001 Project Design Basis (General) - Addendum 1 AEM
I
006 Vent, Relief and Blowdown Report (WHP) - Addendum 0 AEM O
A-B-RPT-0002 Process Simulation Study 0 AEM N
004 Process Control and Safeguarding Philosophy(Welhead Platform) - Addendum 0 AEM
005 Safe guarding Memorandum (Welhead Platform) - Addendum 0 AEM

2.2.2 Calculation
A-B-CAL-0001 Process and Utility Demand / Requirement Calculation (WHP) - Addendum 0 AEM
A-B-CAL-0002 Corrosion Inhibitor Package Calculation 0 AEM
A-B-CAL-0003 Line Sizing Calculation 0 AEM

2.2.3 List Drawing

00 Line List 0 AEM

2.2.4 Drawing
2.2.4.1 Process Flow Diagram & Heat Material Balance
41 Process Flow Diagram Future Well W-0340 0 AEM
01 Heat and Material Balance 0 AEM

2.2.4.2 Utility Flow Diagram


01 UFD Vent, Blowdown, Closed Drain And Open Drain Collection 0 AEM
03 Utility Flow Diagram Chemical Injection System 0 AEM
22 Utility Flow Diagram New Chemical Injection (Corrosion Inhibitor) System 0 AEM
04 Utility Flow Diagram Diesel System 0 AEM
0 Utility Flow Diagram Power Gas System 0 AEM

2.2.4.3 Piping and Instrumentation Diagram


09 P&ID Production and Test Manifold (Modification) 0 AEM
17 P&ID Gas Lift Manifold (Modification) 0 AEM
29 P&ID Single Completion Well W-0340 and Flowline (Future) 0 AEM
30 P&ID New Production and Test Manifold (Continued) 0 AEM
10 P&ID Instrument Gas Receiver(Modification) 0 AEM
11 P&ID Diesel System (Modification) 0 AEM
16 P&ID Chemical Injection System (Scale Inhibitor) (Modification) 0 AEM
17 P&ID Chemical Injection System (Wax Inhibitor) (Modification) 0 AEM
18 P&ID Chemical Injection System (Hydrate Inhibitor) (Modification) 0 AEM
19 P&ID Chemical Injection System (Pour Point Depressant) (Modification) 0 AEM
23 P&ID New corrosion inhibitor peckage 0 AEM
Open 4
No. Document No. Description

2.2.4.4 SAFE Chart


11-BTJT-A-B-8000 SAFE Chart

2.2.4.5 Process Safeguarding Flow Scheme


11-BTJT-A-B-1003-1 of 8 Process Safeguarding Flow Scheme (Scheme System)
11-BTJT-A-B-8001 Process Safeguarding Flow Scheme New Production Wellhead System (2 Sh

2.2.4.6 Shutdown Hierarchy


11-BTJT-A-I-1000 Process Emergency Stutdown Logic Wellhead Production System Shutdown

1.2 PROCESS SAFETY


11-BTJT-A-X-0002 WHP Hazardous Area Classification (Normal) Mezzanine Deck
11-BTJT-A-X-0009 WHP Hazardous Area Classification (SIPROD) Mezzanine Deck
11-BTJT-A-X-2000-2 of 3 Escape Route, Fire Fighting, ans Safety Equipment Layout Main Deck TOS. EL +20.00
Safety studies provide by TIMAS IPF STUDY FOR 4th WELL TO BE INCLUDED
Scope TIMAS ( Update FERA, QRA report, EERA)
1.3 MECHANICAL
Specification
Corrosion Inhibitor Package

Study/Report
Mechanical Handling Report

Datasheet
Corrosion Inhibitor Package

2.4.4 List
BTP3-000-DD-TMS-BTJT-A-M-LST-0001 Master Equipment List (additional Pump)

2.4.5 Drawing

11-BTJT-A-M-0002 Equipment Layout - Main Deck TOS El. +24.500

11-BTJT-A-M-0003 Equipment Layout - Mezzanine Deck TOS El. +20.000


11-BTJT-A-M-0004 Equipment Layout - Cellar Deck TOS El. +16.000
11-BTJT-A-M-0007 Equipment Elevation - Looking North
11-BTJT-A-M-0008 Equipment Elevation - Looking East

1.4 PIPING
1.2.1 Calculation

BTP3-000-DD-TMS-BTJT-A-P-CAL-0001 Pipe Stress Calculation for Additional Flowline

1.2.2 Drawing
Piping Plan/Layout Drawing
Piping Support Location Plan Drawing

Open 5
Critical
Document No. Description Last Rev. from Synergy

2.2.4.4 SAFE Chart


11-BTJT-A-B-8000 SAFE Chart 0

2.2.4.5 Process Safeguarding Flow Scheme


11-BTJT-A-B-1003-1 of 8 Process Safeguarding Flow Scheme (Scheme System) 0
11-BTJT-A-B-8001 Process Safeguarding Flow Scheme New Production Wellhead System (2 Sh 0

2.2.4.6 Shutdown Hierarchy


11-BTJT-A-I-1000 Process Emergency Stutdown Logic Wellhead Production System Shutdown 3

1.2 PROCESS SAFETY


11-BTJT-A-X-0002 WHP Hazardous Area Classification (Normal) Mezzanine Deck 0
11-BTJT-A-X-0009 WHP Hazardous Area Classification (SIPROD) Mezzanine Deck 0
11-BTJT-A-X-2000-2 of 3 Escape Route, Fire Fighting, ans Safety Equipment Layout Main Deck TOS. EL +20.000 2
Safety studies provide by TIMAS IPF STUDY FOR 4th WELL TO BE INCLUDED IPF part
Scope TIMAS ( Update FERA, QRA report, EERA)
1.3 MECHANICAL
Specification
Corrosion Inhibitor Package Update from Synergy

Study/Report
Mechanical Handling Report Update from Synergy

Datasheet
Corrosion Inhibitor Package Update from Synergy

2.4.4 List
TP3-000-DD-TMS-BTJT-A-M-LST-0001 Master Equipment List (additional Pump) 1

2.4.5 Drawing

11-BTJT-A-M-0002 Equipment Layout - Main Deck TOS El. +24.500 0

11-BTJT-A-M-0003 Equipment Layout - Mezzanine Deck TOS El. +20.000 1


11-BTJT-A-M-0004 Equipment Layout - Cellar Deck TOS El. +16.000 1
11-BTJT-A-M-0007 Equipment Elevation - Looking North 1
11-BTJT-A-M-0008 Equipment Elevation - Looking East 1

1.4 PIPING
1.2.1 Calculation

TP3-000-DD-TMS-BTJT-A-P-CAL-0001 Pipe Stress Calculation for Additional Flowline

1.2.2 Drawing
Piping Plan/Layout Drawing Update from Synergy
Piping Support Location Plan Drawing Update from Synergy

Open 6
Critical
Orginato
ment No. Description Last Rev. from Synergy
/ Scope

2.2.4.4 SAFE Chart


JT-A-B-8000 SAFE Chart 0 AEM

2.2.4.5 Process Safeguarding Flow Scheme


A-B-1003-1 of 8 Process Safeguarding Flow Scheme (Scheme System) 0 AEM
JT-A-B-8001 Process Safeguarding Flow Scheme New Production Wellhead System (2 Sh 0 AEM

2.2.4.6 Shutdown Hierarchy


JT-A-I-1000 Process Emergency Stutdown Logic Wellhead Production System Shutdown 3 AEM

SS SAFETY
JT-A-X-0002 WHP Hazardous Area Classification (Normal) Mezzanine Deck 0 AEM
JT-A-X-0009 WHP Hazardous Area Classification (SIPROD) Mezzanine Deck 0 AEM
A-X-2000-2 of 3 Escape Route, Fire Fighting, ans Safety Equipment Layout Main Deck TOS. EL +20.000 2 AEM
Safety studies provide by TIMAS IPF STUDY FOR 4th WELL TO BE INCLUDED IPF part of Instrume
Scope TIMAS ( Update FERA, QRA report, EERA)
NICAL
Specification
Corrosion Inhibitor Package Update from Synergy

Study/Report
Mechanical Handling Report Update from Synergy

Datasheet
Corrosion Inhibitor Package Update from Synergy

2.4.4 List
MS-BTJT-A-M-LST-0001 Master Equipment List (additional Pump) 1 AEM

2.4.5 Drawing

T-A-M-0002 Equipment Layout - Main Deck TOS El. +24.500 0 AEM

T-A-M-0003 Equipment Layout - Mezzanine Deck TOS El. +20.000 1 AEM


T-A-M-0004 Equipment Layout - Cellar Deck TOS El. +16.000 1 AEM
T-A-M-0007 Equipment Elevation - Looking North 1 AEM
T-A-M-0008 Equipment Elevation - Looking East 1 AEM

1.2.1 Calculation

MS-BTJT-A-P-CAL-0001 Pipe Stress Calculation for Additional Flowline TSON #

1.2.2 Drawing
Piping Plan/Layout Drawing Update from Synergy
Piping Support Location Plan Drawing Update from Synergy

Open 7
e
R
n
A
t
D
C
a
T
tS

Critical
Orginator Ot
e
No. Description Last Rev. from Synergy
/ Scope R a
t
R
S
u
e
U
s
c
B
e
M
i
Iv
2.2.4.4 SAFE Chart
S
e
00 SAFE Chart 0 AEM
S
d
I
2.2.4.5 Process Safeguarding Flow Scheme O
1 of 8 Process Safeguarding Flow Scheme (Scheme System) 0 AEM N
01 Process Safeguarding Flow Scheme New Production Wellhead System (2 Sh 0 AEM

2.2.4.6 Shutdown Hierarchy


00 Process Emergency Stutdown Logic Wellhead Production System Shutdown 3 AEM

TY
02 WHP Hazardous Area Classification (Normal) Mezzanine Deck 0 AEM
09 WHP Hazardous Area Classification (SIPROD) Mezzanine Deck 0 AEM
2 of 3 Escape Route, Fire Fighting, ans Safety Equipment Layout Main Deck TOS. EL +20.000 2 AEM
Safety studies provide by TIMAS IPF STUDY FOR 4th WELL TO BE INCLUDED IPF part of Instrumentation
Scope TIMAS ( Update FERA, QRA report, EERA)

Specification
Corrosion Inhibitor Package Update from Synergy

Study/Report
Mechanical Handling Report Update from Synergy

Datasheet
Corrosion Inhibitor Package Update from Synergy

2.4.4 List
A-M-LST-0001 Master Equipment List (additional Pump) 1 AEM

2.4.5 Drawing

002 Equipment Layout - Main Deck TOS El. +24.500 0 AEM

003 Equipment Layout - Mezzanine Deck TOS El. +20.000 1 AEM


004 Equipment Layout - Cellar Deck TOS El. +16.000 1 AEM
007 Equipment Elevation - Looking North 1 AEM
008 Equipment Elevation - Looking East 1 AEM

1.2.1 Calculation

A-P-CAL-0001 Pipe Stress Calculation for Additional Flowline TSON ###

1.2.2 Drawing
Piping Plan/Layout Drawing Update from Synergy
Piping Support Location Plan Drawing Update from Synergy

Open 8
No. Document No. Description

Isometric Additional Flowline


11-BTJT-A-P-2070-3 of 4 PDOP3-50-AI-6040-13410X-(02)
11-BTJT-A-P-2070-4 of 4 PDOP3-50-AI-6040-13410X-(02)
11-BTJT-A-P-2014 PDOP3-300-P-0447-91430X-ET-40
11-BTJT-A-P-2015 PDOP3-500-P-0450-91430X-ET-40
11-BTJT-A-P-2042 PDOP3-50-P-0442-91430X-ET-40
11-BTJT-A-P-2068 PDOP3-50-VH-6361-11490X (02)
11-BTJT-A-P-2030 PDOP3-80-PG-0607-91430X-IH-25
11-BTJT-A-P-2076 PDOP3-150-P-0446-91430X-ET-40
11-BTJT-A-P-2077-1 of 4 PDOP3-150-P-0430-91430X-ET-40
11-BTJT-A-P-2077-2 of 4 PDOP3-150-P-0430-91430X-ET-40
11-BTJT-A-P-2077-3 of 4 PDOP3-150-P-0430-91430X-ET-40
11-BTJT-A-P-2077-4 of 4 PDOP3-150-P-0430-91430X-ET-40
11-BTJT-A-P-2078 PDOP3-150-P-0428-151430X-ET-40
11-BTJT-A-P-2079 PXOP3-150-P-0428-151430X-ET-40
11-BTJT-A-P-2080 PXOP3-50-VH-6349-151490X
11-BTJT-A-P-2081 PDOP3-15-AI-6039-13410X
11-BTJT-A-P-2082 PDOP3-50-P-0434-91430X-ET-25
11-BTJT-A-P-2083 PXOP3-50-PG-0630-151430X-IH-25
11-BTJT-A-P-2084 PDOP3-50-PG-0630-151430X-IH-25
11-BTJT-A-P-2085-1 of 2 PDOP3-50-PG-0628-91430X-IH-25
11-BTJT-A-P-2085-2 of 2 PDOP3-50-PG-0628-91430X-IH-25(02)
11-BTJT-A-P-2086 PDOP3-50-PG-628-91430X-IH-25
11-BTJT-A-P-2087 PDOP3-50-PG-0628-91430X-IH-25(01)
11-BTJT-A-P-2088 PDOP3-50-PG-0629-91430X-IH-25
11-BTJT-A-P-2089 PDOP3-50-VH-63621-11490X-(01)
11-BTJT-A-P-2090 PXOP3-50-VH-6362-11490X
11-BTJT-A-P-2091 PDOP3-50-VH-6362-11490X-(02)
11-BTJT-A-P-2092 PXOP3-15-VT-Z11-W0340-151430X

Pipe Support Additional Flowline


11-BTJT-A-P-7006 TMS-SPS-MD-0005
11-BTJT-A-P-7007 TMS-SPS-MD-0006
11-BTJT-A-P-7008 TMS-SPS-MD-0007
11-BTJT-A-P-7009 TMS-SPS-MD-0008
11-BTJT-A-P-7110 TMS-SPS-MZ-0021
11-BTJT-A-P-7111 TMS-SPS-MZ-0022
11-BTJT-A-P-7112 TMS-SS-MD-0005
11-BTJT-A-P-7113 TMS-PS-CD-0027
11-BTJT-A-P-7114 TMS-PS-CD-0028
11-BTJT-A-P-7115 TMS-PS-CD-0029
11-BTJT-A-P-7116 TMS-PS-MZ-0051
11-BTJT-A-P-7117 TMS-PS-MZ-0052
11-BTJT-A-P-7118 TMS-PS-MZ-0053
11-BTJT-A-P-7119 TMS-PS-MZ-0054
11-BTJT-A-P-7120 TMS-PS-MZ-0055
11-BTJT-A-P-7121 TMS-PS-MZ-0056
11-BTJT-A-P-7122 TMS-PS-MZ-0057
11-BTJT-A-P-7123 TMS-PS-MZ-0058
1.2.3 Datasheet
Manual Valve Datasheet
SP Items Datasheet
Spring Support Datasheet

List
Critical Line List
Open 9
Critical
Document No. Description Last Rev. from Synergy

Isometric Additional Flowline


11-BTJT-A-P-2070-3 of 4 PDOP3-50-AI-6040-13410X-(02) Update Drawing Synergy
11-BTJT-A-P-2070-4 of 4 PDOP3-50-AI-6040-13410X-(02) Update Drawing Synergy
11-BTJT-A-P-2014 PDOP3-300-P-0447-91430X-ET-40 Update Drawing Synergy
11-BTJT-A-P-2015 PDOP3-500-P-0450-91430X-ET-40 Update Drawing Synergy
11-BTJT-A-P-2042 PDOP3-50-P-0442-91430X-ET-40 Update Drawing Synergy
11-BTJT-A-P-2068 PDOP3-50-VH-6361-11490X (02) Update Drawing Synergy
11-BTJT-A-P-2030 PDOP3-80-PG-0607-91430X-IH-25 Update Drawing Synergy
11-BTJT-A-P-2076 PDOP3-150-P-0446-91430X-ET-40 New Drawing
11-BTJT-A-P-2077-1 of 4 PDOP3-150-P-0430-91430X-ET-40 New Drawing
11-BTJT-A-P-2077-2 of 4 PDOP3-150-P-0430-91430X-ET-40 New Drawing
11-BTJT-A-P-2077-3 of 4 PDOP3-150-P-0430-91430X-ET-40 New Drawing
11-BTJT-A-P-2077-4 of 4 PDOP3-150-P-0430-91430X-ET-40 New Drawing
11-BTJT-A-P-2078 PDOP3-150-P-0428-151430X-ET-40 New Drawing
11-BTJT-A-P-2079 PXOP3-150-P-0428-151430X-ET-40 New Drawing
11-BTJT-A-P-2080 PXOP3-50-VH-6349-151490X New Drawing
11-BTJT-A-P-2081 PDOP3-15-AI-6039-13410X New Drawing
11-BTJT-A-P-2082 PDOP3-50-P-0434-91430X-ET-25 New Drawing
11-BTJT-A-P-2083 PXOP3-50-PG-0630-151430X-IH-25 New Drawing
11-BTJT-A-P-2084 PDOP3-50-PG-0630-151430X-IH-25 New Drawing
11-BTJT-A-P-2085-1 of 2 PDOP3-50-PG-0628-91430X-IH-25 New Drawing
11-BTJT-A-P-2085-2 of 2 PDOP3-50-PG-0628-91430X-IH-25(02) New Drawing
11-BTJT-A-P-2086 PDOP3-50-PG-628-91430X-IH-25 New Drawing
11-BTJT-A-P-2087 PDOP3-50-PG-0628-91430X-IH-25(01) New Drawing
11-BTJT-A-P-2088 PDOP3-50-PG-0629-91430X-IH-25 New Drawing
11-BTJT-A-P-2089 PDOP3-50-VH-63621-11490X-(01) New Drawing
11-BTJT-A-P-2090 PXOP3-50-VH-6362-11490X New Drawing
11-BTJT-A-P-2091 PDOP3-50-VH-6362-11490X-(02) New Drawing
11-BTJT-A-P-2092 PXOP3-15-VT-Z11-W0340-151430X New Drawing

Pipe Support Additional Flowline


11-BTJT-A-P-7006 TMS-SPS-MD-0005 Develop Drawing Synergy
11-BTJT-A-P-7007 TMS-SPS-MD-0006 Develop Drawing Synergy
11-BTJT-A-P-7008 TMS-SPS-MD-0007 Develop Drawing Synergy
11-BTJT-A-P-7009 TMS-SPS-MD-0008 Develop Drawing Synergy
11-BTJT-A-P-7110 TMS-SPS-MZ-0021 New Drawing
11-BTJT-A-P-7111 TMS-SPS-MZ-0022 New Drawing
11-BTJT-A-P-7112 TMS-SS-MD-0005 New Drawing
11-BTJT-A-P-7113 TMS-PS-CD-0027 New Drawing
11-BTJT-A-P-7114 TMS-PS-CD-0028 New Drawing
11-BTJT-A-P-7115 TMS-PS-CD-0029 New Drawing
11-BTJT-A-P-7116 TMS-PS-MZ-0051 New Drawing
11-BTJT-A-P-7117 TMS-PS-MZ-0052 New Drawing
11-BTJT-A-P-7118 TMS-PS-MZ-0053 New Drawing
11-BTJT-A-P-7119 TMS-PS-MZ-0054 New Drawing
11-BTJT-A-P-7120 TMS-PS-MZ-0055 New Drawing
11-BTJT-A-P-7121 TMS-PS-MZ-0056 New Drawing
11-BTJT-A-P-7122 TMS-PS-MZ-0057 New Drawing
11-BTJT-A-P-7123 TMS-PS-MZ-0058 New Drawing
1.2.3 Datasheet
Manual Valve Datasheet Update from Synergy
SP Items Datasheet Update from Synergy
Spring Support Datasheet Update from Synergy

List
Critical Line List Update from Synergy
Open 10
Critical
Orginato
ment No. Description Last Rev. from Synergy
/ Scope

Isometric Additional Flowline


A-P-2070-3 of 4 PDOP3-50-AI-6040-13410X-(02) Update Drawing Synergy TSON #
A-P-2070-4 of 4 PDOP3-50-AI-6040-13410X-(02) Update Drawing Synergy TSON
JT-A-P-2014 PDOP3-300-P-0447-91430X-ET-40 Update Drawing Synergy TSON
JT-A-P-2015 PDOP3-500-P-0450-91430X-ET-40 Update Drawing Synergy TSON
JT-A-P-2042 PDOP3-50-P-0442-91430X-ET-40 Update Drawing Synergy TSON
JT-A-P-2068 PDOP3-50-VH-6361-11490X (02) Update Drawing Synergy TSON #
JT-A-P-2030 PDOP3-80-PG-0607-91430X-IH-25 Update Drawing Synergy TSON #
JT-A-P-2076 PDOP3-150-P-0446-91430X-ET-40 New Drawing TSON #
A-P-2077-1 of 4 PDOP3-150-P-0430-91430X-ET-40 New Drawing TSON #
A-P-2077-2 of 4 PDOP3-150-P-0430-91430X-ET-40 New Drawing TSON #
A-P-2077-3 of 4 PDOP3-150-P-0430-91430X-ET-40 New Drawing TSON #
A-P-2077-4 of 4 PDOP3-150-P-0430-91430X-ET-40 New Drawing TSON #
JT-A-P-2078 PDOP3-150-P-0428-151430X-ET-40 New Drawing TSON #
JT-A-P-2079 PXOP3-150-P-0428-151430X-ET-40 New Drawing TSON #
JT-A-P-2080 PXOP3-50-VH-6349-151490X New Drawing TSON #
JT-A-P-2081 PDOP3-15-AI-6039-13410X New Drawing TSON #
JT-A-P-2082 PDOP3-50-P-0434-91430X-ET-25 New Drawing TSON #
JT-A-P-2083 PXOP3-50-PG-0630-151430X-IH-25 New Drawing TSON #
JT-A-P-2084 PDOP3-50-PG-0630-151430X-IH-25 New Drawing TSON #
A-P-2085-1 of 2 PDOP3-50-PG-0628-91430X-IH-25 New Drawing TSON #
A-P-2085-2 of 2 PDOP3-50-PG-0628-91430X-IH-25(02) New Drawing TSON #
JT-A-P-2086 PDOP3-50-PG-628-91430X-IH-25 New Drawing TSON #
JT-A-P-2087 PDOP3-50-PG-0628-91430X-IH-25(01) New Drawing TSON #
JT-A-P-2088 PDOP3-50-PG-0629-91430X-IH-25 New Drawing TSON #
JT-A-P-2089 PDOP3-50-VH-63621-11490X-(01) New Drawing TSON #
JT-A-P-2090 PXOP3-50-VH-6362-11490X New Drawing TSON #
JT-A-P-2091 PDOP3-50-VH-6362-11490X-(02) New Drawing TSON #
JT-A-P-2092 PXOP3-15-VT-Z11-W0340-151430X New Drawing TSON #

Pipe Support Additional Flowline


JT-A-P-7006 TMS-SPS-MD-0005 Develop Drawing Synergy TSON #
JT-A-P-7007 TMS-SPS-MD-0006 Develop Drawing Synergy TSON #
JT-A-P-7008 TMS-SPS-MD-0007 Develop Drawing Synergy TSON #
JT-A-P-7009 TMS-SPS-MD-0008 Develop Drawing Synergy TSON #
JT-A-P-7110 TMS-SPS-MZ-0021 New Drawing TSON #
JT-A-P-7111 TMS-SPS-MZ-0022 New Drawing TSON #
JT-A-P-7112 TMS-SS-MD-0005 New Drawing TSON #
JT-A-P-7113 TMS-PS-CD-0027 New Drawing TSON #
JT-A-P-7114 TMS-PS-CD-0028 New Drawing TSON #
JT-A-P-7115 TMS-PS-CD-0029 New Drawing TSON #
JT-A-P-7116 TMS-PS-MZ-0051 New Drawing TSON #
JT-A-P-7117 TMS-PS-MZ-0052 New Drawing TSON
JT-A-P-7118 TMS-PS-MZ-0053 New Drawing TSON
JT-A-P-7119 TMS-PS-MZ-0054 New Drawing TSON
JT-A-P-7120 TMS-PS-MZ-0055 New Drawing TSON
JT-A-P-7121 TMS-PS-MZ-0056 New Drawing TSON
JT-A-P-7122 TMS-PS-MZ-0057 New Drawing TSON
JT-A-P-7123 TMS-PS-MZ-0058 New Drawing TSON
1.2.3 Datasheet
Manual Valve Datasheet Update from Synergy
SP Items Datasheet Update from Synergy
Spring Support Datasheet Update from Synergy

List
Critical Line List Update from Synergy
Open 11
e
R
n
A
t
D
C
a
T
tS

Critical
Orginator Ot
e
No. Description Last Rev. from Synergy
/ Scope R a
t
R
S
u
e
U
s
c
Isometric Additional Flowline B
e
3 of 4 PDOP3-50-AI-6040-13410X-(02) Update Drawing Synergy TSON ###M
i
4 of 4 PDOP3-50-AI-6040-13410X-(02) Update Drawing Synergy TSON -Iv
14 PDOP3-300-P-0447-91430X-ET-40 Update Drawing Synergy TSON S
e
15 PDOP3-500-P-0450-91430X-ET-40 Update Drawing Synergy TSON S
d
42 PDOP3-50-P-0442-91430X-ET-40 Update Drawing Synergy TSON I
68 PDOP3-50-VH-6361-11490X (02) Update Drawing Synergy TSON ###O
30 PDOP3-80-PG-0607-91430X-IH-25 Update Drawing Synergy TSON ###N
76 PDOP3-150-P-0446-91430X-ET-40 New Drawing TSON ###
1 of 4 PDOP3-150-P-0430-91430X-ET-40 New Drawing TSON ###
2 of 4 PDOP3-150-P-0430-91430X-ET-40 New Drawing TSON ###
3 of 4 PDOP3-150-P-0430-91430X-ET-40 New Drawing TSON ###
4 of 4 PDOP3-150-P-0430-91430X-ET-40 New Drawing TSON ###
78 PDOP3-150-P-0428-151430X-ET-40 New Drawing TSON ###
79 PXOP3-150-P-0428-151430X-ET-40 New Drawing TSON ###
80 PXOP3-50-VH-6349-151490X New Drawing TSON ###
81 PDOP3-15-AI-6039-13410X New Drawing TSON ###
82 PDOP3-50-P-0434-91430X-ET-25 New Drawing TSON ###
83 PXOP3-50-PG-0630-151430X-IH-25 New Drawing TSON ###
84 PDOP3-50-PG-0630-151430X-IH-25 New Drawing TSON ###
1 of 2 PDOP3-50-PG-0628-91430X-IH-25 New Drawing TSON ###
2 of 2 PDOP3-50-PG-0628-91430X-IH-25(02) New Drawing TSON ###
86 PDOP3-50-PG-628-91430X-IH-25 New Drawing TSON ###
87 PDOP3-50-PG-0628-91430X-IH-25(01) New Drawing TSON ###
88 PDOP3-50-PG-0629-91430X-IH-25 New Drawing TSON ###
89 PDOP3-50-VH-63621-11490X-(01) New Drawing TSON ###
90 PXOP3-50-VH-6362-11490X New Drawing TSON ###
91 PDOP3-50-VH-6362-11490X-(02) New Drawing TSON ###
92 PXOP3-15-VT-Z11-W0340-151430X New Drawing TSON ###

Pipe Support Additional Flowline


06 TMS-SPS-MD-0005 Develop Drawing Synergy TSON ###
07 TMS-SPS-MD-0006 Develop Drawing Synergy TSON ###
08 TMS-SPS-MD-0007 Develop Drawing Synergy TSON ###
09 TMS-SPS-MD-0008 Develop Drawing Synergy TSON ###
10 TMS-SPS-MZ-0021 New Drawing TSON ###
11 TMS-SPS-MZ-0022 New Drawing TSON ###
12 TMS-SS-MD-0005 New Drawing TSON ###
13 TMS-PS-CD-0027 New Drawing TSON ###
14 TMS-PS-CD-0028 New Drawing TSON ###
15 TMS-PS-CD-0029 New Drawing TSON ###
16 TMS-PS-MZ-0051 New Drawing TSON ###
17 TMS-PS-MZ-0052 New Drawing TSON
18 TMS-PS-MZ-0053 New Drawing TSON
19 TMS-PS-MZ-0054 New Drawing TSON
20 TMS-PS-MZ-0055 New Drawing TSON
21 TMS-PS-MZ-0056 New Drawing TSON
22 TMS-PS-MZ-0057 New Drawing TSON
23 TMS-PS-MZ-0058 New Drawing TSON
1.2.3 Datasheet
Manual Valve Datasheet Update from Synergy
SP Items Datasheet Update from Synergy
Spring Support Datasheet Update from Synergy

List
Critical Line List Update from Synergy
Open 12
No. Document No. Description

1.2.4 MTO
BTP3-000-DD-TMS-BTJT-A-P-MTO-0001 MTO Piping Bulk
BTP3-000-DD-TMS-BTJT-A-P-MTO-0002 MTO Valves
BTP3-000-DD-TMS-BTJT-A-P-MTO-0003 MTO SP Items
MTO Insulation
MTO Pipe supports

RFQ for Manual Valve, SP Items


TBE for Manual Valve, SP Items

1.5 Electrical
Philosophy, Calculation and Study
BTP3-000-DD-TMS-BTJT-A-E-CAL-0001 Main Distribution Equipment Sizing Calculation
BTP3-000-DD-TMS-BTJT-A-E-RPT-0001 Electrical Load Study Report
BTP3-000-DD-TMS-BTJT-A-E-RPT-0003 Electrical System Study Report

Datasheet

BTP3-000-DD-TMS-BTJT-A-E-TDS-0001 Electrical Datasheets for Heat Tracing

List

11-BTJT-A-E-6000 Electrical Cable Schedule

11-BTJT-A-E-6001 Heat Tracing Cable Schedule


BTP3-000-DD-TMS-BTJT-A-E-LST-0001 Equipment Hazardous List

Drawings
BTJT-A-E-0000 Electrical Drawing Index
BTJT-A-E-0006 Earthing Layout Cellar Deck
11-BTJT-A-E-7000 Electrical Multi Cable Transit Layout & Arrangement E&I Equipment Room Layout
11-BTJT-A-E-0023 Power & Control Cable Routing Mezzanine Deck
11-BTJT-A-E-0024 Power & Control Cable Routing Cellar Deck
11-BTJT-A-E-1006 Motor Operated Valve (MOV) and Small Power Distribution Board Single Line Diagram
BTJT-A-E-1002 AC UPS Single Line Diagram
BTJT-A-E-1100 Heat Tracing Single Line Diagram
BTJT-A-E-0033 Electrical Ladder Support Layout - Mezzanine Deck
BTJT-A-E-0034 Electrical Ladder Support Layout - Cellar Deck
BTJT-A-E-4004 Interconnection Wiring Diagram 230V AC UPS System
BTJT-A-E-4006 Interconnection Wiring Diagram MOV Distribution Board
BTJT-A-E-DWG-4009 Interconnection Wiring Diagram Heat Tracing Distribution Board

MTO (EL-006)
BTP3-000-DD-TMS-BTJT-A-E-MTO-0001 Electrical MTO - BTJT-A

Electrical Technical Requisition (EL-007)


BTP3-000-DD-TMS-BTJT-A-E-RFQ-0001 Electrical RFQ For Heating Tracing

Electrical Technical Bid Evaluation (EL-008)

Open 13
Critical
Document No. Description Last Rev. from Synergy

1.2.4 MTO
TP3-000-DD-TMS-BTJT-A-P-MTO-0001 MTO Piping Bulk Update from Synergy
TP3-000-DD-TMS-BTJT-A-P-MTO-0002 MTO Valves Update from Synergy
TP3-000-DD-TMS-BTJT-A-P-MTO-0003 MTO SP Items Update from Synergy
MTO Insulation Update from Synergy
MTO Pipe supports Update from Synergy

RFQ for Manual Valve, SP Items Update from Synergy


TBE for Manual Valve, SP Items Update from Synergy

1.5 Electrical
Philosophy, Calculation and Study
TP3-000-DD-TMS-BTJT-A-E-CAL-0001 Main Distribution Equipment Sizing Calculation 0
TP3-000-DD-TMS-BTJT-A-E-RPT-0001 Electrical Load Study Report 1
TP3-000-DD-TMS-BTJT-A-E-RPT-0003 Electrical System Study Report 1

Datasheet

TP3-000-DD-TMS-BTJT-A-E-TDS-0001 Electrical Datasheets for Heat Tracing 1

List

11-BTJT-A-E-6000 Electrical Cable Schedule 0

11-BTJT-A-E-6001 Heat Tracing Cable Schedule 1


TP3-000-DD-TMS-BTJT-A-E-LST-0001 Equipment Hazardous List 1

Drawings
BTJT-A-E-0000 Electrical Drawing Index 0
BTJT-A-E-0006 Earthing Layout Cellar Deck 1
11-BTJT-A-E-7000 Electrical Multi Cable Transit Layout & Arrangement E&I Equipment Room Layout 0
11-BTJT-A-E-0023 Power & Control Cable Routing Mezzanine Deck 0
11-BTJT-A-E-0024 Power & Control Cable Routing Cellar Deck 0
11-BTJT-A-E-1006 Motor Operated Valve (MOV) and Small Power Distribution Board Single Line Diagram (MOV
0 DB-7730)
BTJT-A-E-1002 AC UPS Single Line Diagram 1
BTJT-A-E-1100 Heat Tracing Single Line Diagram 0
BTJT-A-E-0033 Electrical Ladder Support Layout - Mezzanine Deck 1
BTJT-A-E-0034 Electrical Ladder Support Layout - Cellar Deck 1
BTJT-A-E-4004 Interconnection Wiring Diagram 230V AC UPS System 1
BTJT-A-E-4006 Interconnection Wiring Diagram MOV Distribution Board 0
BTJT-A-E-DWG-4009 Interconnection Wiring Diagram Heat Tracing Distribution Board 1

MTO (EL-006)
TP3-000-DD-TMS-BTJT-A-E-MTO-0001 Electrical MTO - BTJT-A 1

Electrical Technical Requisition (EL-007)


TP3-000-DD-TMS-BTJT-A-E-RFQ-0001 Electrical RFQ For Heating Tracing 1

Electrical Technical Bid Evaluation (EL-008)

Open 14
Critical
Orginato
ment No. Description Last Rev. from Synergy
/ Scope

1.2.4 MTO
S-BTJT-A-P-MTO-0001 MTO Piping Bulk Update from Synergy TSOF #
S-BTJT-A-P-MTO-0002 MTO Valves Update from Synergy TSOF
S-BTJT-A-P-MTO-0003 MTO SP Items Update from Synergy TSOF #
MTO Insulation Update from Synergy
MTO Pipe supports Update from Synergy

RFQ for Manual Valve, SP Items Update from Synergy


TBE for Manual Valve, SP Items Update from Synergy

al
Philosophy, Calculation and Study
MS-BTJT-A-E-CAL-0001 Main Distribution Equipment Sizing Calculation 0 AEM
MS-BTJT-A-E-RPT-0001 Electrical Load Study Report 1 AEM
MS-BTJT-A-E-RPT-0003 Electrical System Study Report 1 AEM

Datasheet

MS-BTJT-A-E-TDS-0001 Electrical Datasheets for Heat Tracing 1 AEM

List

JT-A-E-6000 Electrical Cable Schedule 0 AEM

JT-A-E-6001 Heat Tracing Cable Schedule 1 AEM


MS-BTJT-A-E-LST-0001 Equipment Hazardous List 1 AEM

Drawings
-A-E-0000 Electrical Drawing Index 0 AEM
-A-E-0006 Earthing Layout Cellar Deck 1 AEM
JT-A-E-7000 Electrical Multi Cable Transit Layout & Arrangement E&I Equipment Room Layout 0 AEM
JT-A-E-0023 Power & Control Cable Routing Mezzanine Deck 0 AEM
JT-A-E-0024 Power & Control Cable Routing Cellar Deck 0 AEM
JT-A-E-1006 Motor Operated Valve (MOV) and Small Power Distribution Board Single Line Diagram (MOV
0 DB-7730) AEM
-A-E-1002 AC UPS Single Line Diagram 1 AEM
-A-E-1100 Heat Tracing Single Line Diagram 0 AEM
-A-E-0033 Electrical Ladder Support Layout - Mezzanine Deck 1 AEM
-A-E-0034 Electrical Ladder Support Layout - Cellar Deck 1 AEM
-A-E-4004 Interconnection Wiring Diagram 230V AC UPS System 1 AEM
-A-E-4006 Interconnection Wiring Diagram MOV Distribution Board 0 AEM
E-DWG-4009 Interconnection Wiring Diagram Heat Tracing Distribution Board 1 AEM

MTO (EL-006)
S-BTJT-A-E-MTO-0001 Electrical MTO - BTJT-A 1 AEM

Electrical Technical Requisition (EL-007)


MS-BTJT-A-E-RFQ-0001 Electrical RFQ For Heating Tracing 1 AEM

Electrical Technical Bid Evaluation (EL-008)

Open 15
e
R
n
A
t
D
C
a
T
tS

Critical
Orginator Ot
e
No. Description Last Rev. from Synergy
/ Scope R a
t
R
S
u
e
U
s
c
B
e
1.2.4 MTO M
i
-P-MTO-0001 MTO Piping Bulk Update from Synergy TSOF ###Iv
-P-MTO-0002 MTO Valves Update from Synergy TSOF S
e
-P-MTO-0003 MTO SP Items Update from Synergy TSOF ###
S
d
MTO Insulation Update from Synergy
I
O
MTO Pipe supports Update from Synergy
N
RFQ for Manual Valve, SP Items Update from Synergy
TBE for Manual Valve, SP Items Update from Synergy

Philosophy, Calculation and Study


A-E-CAL-0001 Main Distribution Equipment Sizing Calculation 0 AEM
A-E-RPT-0001 Electrical Load Study Report 1 AEM
A-E-RPT-0003 Electrical System Study Report 1 AEM

Datasheet

A-E-TDS-0001 Electrical Datasheets for Heat Tracing 1 AEM

List

00 Electrical Cable Schedule 0 AEM

01 Heat Tracing Cable Schedule 1 AEM


A-E-LST-0001 Equipment Hazardous List 1 AEM

Drawings
0 Electrical Drawing Index 0 AEM
6 Earthing Layout Cellar Deck 1 AEM
00 Electrical Multi Cable Transit Layout & Arrangement E&I Equipment Room Layout 0 AEM
23 Power & Control Cable Routing Mezzanine Deck 0 AEM
24 Power & Control Cable Routing Cellar Deck 0 AEM
06 Motor Operated Valve (MOV) and Small Power Distribution Board Single Line Diagram (MOV
0 DB-7730) AEM
2 AC UPS Single Line Diagram 1 AEM
0 Heat Tracing Single Line Diagram 0 AEM
3 Electrical Ladder Support Layout - Mezzanine Deck 1 AEM
4 Electrical Ladder Support Layout - Cellar Deck 1 AEM
4 Interconnection Wiring Diagram 230V AC UPS System 1 AEM
6 Interconnection Wiring Diagram MOV Distribution Board 0 AEM
009 Interconnection Wiring Diagram Heat Tracing Distribution Board 1 AEM

MTO (EL-006)
-E-MTO-0001 Electrical MTO - BTJT-A 1 AEM

Electrical Technical Requisition (EL-007)


A-E-RFQ-0001 Electrical RFQ For Heating Tracing 1 AEM

Electrical Technical Bid Evaluation (EL-008)


COMP
still re

Open 16
No. Document No. Description

BTP3-000-DD-TMS-BTJT-A-E-TBE-0001 TBE for Heat Treacing

1.6 INSTRUMENT

Instrument Specification
Specification for Modification ICSS - including
control and safeguarding narrative
Instrument Datasheet
BTP3-000-DD-TMS-BTJT-A-I-TDS-0002 Datasheet for Pressure Transmitter
BTP3-000-DD-TMS-BTJT-A-I-TDS-0003 Datasheet Temperature Transmitter
BTP3-000-DD-TMS-BTJT-A-I-TDS-0004 Datasheet for Actuated Choke Valves
BTP3-000-DD-TMS-BTJT-A-I-TDS-0006 Datasheet for Pressure Gauge
BTP3-000-DD-TMS-BTJT-A-I-TDS-0007 Datasheet for Motor Operated Valve
NO WET GAS FLOWMETER
BTP3-000-DD-TMS-BTJT-A-I-TDS-0008 Datasheet for Wet Gas Flowmeter

Instrument List
11-BTJT-A-I-DWG-6001 ICSS I/O List
11-BTJT-A-I-LIST-0001 Alarm and Trip Setting Lists
11-BTJT-A-I-LIST-0004 Instrument Index
11-BTJT-A-I-6001 Instrument, Fire & Gas Telecom Cable Schedule
Control system Upgrade Vendor information (Honeywell) to be provided for
information by TIMAS
Drawings
11-BTJT-A-I-0001 Instrument Location Plan
11-BTJT-A-I-0004 Instrument Air Supply Layout
11- BTJT-A-I-1001 Process Cause & Effect Matrix
11-BTJT-A-I-0002 Instrument JBs and Cable Layout Routing
11-BTJT-A-I-0005 Instrument Cable Tray - Ladder Layout
11-BTJT-A-I-0003 Instrument Tubing and Tray Routing Layout
11-BTJT-A-I-5001 Fusible Plug Loop and Tubing Tray Layout
11-BTJT-A-I-5004 Instrumentation Process Hook up
11-BTJT-A-I-7000 Instrument Loop Drawing

11-BTJT-A-I-2000 Instrument Control Block Diagram

BTJT-A-I-6002 ICSS Marshalling Cabinet Wiring Diagram

11-BTJT-A-I-6003 Instrument Junction Box Wiring Diagram

MTO
BTP3-000-DD-TMS-BTJT-A-I-MTO-0001 Instrument MTO

Technical Requistion
BTP3-000-DD-TMS-BTJT-A-I-RFQ-0002 RFQ for Pressure Transmitter
BTP3-000-DD-TMS-BTJT-A-I-RFQ-0003 RFQ Temperature Transmitter
BTP3-000-DD-TMS-BTJT-A-I-RFQ-0004 RFQ for Choke Valves
BTP3-000-DD-TMS-BTJT-A-I-RFQ-0005 RFQ for Pressure Gauge
BTP3-000-DD-TMS-BTJT-A-I-RFQ-0006 RFQ for Motor Operated Valve

Open 17
Critical
Document No. Description Last Rev. from Synergy

TP3-000-DD-TMS-BTJT-A-E-TBE-0001 TBE for Heat Treacing 0

1.6 INSTRUMENT

Instrument Specification
Specification for Modification ICSS - including
control and safeguarding narrative
Instrument Datasheet
TP3-000-DD-TMS-BTJT-A-I-TDS-0002 Datasheet for Pressure Transmitter 1
TP3-000-DD-TMS-BTJT-A-I-TDS-0003 Datasheet Temperature Transmitter 0
TP3-000-DD-TMS-BTJT-A-I-TDS-0004 Datasheet for Actuated Choke Valves 0
TP3-000-DD-TMS-BTJT-A-I-TDS-0006 Datasheet for Pressure Gauge 2
TP3-000-DD-TMS-BTJT-A-I-TDS-0007 Datasheet for Motor Operated Valve 0
NO WET GAS FLOWMETER
TP3-000-DD-TMS-BTJT-A-I-TDS-0008 Datasheet for Wet Gas Flowmeter 0

Instrument List
11-BTJT-A-I-DWG-6001 ICSS I/O List 1
11-BTJT-A-I-LIST-0001 Alarm and Trip Setting Lists 1
11-BTJT-A-I-LIST-0004 Instrument Index 1
11-BTJT-A-I-6001 Instrument, Fire & Gas Telecom Cable Schedule 2
Control system Upgrade Vendor information (Honeywell) to be provided for
information by TIMAS
Drawings
11-BTJT-A-I-0001 Instrument Location Plan 0
11-BTJT-A-I-0004 Instrument Air Supply Layout 1
11- BTJT-A-I-1001 Process Cause & Effect Matrix 2
11-BTJT-A-I-0002 Instrument JBs and Cable Layout Routing 0
11-BTJT-A-I-0005 Instrument Cable Tray - Ladder Layout 0
11-BTJT-A-I-0003 Instrument Tubing and Tray Routing Layout 0
11-BTJT-A-I-5001 Fusible Plug Loop and Tubing Tray Layout 1
11-BTJT-A-I-5004 Instrumentation Process Hook up 3
11-BTJT-A-I-7000 Instrument Loop Drawing 0

11-BTJT-A-I-2000 Instrument Control Block Diagram 1

BTJT-A-I-6002 ICSS Marshalling Cabinet Wiring Diagram 1

11-BTJT-A-I-6003 Instrument Junction Box Wiring Diagram 3

MTO
TP3-000-DD-TMS-BTJT-A-I-MTO-0001 Instrument MTO 1

Technical Requistion
TP3-000-DD-TMS-BTJT-A-I-RFQ-0002 RFQ for Pressure Transmitter 0
TP3-000-DD-TMS-BTJT-A-I-RFQ-0003 RFQ Temperature Transmitter 0
TP3-000-DD-TMS-BTJT-A-I-RFQ-0004 RFQ for Choke Valves 0
TP3-000-DD-TMS-BTJT-A-I-RFQ-0005 RFQ for Pressure Gauge 1
TP3-000-DD-TMS-BTJT-A-I-RFQ-0006 RFQ for Motor Operated Valve 0

Open 18
Critical
Orginato
ment No. Description Last Rev. from Synergy
/ Scope

MS-BTJT-A-E-TBE-0001 TBE for Heat Treacing 0 AEM

UMENT

Instrument Specification
Specification for Modification ICSS - including
control and safeguarding narrative
Instrument Datasheet
MS-BTJT-A-I-TDS-0002 Datasheet for Pressure Transmitter 1 AEM
MS-BTJT-A-I-TDS-0003 Datasheet Temperature Transmitter 0 AEM
MS-BTJT-A-I-TDS-0004 Datasheet for Actuated Choke Valves 0 AEM
MS-BTJT-A-I-TDS-0006 Datasheet for Pressure Gauge 2 AEM
MS-BTJT-A-I-TDS-0007 Datasheet for Motor Operated Valve 0 AEM
NO WET GAS FLOWMETER
MS-BTJT-A-I-TDS-0008 Datasheet for Wet Gas Flowmeter 0 AEM

Instrument List
A-I-DWG-6001 ICSS I/O List 1 AEM
A-I-LIST-0001 Alarm and Trip Setting Lists 1 AEM
A-I-LIST-0004 Instrument Index 1 AEM
JT-A-I-6001 Instrument, Fire & Gas Telecom Cable Schedule 2 AEM
Control system Upgrade Vendor information (Honeywell) to be provided for
information by TIMAS
Drawings
JT-A-I-0001 Instrument Location Plan 0 AEM
JT-A-I-0004 Instrument Air Supply Layout 1 AEM
JT-A-I-1001 Process Cause & Effect Matrix 2 AEM
JT-A-I-0002 Instrument JBs and Cable Layout Routing 0 AEM
JT-A-I-0005 Instrument Cable Tray - Ladder Layout 0 AEM
JT-A-I-0003 Instrument Tubing and Tray Routing Layout 0 AEM
JT-A-I-5001 Fusible Plug Loop and Tubing Tray Layout 1 AEM
JT-A-I-5004 Instrumentation Process Hook up 3 AEM
JT-A-I-7000 Instrument Loop Drawing 0 AEM

JT-A-I-2000 Instrument Control Block Diagram 1 AEM

T-A-I-6002 ICSS Marshalling Cabinet Wiring Diagram 1 AEM

JT-A-I-6003 Instrument Junction Box Wiring Diagram 3 AEM

MTO
MS-BTJT-A-I-MTO-0001 Instrument MTO 1 AEM

Technical Requistion
MS-BTJT-A-I-RFQ-0002 RFQ for Pressure Transmitter 0 AEM
MS-BTJT-A-I-RFQ-0003 RFQ Temperature Transmitter 0 AEM
MS-BTJT-A-I-RFQ-0004 RFQ for Choke Valves 0 AEM
MS-BTJT-A-I-RFQ-0005 RFQ for Pressure Gauge 1 AEM
MS-BTJT-A-I-RFQ-0006 RFQ for Motor Operated Valve 0 AEM

Open 19
e
R
n
A
t
D
C
a
T
tS

Critical
Orginator Ot
e
No. Description Last Rev. from Synergy
/ Scope R a
t
R
S
u
e
U
s
c
COMP
B
e re
still
M
i
A-E-TBE-0001 TBE for Heat Treacing 0 AEM
Iv
S
e
S
d
I
O
Instrument Specification N
Specification for Modification ICSS - including
control and safeguarding narrative
Instrument Datasheet
A-I-TDS-0002 Datasheet for Pressure Transmitter 1 AEM
A-I-TDS-0003 Datasheet Temperature Transmitter 0 AEM
A-I-TDS-0004 Datasheet for Actuated Choke Valves 0 AEM
A-I-TDS-0006 Datasheet for Pressure Gauge 2 AEM
A-I-TDS-0007 Datasheet for Motor Operated Valve 0 AEM
NO WET GAS FLOWMETER
A-I-TDS-0008 Datasheet for Wet Gas Flowmeter 0 AEM

Instrument List
-6001 ICSS I/O List 1 AEM
0001 Alarm and Trip Setting Lists 1 AEM
0004 Instrument Index 1 AEM
01 Instrument, Fire & Gas Telecom Cable Schedule 2 AEM
Control system Upgrade Vendor information (Honeywell) to be provided for
information by TIMAS
Drawings
01 Instrument Location Plan 0 AEM
04 Instrument Air Supply Layout 1 AEM
001 Process Cause & Effect Matrix 2 AEM
02 Instrument JBs and Cable Layout Routing 0 AEM
05 Instrument Cable Tray - Ladder Layout 0 AEM
03 Instrument Tubing and Tray Routing Layout 0 AEM
01 Fusible Plug Loop and Tubing Tray Layout 1 AEM
04 Instrumentation Process Hook up 3 AEM
00 Instrument Loop Drawing 0 AEM

00 Instrument Control Block Diagram 1 AEM

2 ICSS Marshalling Cabinet Wiring Diagram 1 AEM

03 Instrument Junction Box Wiring Diagram 3 AEM

MTO
A-I-MTO-0001 Instrument MTO 1 AEM

Technical Requistion
A-I-RFQ-0002 RFQ for Pressure Transmitter 0 AEM
A-I-RFQ-0003 RFQ Temperature Transmitter 0 AEM
A-I-RFQ-0004 RFQ for Choke Valves 0 AEM
A-I-RFQ-0005 RFQ for Pressure Gauge 1 AEM
A-I-RFQ-0006 RFQ for Motor Operated Valve 0 AEM

Open 20
No. Document No. Description

BTP3-000-DD-TMS-BTJT-A-I-RFQ-0007 RFQ for Wet Gas Flowmeter

BTP3-000-DD-TMS-BTJT-A-I-RFQ-0010 RFQ for instrument and telecom cable

RFQ SDV, GAS LIFT CONTROL VALVE


TBE
BTP3-000-DD-TMS-BTJT-A-I-TBE-0002 TBE for Pressure Transmitter
BTP3-000-DD-TMS-BTJT-A-I-TBE-0003 TBE Temperature Transmitter
BTP3-000-DD-TMS-BTJT-A-I-TBE-0004 TBE for Choke Valves
BTP3-000-DD-TMS-BTJT-A-I-TBE-0005 TBE for Pressure Gauge
BTP3-000-DD-TMS-BTJT-A-I-TBE-0006 TBE for Motor Operated Valve
BTP3-000-DD-TMS-BTJT-A-I-TBE-0007 TBE for Wet Gas Flowmeter
BTP3-000-DD-TMS-BTJT-A-I-TBE-0010 TBE for Instrument and telecom cable
TBE SDV, GAS LIFT CONTROL VALVE
Instrument Calculation

BTP3-000-DD-TMS-BTJT-A-I-CAL-0002 Thermowell Calculation


CONTROL VALVE CALCULATION
1.7 STRUCTURAL
Analysis

Miscellaneous Calculation (Study And Design For Additional Future Facilities at BTJT-A
BTP3-000-DD-TMS-BTJT-A-S-CAL-0001
Platform)

Inplace Analysis (Study And Design For Additional Future Facilities at BTJT-A
BTP3-000-DD-TMS-BTJT-A-S-ANL-0001
Platform)

Seismic Analysis (Study And Design For Additional Future Facilities at BTJT-A
BTP3-000-DD-TMS-BTJT-A-S-ANL-0002
Platform)

Drawings

11-BTJT-A-S-3109 BTJT-A Platform Deck Extension Main Deck Flooring, Handrail & Layout

11-BTJT-A-S-3110 BTJT-A Platform Deck Extension Mezzanine Deck Flooring, Handrail & Layout
11-BTJT-A-S-3111 BTJT-A Platform Deck Extension Cellar Deck Flooring, Handrail & Layout

Discipline Code : A : Architectural


B : Process
C : Civil
Open 21
Critical
Document No. Description Last Rev. from Synergy

TP3-000-DD-TMS-BTJT-A-I-RFQ-0007 RFQ for Wet Gas Flowmeter 1

TP3-000-DD-TMS-BTJT-A-I-RFQ-0010 RFQ for instrument and telecom cable 1

RFQ SDV, GAS LIFT CONTROL VALVE


TBE
BTP3-000-DD-TMS-BTJT-A-I-TBE-0002 TBE for Pressure Transmitter 1
BTP3-000-DD-TMS-BTJT-A-I-TBE-0003 TBE Temperature Transmitter 0
BTP3-000-DD-TMS-BTJT-A-I-TBE-0004 TBE for Choke Valves 2
BTP3-000-DD-TMS-BTJT-A-I-TBE-0005 TBE for Pressure Gauge 1
BTP3-000-DD-TMS-BTJT-A-I-TBE-0006 TBE for Motor Operated Valve 1
BTP3-000-DD-TMS-BTJT-A-I-TBE-0007 TBE for Wet Gas Flowmeter 1
BTP3-000-DD-TMS-BTJT-A-I-TBE-0010 TBE for Instrument and telecom cable 1
TBE SDV, GAS LIFT CONTROL VALVE
Instrument Calculation

BTP3-000-DD-TMS-BTJT-A-I-CAL-0002 Thermowell Calculation 0


CONTROL VALVE CALCULATION
1.7 STRUCTURAL
Analysis

Miscellaneous Calculation (Study And Design For Additional Future Facilities at BTJT-A
TP3-000-DD-TMS-BTJT-A-S-CAL-0001 1
Platform)

Inplace Analysis (Study And Design For Additional Future Facilities at BTJT-A
TP3-000-DD-TMS-BTJT-A-S-ANL-0001 1
Platform)

Seismic Analysis (Study And Design For Additional Future Facilities at BTJT-A
TP3-000-DD-TMS-BTJT-A-S-ANL-0002 1
Platform)

Drawings

11-BTJT-A-S-3109 BTJT-A Platform Deck Extension Main Deck Flooring, Handrail & Layout 2

11-BTJT-A-S-3110 BTJT-A Platform Deck Extension Mezzanine Deck Flooring, Handrail & Layout 1
11-BTJT-A-S-3111 BTJT-A Platform Deck Extension Cellar Deck Flooring, Handrail & Layout 0

cipline Code : A : Architectural : Architectural


B : Process : Process
C : Civil : Civil
Open 22
Critical
Orginato
ment No. Description Last Rev. from Synergy
/ Scope

MS-BTJT-A-I-RFQ-0007 RFQ for Wet Gas Flowmeter 1

MS-BTJT-A-I-RFQ-0010 RFQ for instrument and telecom cable 1 AEM

RFQ SDV, GAS LIFT CONTROL VALVE


TBE
MS-BTJT-A-I-TBE-0002 TBE for Pressure Transmitter 1 AEM
MS-BTJT-A-I-TBE-0003 TBE Temperature Transmitter 0 AEM
MS-BTJT-A-I-TBE-0004 TBE for Choke Valves 2 AEM
MS-BTJT-A-I-TBE-0005 TBE for Pressure Gauge 1 AEM
MS-BTJT-A-I-TBE-0006 TBE for Motor Operated Valve 1 AEM
MS-BTJT-A-I-TBE-0007 TBE for Wet Gas Flowmeter 1 AEM
MS-BTJT-A-I-TBE-0010 TBE for Instrument and telecom cable 1 AEM
TBE SDV, GAS LIFT CONTROL VALVE
Instrument Calculation

MS-BTJT-A-I-CAL-0002 Thermowell Calculation 0 AEM


CONTROL VALVE CALCULATION
TURAL
Analysis

Miscellaneous Calculation (Study And Design For Additional Future Facilities at BTJT-A
MS-BTJT-A-S-CAL-0001 1 AEM
Platform)

Inplace Analysis (Study And Design For Additional Future Facilities at BTJT-A
MS-BTJT-A-S-ANL-0001 1 AEM
Platform)

Seismic Analysis (Study And Design For Additional Future Facilities at BTJT-A
MS-BTJT-A-S-ANL-0002 1 AEM
Platform)

Drawings

JT-A-S-3109 BTJT-A Platform Deck Extension Main Deck Flooring, Handrail & Layout 2 AEM

JT-A-S-3110 BTJT-A Platform Deck Extension Mezzanine Deck Flooring, Handrail & Layout 1 AEM
JT-A-S-3111 BTJT-A Platform Deck Extension Cellar Deck Flooring, Handrail & Layout 0 AEM

e: A : Architectural : Architectural I : Instru


B : Process : Process K : Layou
C : Civil : Civil L : Planni
Open 23
e
R
n
A
t
D
C
a
T
tS

Critical
Orginator Ot
e
No. Description Last Rev. from Synergy
/ Scope R a
t
R
S
u
e
U
s
c
A-I-RFQ-0007 RFQ for Wet Gas Flowmeter 1 B
e
M
i
A-I-RFQ-0010 RFQ for instrument and telecom cable 1 AEM Iv
S
e
RFQ SDV, GAS LIFT CONTROL VALVE S
d
TBE I
A-I-TBE-0002 TBE for Pressure Transmitter 1 AEM
O
N
A-I-TBE-0003 TBE Temperature Transmitter 0 AEM
A-I-TBE-0004 TBE for Choke Valves 2 AEM
A-I-TBE-0005 TBE for Pressure Gauge 1 AEM
A-I-TBE-0006 TBE for Motor Operated Valve 1 AEM
A-I-TBE-0007 TBE for Wet Gas Flowmeter 1 AEM
A-I-TBE-0010 TBE for Instrument and telecom cable 1 AEM
TBE SDV, GAS LIFT CONTROL VALVE
Instrument Calculation

A-I-CAL-0002 Thermowell Calculation 0 AEM


CONTROL VALVE CALCULATION

Analysis

Miscellaneous Calculation (Study And Design For Additional Future Facilities at BTJT-A
A-S-CAL-0001 1 AEM
Platform)

Inplace Analysis (Study And Design For Additional Future Facilities at BTJT-A
A-S-ANL-0001
Platform)
1 AEM Subje

Seismic Analysis (Study And Design For Additional Future Facilities at BTJT-A
A-S-ANL-0002
Platform)
1 AEM Subje

Drawings

09 BTJT-A Platform Deck Extension Main Deck Flooring, Handrail & Layout 2 AEM

10 BTJT-A Platform Deck Extension Mezzanine Deck Flooring, Handrail & Layout 1 AEM
11 BTJT-A Platform Deck Extension Cellar Deck Flooring, Handrail & Layout 0 AEM

A : Architectural : Architectural I : Instru


B : Process : Process K : Layout
C : Civil : Civil L : Plannin
Open 24
No. Document No. Description

E : Electrical
F : Fire & Gas
G : General / Project Management
H : HVAC

Open 25
Critical
Document No. Description Last Rev. from Synergy

E : Electrical : Electrical
F : Fire & Gas : Fire & Gas
G : General / Project Management
H : HVAC : HVAC

Open 26
Critical
Orginato
ment No. Description Last Rev. from Synergy
/ Scope

E : Electrical : Electrical M : Mecha


F : Fire & Gas : Fire & Gas N : Naval
G : General / Project Management O : Onsho
H : HVAC : HVAC P : Piping

Open 27