You are on page 1of 3
1. Effect of drip irrigation on garlic at farmers’ field ‘Treatments : Application methods : Drip irrigation at 100% EpR [app day] 50 mm water at alternate Area 1500 m* ESTIMATED COST zi Approx. Rate Tost as ; Quantity i 1 - a 7875.00 > 64.00 3 825.00 ro 300.00 |3_| Cost of drip irrigation set [= =a 6 Miscellaneous (Plant . | - 1611.00 protection, sign board.etc) | ~ 1 0.00 2. Demonstration of drip irrigation on onion at farmers’ field Application methods : Drip irrigation at 100% EpR [apply 2.50 mm water at alternate day] 00 m? Area ESTIMATED COST | euaniy | Approx. Rate | Cos 317.00 250.00 | “64125.00 | (mop Cost of drip Miscellaneous ( |_protection, sign board e TOTAL : . | 1502.00 [6700.00 1. Effect of drip irrigation on garlic at farmers’ field ‘Treatments : ition methods : Drip irrigation at 100% EpR [apply 2.50 mm water at alternate Area 1500 m? ESTIMATED COST a Input Quantity eae oe | 1 Seed ke Rs 150/ke 7875.00 2 Urea 33 kg. Rs 8/kg 264.00 3 SSP 75k Rs lke 825.00 4 MOP 15 kg [Rs 20/ke 300.00 3_| Cost of drip irrigation set = = 64125.00 Miscellaneous (Plant protcetion, sign board ete) |” | 7 Oe TOTAL 75,000.00 2. Demonstration of drip irrigation on onion at farmers’ field Application methods : Drip irrigation at 100% EpR [apply 2.50 mm water at alternate day] Area 1500 m? ESTIMATED COST Input Quantity Approx. Rate Seed 13 kg Rs.300/ha Urea [19.5 kg Rs 8ike SSP |—470ke Rs 11ikg [Rs 20/kg Miscellaneous (Plant - - : 02.00 ction, sign board ete) 7 TOTAL | 6700.00 | | Cost of drip irrigation set 7 : T | prot Estimate for Drip Irrigation with Fertigation System Crop : Onion (sp: 0.20x0.10 m2). Area : 1500 sqm, Inline Drip, Dripper discharge 1.6 Iph, ‘Spacing : 0.40 m, Bed to Bed Spacing: 0,50 m, Bed size: 0.60 m SUNa [ems Qe [Unit [Rate Rs. [Amount Rs 1 __ [PVE PIPE SO NADIA X06 KGSO M PRESSURE [om oo) 480600] [DRIP INLINE LATERAL 12MAI1.6 LPHA0CM CL2 Ta] [rooxeTRNC 11.00] 13420.00) 7 [EAKE OFF GROMMET NE MAT |e 3a 238,70 “4 [LATERAL END STOP _ G7 SHAPE TZ MME 770 | 275 192.50) S___|SCREEN FILTER 120HRIS 1 [tos 09 2117 00] “¢—|MANIFOLD GI ow 1s" Tos [325609 3294.00 7 [VENTURY ASSEMBLY COMPLETES 1 {aor 0.0 119000] ‘3 [FLUSIE VALVE So Mt ee rane 31.00} 31.09 ‘9 CONTROL VALVE 0 Sif MOULDED SEAL PLAIN [os | —as0.0} 5000] 10 [ELBOW (QUAL) So MM= HID |e 35.00) 280 00] IMALE THREADED ADAPTER 3 (S0NNQ =D 2s 2c 52.00 12 [EM THR ADP 1.5°(30 MM) HD 2 | moe 300] 76.00 13 [PERMA FIX TH [tis [or 08 60] 14 ]MSEAL Ka [326.0 325.04 15 JHOLD THTE 100 GNIS PAC ie “ck. Er 16 [DRILLING TOOL FOR 11 TAL 1 [oe [211 99 2197] 17 [TEELON TAPE [a arf 3723 Hota Material Cost Rs. mrus.72 ease 575.32 Series Tax 45056] rei ‘5469.14 Tex CSS 23457] [Total for Orip componenets RS. wo375.41 TE |MONORLOCK ELECTRICAL PUMPSET 3 HF [me [32005] 3400.0] 19 [SUCTION HOSE FOR FUMPSET eo] m ‘500 4000 00] 20 FOOT WALNE n 200 "350.00 ‘21 [RLECTRICAL WIRING AND SWITCHBOARD: ts 3000.00 "22 [PLASTIC WATER TANK 101. 1 "36005| 8000 00) 23 JpLUMinm CHARGES is 2000.00 2 [Contngns fr wlan penn pra Sono 3000 06) Grand Total Rs. ear2s.at

You might also like