You are on page 1of 3

Organization Specific Collections

Oracle Advanced Supply Chain Planning supports organization-specific collections, which


helps you in maintaining independent planning processes in independent business units of a company
that is running a single instance of the Oracle e-Business Suite.

You can run collections for collecting data from only specified organizations of a source
instance. This helps you in elimination of unnecessary data collection from organizations that are not
planned in your planning process and reduce the processing time.

Oracle Advanced Supply Chain Planning allows organization-specific collection for:

 Standard collections:
o Complete refresh method
o Net change refresh method
o Targeted refresh method
 Continuous collections

Note: Organization-specific collection is not available for legacy collections.

To setup organization specific collections

1. Select Advanced Planning Administrator responsibility.


2. Navigate to Admin > Instances.

The Application Instances form appears.

3. Define the instance.


4. Click Organizations.

The Organizations form appears.

5. Select the Enable check box for the organizations of the defined instance.
6. Specify Collection Group for the organizations.

Assign all related organizations to the same collection group to ensure that group organizations
are collected together.

To perform organization specific collections


1. Select the Advanced Supply Chain Planner responsibility.
2. Navigate to Collections > Oracle Systems > Standard Collections.
3. The Planning Data Collection form appears.
4. Click the Parameters field for the Planning Data Pull program.
5. The Parameters window appears.
6. Select the Collection Group.
Regardless of the Collection Group value, Oracle Advanced Supply Chain Planning always collects the
following:

 ATP Rules
 Demand Classes
 Trading Partners (Customers)
 Trading Partners (Suppliers)
 Units of Measure
 User Company Association
 Sourcing Rules and Assignment Sets
 Shipping Networks and Shipping Methods

In addition, the collection programs collects all calendars to accommodate all trading partner shipping
and receiving calendars.

Creating Supply Chain Plans

You can have multiple supply chain plans. Before you launch a plan for the first time you must name it.

In addition to creating a plans by creation, you can create a new plan by copying information from one
plan to it. Do this if you want to:

 Save the results of a particular plan run before you re-run the plan
 Begin using a new plan name with the results of the latest run of another plan.
 Create a new plan with the same plan options as an existing plan

To create a global supply chain plan

1. From the Navigator, choose Supply Chain Plan > Names.

The Supply Chain Names window appears.

This table describes the fields and options.

Object Description

Name Define a plan name.

Description Define a plan description.

ATP If this is selected, this plan will be used for availability check. If the plan
is used as a 24 x 7 ATP plan, the planning process may never switch to a
new version of the plan from the copied plan after the original plan has
completed successfully ; consider setting profile options MSC: Action
Allowed on ATP 24 x 7 Plan While Running and MSC: ATP
Synchronization Downtime (minutes).
Production If this is selected, this is a product plan. Planned orders will be
automatically released within their release time fence.

Notifications If this is selected, exception message notifications for the plan are
enabled.

Plan Type Valid values are Manufacturing Plan, Production Plan, and Master Plan.
This setting interacts with the Planning Method item attribute to
determine which subset of the items that pass the condition imposed
by the Planned Items parameter are planned. Please see Choosing a
Plan Type for further details.

2. Save your work.


3. Select Plan Options for the Plan Options window.

Continue setting plan options and parameters.

You might also like