Professional Documents
Culture Documents
You can run collections for collecting data from only specified organizations of a source
instance. This helps you in elimination of unnecessary data collection from organizations that are not
planned in your planning process and reduce the processing time.
Standard collections:
o Complete refresh method
o Net change refresh method
o Targeted refresh method
Continuous collections
5. Select the Enable check box for the organizations of the defined instance.
6. Specify Collection Group for the organizations.
Assign all related organizations to the same collection group to ensure that group organizations
are collected together.
ATP Rules
Demand Classes
Trading Partners (Customers)
Trading Partners (Suppliers)
Units of Measure
User Company Association
Sourcing Rules and Assignment Sets
Shipping Networks and Shipping Methods
In addition, the collection programs collects all calendars to accommodate all trading partner shipping
and receiving calendars.
You can have multiple supply chain plans. Before you launch a plan for the first time you must name it.
In addition to creating a plans by creation, you can create a new plan by copying information from one
plan to it. Do this if you want to:
Save the results of a particular plan run before you re-run the plan
Begin using a new plan name with the results of the latest run of another plan.
Create a new plan with the same plan options as an existing plan
Object Description
ATP If this is selected, this plan will be used for availability check. If the plan
is used as a 24 x 7 ATP plan, the planning process may never switch to a
new version of the plan from the copied plan after the original plan has
completed successfully ; consider setting profile options MSC: Action
Allowed on ATP 24 x 7 Plan While Running and MSC: ATP
Synchronization Downtime (minutes).
Production If this is selected, this is a product plan. Planned orders will be
automatically released within their release time fence.
Notifications If this is selected, exception message notifications for the plan are
enabled.
Plan Type Valid values are Manufacturing Plan, Production Plan, and Master Plan.
This setting interacts with the Planning Method item attribute to
determine which subset of the items that pass the condition imposed
by the Planned Items parameter are planned. Please see Choosing a
Plan Type for further details.