Petroleum Development Oman LLC Effective: May-17
2
Carryout hydrostatic /
pneumatic strength test 3
using a safe medium
SOUR
Sour or Sweet Service?
SWEET/NON
4 HAZARDOUS 7
High Sour Low Sour
NO
Can Maximum Operating Is the Reinstatement on High
Pressure be achieved for the Sour and above
Test? 8
YES NO
Will the Reinstatement be using
Inservice Leak Testing?
6
Prepare Variance
supported by a Risk
Assessment NO
Contact Specialist N2/He
Testing Contract Will N2 testing be carried out by
Company PDO Operations/EMC?
10
YES
11 11
Leak Testing
Completed
Page 14 PR-1073 - Gas-Freeing, Purging and Leak Testing Process Printed 18/10/17
Equipment and Pipework