Checklist For PMGSY III - DPR Checking: Conti . - 2
Checklist For PMGSY III - DPR Checking: Conti . - 2
3. CD Details :-
(a) Nos of existing CDs
(b) Condition of existing CDs
(c) Photographs attached of existing CDs (both U/S & D/S Yes/No
Side)
(d) Are New CD required and proposed (List may be
attached)
Nos of required New CD, if yes, location at -
Chainage………………
Size……………………
Type…………………..
(e) Are any modification, protection work or additional Yes/No/Not Required
work on existing CD required (List may be attached)
Conti….
----2---
District ……………………Block……….……….. Name of
Road……………………………………..
S. Items Description/fill up Remarks
No. appropriate related
information
(b) Length of CC pavement
New proposed ……………km
Existing……………………km Rigid pavement of
Total……………………….km M30 CC…….mm
CC pavement in habitation area along with paved Yes/No/Not GSB …..……mm
width………….m
shoulder & side drain provided Required
(d) Total of a+b ……….km
6. Is 3% additional quantity for G-2, G-3, BT, CC taken for extra Yes/No
width.
7. Junction with main Road (T Junction) Yes/No/Not Required
(a) Flared Junction has been developed at Start Point
(e) Any accident prone/black spot is found like blind and sharp Yes/No
curves open well without parapet wall just side of the road,
electric pole/ hand pump/tree at road way, CD without wheel
guard, steep gradient etc.
If yes, location and type …………
Kind of mitigation measured proposed (like speed limit board,
parapet, guard stones, painting on obstruction like tree, pole etc.,
raising/shifting electric line. )……give note on it
Conti….
----3---
District ……………………Block……….……….. Name of
Road……………………………………..
S. Items Description/fill up Remarks
No. appropriate related
information
10. Is private land required Yes/No/Not Required
(a) Land owner willing to donate land
(b) If “yes” MOU from private land owner for voluntary donation Yes/No
obtained in prescribed format.
11. Is ECOP (Environment Checklist (IEE) format and Road specific Yes/No
EMP filled up)
12. Is on the way kaccha road Junction with side roads developed for Yes/No/Not Required
5-6 m by earthen ramp in proper gradient and pipes for drain
crossing provided
13. Is road passes through forest
(a) If ‘Yes’ forest land width available in forest area……...m Yes/No
(b) Forest permission obtained. Yes/No/Not Required
(c) Is road passes through wild life/sanctuary/National park/other Yes/No/Not Required
sensitive area
14. Is irrigation crossing pipes (CC Hume pipe) provided at 200 m C/C Yes/No/Not Required
at agriculture area.
15. (a) Is Transect walk done Yes/No
(b) Female representative involved
16. Is community consultation done and social screen format filled up. Yes/No Female representative from
village to be included in
consultation compulsorily
17. Suggestions given by community incorporated in design if yes then
give description
18. Photographs (taken and attached)
Yes/No
@ 100 meter
Transect walk Yes/No
Existing CD Yes/No
New CD location Yes/No/Not Required
19. Is Transect Walk strip plan prepared which capturing features 10 m Yes/No
both side of centre line showing on strip plan MAP and attached
duly signed.
20. Is Road Safety Audit done/ Road Safety Checklist duly filled up. Yes/No
21. Is design brief duly filled up. Yes/No
22 Is permanent BM & TBM marked at site and shown on drawing. Yes/No
23. Is L – Section and cross section attached Yes/No
24. Is below Social COMMUNITY PARTICIPATION
FRAMEWORK report format annexure (CPF document)
1 to 6 filled up
(a) Format annexure 1 TO 6 (CPF document) Yes/No
Conti….
----4---
District ……………………Block……….……….. Name of
Road……………………………………..
Note :