You are on page 1of 1

CORRECTION MAINTENANCE DONE ON JANUARY

1. DATE: 15 JAN 2019

ERROR: UNABLE TO MOVE BAR NO 5

ACTION: RE-CONFIGURED MTT TABLE BAR 5 SPM INTO DEFAULT MTT TABLE

2. DATE: 19 JAN 2019


ERROR: UNABLE TO MOVE BAR NO 5
ACTION: EXCLUDE RELATED DRIVE WHICH IS PATCHING CANNOT BE DONE

3. DATE: 29 JAN 2019


ERROR: OVERSTAGE SYSTEM NO POWER
ACTION: REBOOT OVERSTAGE RACK IN ORDER TO ALLOW COMMUNICATION BETWEEN SYSCON
AND WINCON

4. DATE: 29 JAN 2019


ERROR: UNABLE TO MOVE BAR HOIST
ACTION: REFRESH PATCHING BETWEEN Q MODULE AND P MODULE

5. DATE: 29 JAN 2019


ERROR: FAILURE ON POINT HOIST SYSTEM
ACTION: RESET BNC REPEATER TO ALLOW PATCHING AND POLLING

6. DATE: 29 JAN 2019


ERROR: UNABLE TO MOVE POINT HOIST
ACTION: RECONFIGURED MTT TABLE AS DEFAULT

You might also like