You are on page 1of 1
G seerecey | CONSTRUCTION COMPLETION ] . . | CERTIFICATE ‘Sumitomo Corporation 2 ~ MUARA LABOH GEOTHERMAL POWER PROJECT | > STAGE 1 DEVELOPMENT EPC CONTRACT ‘[ ost [ rac System No, ‘080 ‘Sub System No. | 080-01 ‘Sub System Description | Two-Phase System - HP Wellpad ML-A Certificate No. (CCC-080-01-1 a : this sub-system discipine will be under the contol of the Commissioning group. “This certificate acknowledges that, except as set forth below, all work for this sub-system discipline is constructed and complete as of the above date and the package is ready to begin pre-commissioning actives. Upon acceptance and sign-off ofthis certificate, No. Hold Point ‘Check 1. | Installed as per the atest design Drawings and Specification documents. = 2. | Confirm / Verity all NCRs for this sub system are fully implemented and completed. eV 3 | Alcomponents comprising iis discipine, sub-system, or stem have been erected or assembled in ul v accordance with design and vendor drawings. 4 | all necessary factory acceptance testing has been completed and documented. 4 5 | This certificate is accompanied by all documentation as agreed upon for this project v 6 | Handover Work Certificate are complete. VY 7. | AIL“A" punch lst tems are complete. 2 8 | All eemaining punch lst items have been categorized and entered into the Database. a 9. | Boundary Drawings attached v ‘Summary of remaining lems to be completed as follows: Tite Construction Quality Control | Pre-Commissioning Owner Designee Designee. Designee Designee. Field Inspector | Lead Engineer a i Tpninene | OWT ' we sort r Bate & Sigh An won| 4 os 4 Note: Endorsement to be carried out and signed on completion of the contractor, Owner, and Vendor (any) walk down, CCC Rev. 0 Pi/t

You might also like