| CONSTRUCTION COMPLETION ] . .
| CERTIFICATE ‘Sumitomo Corporation 2
~
MUARA LABOH GEOTHERMAL POWER PROJECT | >
STAGE 1 DEVELOPMENT EPC CONTRACT
‘[ ost [ rac
System No, ‘080 ‘Sub System No. | 080-01
‘Sub System Description | Two-Phase System - HP Wellpad ML-A
Certificate No. (CCC-080-01-1 a :
this sub-system discipine will be under the contol of the Commissioning group.
“This certificate acknowledges that, except as set forth below, all work for this sub-system discipline is constructed and complete as
of the above date and the package is ready to begin pre-commissioning actives. Upon acceptance and sign-off ofthis certificate,
No. Hold Point ‘Check
1. | Installed as per the atest design Drawings and Specification documents. =
2. | Confirm / Verity all NCRs for this sub system are fully implemented and completed. eV
3 | Alcomponents comprising iis discipine, sub-system, or stem have been erected or assembled in ul v
accordance with design and vendor drawings.
4 | all necessary factory acceptance testing has been completed and documented. 4
5 | This certificate is accompanied by all documentation as agreed upon for this project v
6 | Handover Work Certificate are complete. VY
7. | AIL“A" punch lst tems are complete. 2
8 | All eemaining punch lst items have been categorized and entered into the Database. a
9. | Boundary Drawings attached v
‘Summary of remaining lems to be completed as follows:
Tite Construction Quality Control | Pre-Commissioning Owner Designee
Designee. Designee Designee. Field Inspector | Lead Engineer
a i
Tpninene | OWT ' we sort r
Bate & Sigh An won| 4 os 4
Note: Endorsement to be carried out and signed on completion of the contractor, Owner, and Vendor (any) walk down,
CCC Rev. 0
Pi/t