You are on page 1of 5
Emergency Hook Release Operation ( On-Load Release) operation failed. This operation shall be carried out only when normal radar A Attention ‘The following items must be confirmed before operation: + There is not be entangled in rope at fore-and-aft hooks. Remote line of lifeboat for launching is already outside the boat. + The engine has been started normally. + All seating crews have tied safety belt. Caution To follow the commander's instruction, and carry out operation after ensuring safety. + The operation can be carried out until ensuring safety fully, otherwise, it may cause the fall of boat and serious disaster accident. ‘When emergency release hooks, please obey following steps. No. | __ Operation steps Figure © | Destroy the protective cover by safety hatchet. 42 Lift stop lever C to up according to the arrow | += direction, open the hydrostatic lock by hand. + @ | Pull out safety pin 2 @ ‘Tum safety pin handle B about 90° anticlockwise © Pull out safety pin 1 | Tum release handle A about 90° anticlockwise powerfully and rapidly, do not operate slowly. otherwise it may cause life danger. Normal Release Operation (Off-Load Release) This operation shall be carried out when the lifeboat is, fully waterborne. Caution” + To follow the commander's instruction, and carry out operation after ensuring safety. + The operation can be carried out until ensuring safety fully, otherwise, it may cause the fall of boat and serious disaster accident. Attention A Following items must be confirmed before operation: There is not entangled in rope at fore-and-aft hooks. Lifeboat is fully waterborne . Remote line of lifeboat for launching is already outside the boat. Engine has been started normally. + All seating crew have tied safety belt. Off-load hos ‘ok release, please obey following steps. No. operation steps figure 1 | Confirm Stop lever C have been disengaged. ‘Stop lever C Say pi ee Tee be & 2. | Pull out safety pin 2 Sey jn a i ne © say 4 3. | tum Safety pin handle B about 90° anticlockwise sey hd soe 4 | Pullout safety pin 1 ‘ 5 | Tum Rely onde A Release handle A about 90° anticlockwise No. Operation Figure Confirm hooks have been locked ‘operators of fore and aft shall confirm following items when releasing operators give an order of confirmation of hook locked or not. ~ Pull and push hooks by hand to confirm hooks locked or not, ~ Arrows on hook of fore and aft have pointed at slot on lifing plate by vision. Arrow on pull rod have pointed at locking mark ~ After confirmation of locking, report release operators that hooks have been locked. ‘Tum back safety pin handle B clockwise to 6 | locking position,then insert safety pin 2 7 | Lifting ring is be put into hook center by personnel of fore and aft. | Lifeboat is lifted out of water according to commander's order WTR A IIMA! | bh tof f f 5 9. | Confirm stop lever C has been restored fully and under the condition of locking condition.If not OK, the handle did not reach locking position and hooks are not reset. Restart procedure from step 1 Ae Lifeboat can be recovered after above steps are finished. Please carry out operation principle of three persons when restoring released hooks. Following steps must be obeyed when restoring released hooks. Under the condition of incomplete restoring, operation of VW restoring must be carried out again from start. + Under the condition of incomplete restoring, recovering of Caution lifeboat can bring serious disaster accident or falling of lifeboat. + Lifting ring is fully put into hook center until complete restoring. It is very dangerous to cause incomplete restoring during, restoring. + Under the condition of severe weather, using special recovery device will replace special lifting ring below the recovery device of ordinary lifting ring and be put into hook. Please refer to instruction manual of davit. No. Operation steps Tum back release handle A about30° clockwise,operator can adjust backwards and forwards handle according to 1 | action of operators at fore and aft until hooks can be restored. Operator restore the hooks simultaneously 3, | Turn back release handle A clockwise to locking position Insert safety pin 1, if the safety pin can not be inserted, the handle did not reach locking position and hooks are not reset. Restart procedure from step 1. y Restoring of hooks: confirmation of reset before lifting the lifeboat ts + To follow the commander's instruction, and carry out operation after ensuring safety. + The operation can be carried out until ensuring safety fully, otherwise, itmay cause the fall of boat and s« s disaster Caution accident. No. Operation 1 Indication on both hooks: Indication on both hooks: at (pated gee) ot 2 —_ Vy : ln i om TT | i gewteeree | ll Ih ee Salty pn hard 8, 1 h ad Indication of control device: peeinie) 45 _| the release handle A, safety = ley pit | pin handle B all have been reset, safety pin I and safety Safely i 2 pin can insert the correct i nosition: Caution + Ifone of indication is nor align, the mechanism will not operation. + The operation can be carried out until ensuring safety fully, ensuring safety otherwise, it may cause the fall of boat and serious disaster accident.

You might also like