Professional Documents
Culture Documents
com
7
6:0
[5254]-502
3:5
B. E. (Civil)
71
1/2 1
TRANSPORTATION ENGINEERING
9
01
8 3 30
(2012 Pattern) (Semester - I)
.23 01
Time : 2½ Hours] 0/1 [Max. Marks : 70
P
1) Answer Q.1 or Q.2, Q.3 or Q.4 and Q.5 or Q.6, Q.7 or Q8, Q.9 or Q.10.
16
7
6:0
4) Use of logarithmic tables, slide rule, Mollies charts, electronics pocket
49
3:5
5) Assume suitable data if necessary.
71
91
6) Neat diagrams must be drawn wherever necessary.
01
30
1/2
01
Q1) a) State comparison between Nagpur road plan and Bombay Road plan.[5]
0/1
GP
OR
.23
CE
6:0
b) Define Unevenness Index. Explain in brief how it is measured [5]
49
3:5
71
91
Q3) a) Design the superelevation required for a road curve of 240 m radius with
mixed traffic conditions. The design speed is 80 Kmph. The coefficient
01
30
OR
83
.23
Q4) a) Draw a neat cross section of flexible pavement. Explain in brief functions
CE
b) The CBR value of the subgrade is 6 percent. Calculate the total thickness
of pavement using design formula developed by U.S. Corps of Engineers.
.24
P.T.O.
www.sppuonline.com
sppuonline.com
Q5) a) Draw a neat sketch showing the component parts of aeroplane. [6]
b) Write a note on Basic Runway length and Orientation of Runway.[3+3=6]
7
c) How is the minimum turning radius is decided [4]
6:0
OR
3:5
71
1/2 1
Q6) a) How can the plotting of wind rose diagram can be done [6]
9
01
8 3 30
b) Explain in brief the following :
.23 01 [2×3=6]
i) Holding Apron
0/1
P
ii) Tricycle undercarriage
8.2 G
c) What are the factors which influence the location of an airport. [4]
7
6:0
49
3:5
Q7) a) Explain in brief the following : [6]
71
91
i) Submersible Bridge ii) Class B Bridge
01
30
6:0
3:5
OR
71
91
01
Q8) a) Calculate the peak runoff for designing a bridge across a stream, given
30
1/2
rain in 2.5 hours ;Type of catchment = Loamy soil largely cultivated. [6]
GP
83
.23
b) How would you estimate the maximum scour depth for any bridge pier.[6]
CE
16
[5254]-502 2
www.sppuonline.com
sppuonline.com
Q9) a) How will you account for the following in the design of highway
bridge: [2 × 3 = 6]
7
6:0
i) Dead Load
3:5
ii) Earth pressure
71
1/2 1
9
01
iii) Erection stresses
b) 8 3 30
What do you understand by fixed span bridges? Explain any two types
.23 01
0/1
of fixed span bridges with the help of neat sketch [2 + 2 + 2 = 6]
8.2 G
P
7
OR
6:0
49
3:5
71
91
i) Pile Bent Pier ii) Splayed wing Wall
01
30
GGG 7
.24
6:0
49
3:5
71
91
01
30
1/2
01
0/1
GP
83
.23
CE
16
8.2
.24
49
[5254]-502 3
www.sppuonline.com