You are on page 1of 3

sppuonline.

com

Total No. of Questions : 10] SEAT No. :

P2111 [Total No. of Pages : 3

7
6:0
[5254]-502

3:5
B. E. (Civil)

71
1/2 1
TRANSPORTATION ENGINEERING

9
01
8 3 30
(2012 Pattern) (Semester - I)
.23 01
Time : 2½ Hours] 0/1 [Max. Marks : 70
P

Instructions to the candidates:


8.2 G
.24 CE

1) Answer Q.1 or Q.2, Q.3 or Q.4 and Q.5 or Q.6, Q.7 or Q8, Q.9 or Q.10.
16

2) Answer to the two sections should be written in separate books.


3) Figures to the right indicate full marks.

7
6:0
4) Use of logarithmic tables, slide rule, Mollies charts, electronics pocket
49

calculator and steam tables is allowed.

3:5
5) Assume suitable data if necessary.
71
91
6) Neat diagrams must be drawn wherever necessary.
01
30
1/2
01

Q1) a) State comparison between Nagpur road plan and Bombay Road plan.[5]
0/1
GP

b) Explain in brief the factors controlling an highway alignment. [5]


83

OR
.23
CE

Q2) a) Explain in brief the following : [5]


16
8.2

i) PCU ii) O and D Survey


7
.24

6:0
b) Define Unevenness Index. Explain in brief how it is measured [5]
49

3:5
71
91

Q3) a) Design the superelevation required for a road curve of 240 m radius with
mixed traffic conditions. The design speed is 80 Kmph. The coefficient
01
30

of friction is 0.15. The road is passing through rolling terrain. [5]


1/2
01

b) Write a short note on Marshall Stability Test [5]


0/1
GP

OR
83
.23

Q4) a) Draw a neat cross section of flexible pavement. Explain in brief functions
CE

of various layers of flexible pavement [5]


16
8.2

b) The CBR value of the subgrade is 6 percent. Calculate the total thickness
of pavement using design formula developed by U.S. Corps of Engineers.
.24

Assume wheel load = 4082 Kg. Tyre pressure = 7 Kg/cm2. [5]


49

P.T.O.

www.sppuonline.com
sppuonline.com

Q5) a) Draw a neat sketch showing the component parts of aeroplane. [6]
b) Write a note on Basic Runway length and Orientation of Runway.[3+3=6]

7
c) How is the minimum turning radius is decided [4]

6:0
OR

3:5
71
1/2 1
Q6) a) How can the plotting of wind rose diagram can be done [6]

9
01
8 3 30
b) Explain in brief the following :
.23 01 [2×3=6]
i) Holding Apron
0/1
P
ii) Tricycle undercarriage
8.2 G

iii) Instrument runway


.24 CE
16

c) What are the factors which influence the location of an airport. [4]

7
6:0
49

3:5
Q7) a) Explain in brief the following : [6]
71
91
i) Submersible Bridge ii) Class B Bridge
01
30

iii) Skew Bridges iv) Through Bridges


1/2
01

b) What is Afflux? How it is estimated. [6]


0/1
GP
83

c) Explain in brief the significance of following terms in bridge design:


[2 + 2 + 2 = 6]
.23
CE
16

i) Clearance above HFL


8.2

ii) Size of opening 7


.24

6:0

iii) Fixing waterway


49

3:5

OR
71
91
01

Q8) a) Calculate the peak runoff for designing a bridge across a stream, given
30
1/2

Catchment Length = 6 Km; H= 25 m; Area of catchment(A) = 10 sq km;


01

Runoff coefficient = 0.285; The severest storm in 20 years dropped 15cm


0/1

rain in 2.5 hours ;Type of catchment = Loamy soil largely cultivated. [6]
GP
83
.23

b) How would you estimate the maximum scour depth for any bridge pier.[6]
CE
16

c) Write a short note on determination of velocity of stream by Surface


8.2

Float method. [6]


.24
49

[5254]-502 2

www.sppuonline.com
sppuonline.com

Q9) a) How will you account for the following in the design of highway
bridge: [2 × 3 = 6]

7
6:0
i) Dead Load

3:5
ii) Earth pressure

71
1/2 1
9
01
iii) Erection stresses

b) 8 3 30
What do you understand by fixed span bridges? Explain any two types
.23 01
0/1
of fixed span bridges with the help of neat sketch [2 + 2 + 2 = 6]
8.2 G
P

c) Discuss in brief the following : [2 + 2 = 4]


.24 CE
16

i) Causeway ii) Pontoon Bridges

7
OR

6:0
49

Q10)a) Explain with a neat sketch the following: [3 + 3 = 6]

3:5
71
91
i) Pile Bent Pier ii) Splayed wing Wall
01
30

b) State merits and demerits of Continuous Bridges. [6]


1/2
01
0/1

c) Write a note on maintenance and preservation of Steel bridges. [4]


GP
83
.23
CE
16
8.2

GGG 7
.24

6:0
49

3:5
71
91
01
30
1/2
01
0/1
GP
83
.23
CE
16
8.2
.24
49

[5254]-502 3

www.sppuonline.com

You might also like