NAME OF CONTRACTOR :________ ___________ DATE ASSEMBLED : _______________
ALLOTMENT :___________________ TIME ASSEMBLED :________________ BLOCK/LOT :___________________
PROCEDURES S.S Q.E. REMARKS
ERECTION 1. SQUARENESS OF G/F SLAB 2. CLEANING/ REMOVAL OF CONSTRUCTION WASTES AT SLAB FOOTING PERIMETER PRIOR TO ASSEMBLY 3. ALIGNMENT OF PANELS 4. SQUARENESS AND DIMENSION OF UNIT 7. WELDING CONNECTIONS (2” LONG FULLY WELDED AT ONE SIDE ONLY)