SUB TRAMO I

PROGRESIVA 2.PROFUNDIDAD 1.CBR 95% 3.ESPESOR DEL 6.ALTURA 7.CBR MEJ*H


(Km) (m) ESTIMADO
4.CBR*D (%) 5.CBR MEJ 95%
ESTRATO D (m) MEJORADA (m) MEJ

0+000 0.50 23.00 0.50 11.50


0+000 0.60 5.10 0.60 3.06
0+000 0.40 15.00 0.40 6.00
0+250 0.40 18.00 0.40 7.20 20.00 0.40 8.00
0+250 0.50 3.00 0.50 1.50 20.00 0.50 10.00
0+500 1.50 5.00 1.50 7.50 20.00 0.30 6.00
0+750 1.50 7.40 1.50 11.10
1+000 1.50 23.00 1.50 34.50
1+250 1.10 5.00 1.10 5.50 20.00 0.30 6.00
1+250 0.40 5.00 0.40 2.00
1+500 0.70 5.00 0.70 3.50 20.00 0.50 10.00
1+500 0.80 5.00 0.80 4.00
1+750 1.50 22.20 1.50 33.30 20.00 0.50 10.00
2+000 1.00 5.00 1.00 5.00 20.00 0.30 6.00
2+000 0.50 5.00 0.50 2.50
2+250 0.90 3.00 0.90 2.70 20.00 0.90 18.00
2+250 0.60 5.00 0.60 3.00
2+500 1.45 3.00 1.45 4.35 20.00 0.90 18.00
2+750 1.45 4.00 1.45 5.80 20.00 0.40 8.00
3+000 1.40 3.00 1.40 4.20 20.00 0.90 18.00
3+000 0.10 5.00 0.10 0.50
3+250 1.50 4.00 1.50 6.00 20.00 0.90 18.00
3+500 1.45 5.00 1.45 7.25 20.00 0.30 6.00
3+750 0.25 18.00 0.25 4.50 20.00 0.25 5.00
3+750 1.25 5.00 1.25 6.25 20.00 0.05 1.00
4+000 1.20 5.00 1.20 6.00 20.00 0.30 6.00
4+000 0.30 5.00 0.30 1.50
4+250 1.40 3.10 1.40 4.34 20.00 0.90 18.00
4+250 0.10 5.00 0.10 0.50
4+500 1.40 5.00 1.40 7.00 20.00 0.30 6.00
4+500 0.20 5.00 0.20 1.00
4+750 1.50 5.00 1.50 7.50 20.00 0.30 6.00
5+000 1.10 5.00 1.10 5.50 20.00 0.30 6.00
5+000 0.40 5.00 0.40 2.00
5+250 1.50 5.00 1.50 7.50 20.00 0.30 6.00
5+500 1.45 5.00 1.45 7.25 20.00 0.70 14.00
5+750 1.50 5.20 1.50 7.80
6+000 1.45 8.00 1.45 11.60
6+250 1.10 18.00 1.10 19.80
6+250 0.40 8.00 0.40 3.20
6+500 1.50 3.00 1.50 4.50 20.00 0.90 18.00
6+750 1.50 5.00 1.50 7.50 20.00 0.30 6.00
7+000 1.50 5.00 1.50 7.50 20.00 0.30 6.00
7+250 1.45 5.00 1.45 7.25 20.00 0.30 6.00
7+500 1.45 4.00 1.45 5.80 20.00 0.90 18.00
7+750 1.50 3.00 1.50 4.50 20.00 0.90 18.00
8+000 1.45 3.60 1.45 5.22 20.00 0.90 18.00
8+250 1.00 23.00 1.00 23.00 0.00
8+250 0.40 3.00 0.40 1.20
8+500 1.50 5.00 1.50 7.50 20.00 0.30 6.00
8+750 1.50 7.40 1.50 11.10
9+000 0.80 7.40 0.80 5.92
9+000 0.70 5.00 0.70 3.50
9+250 1.50 7.40 1.50 11.10
9+500 0.60 7.40 0.60 4.44
9+500 0.90 6.00 0.90 5.40
9+750 1.50 5.00 1.20 6.00 20.00 0.30 6.00
8. SUMATORIA DE CBR = 404.2 9. SUMATORIA DE CBR MEJ= 620

10.SUMATORIA DE CBR*D= 396.630


11.SUMATORIA CBR MEJ *HMEJ= 312.000 CBR PONDERADO 9.537
12.CANTIDAD DE CBR= 57.000 CBR PROMEDIO 11.639
13.CANTIDAD DE CBR MEJ= 31.000
14.SUMATORIA D*HMEJ= 58.700
15.SUMATORIA HMEJ= 15.600

DIFERENCIAS CALCULADA Y LOS VALORES CALCULADOS EN EL


DATOS OBTENIDOS DEL PROYECTO PARA PODER CALCULAR NUESTRO CBR:
PROYECTO:
PROYECTO CALCULADO PROYECTO
10.SUMATORIA DE CBR*D= 1486.280 1089.65 404.20 1502.40
11.SUMATORIA CBR MEJ *HMEJ= 460.000 148.00 620.00 840.00
12.CANTIDAD DE CBR= 147.000 90.00
13.CANTIDAD DE CBR MEJ= 42.000 11.00 1098.20 220.00
14.SUMATORIA D*HMEJ= 136.450 77.75
15.SUMATORIA HMEJ= 23.000 7.40

RESULTADO FINAL DEL CBR PARA EL DISEÑO:

CBR PONDERADO 14.53


CBR PROMEDIO 13
TRAMO II NUEVO NUEVO
PROGRESIVAS
PROFUDINDAD (D) CBR 95% CBR 95% X D SUMATORIA DE CBR 95% * D SUMATORIA DE (D)
(Km)
26+250 0.35 30.00 10.50 419.51 23.50
26+250 1.15 30.00 34.50
26+500 1.10 14.00 15.40
26+500 0.4 14.00 5.60
26+750 1.5 7.40 11.10
27+000 1.5 30.00 45.00
27+250 1.5 14.70 22.05
27+500 0.5 30.00 15.00
27+500 1.0 18.00 18.00
27+750 0.35 30.00 10.50
27+750 0.65 14.70 9.56
28+000 1.50 18.00 27.00
28+250 1.50 8.00 12.00

28+500 1.50 14.70 22.05 CBR PROMEDIO 17.85 %


SUB TRAMO
1.50 8.00 12.00 CBR PONDERADO 18.00% II
28+750
29+000 1.50 12.00 18.00

29+250 1.50 12.00 18.00 CBR PROMEDIO 14.53%


SUB TRAMO I
1.50 35.10 52.65 CBR PONDERADO 13.05 %
29+500
29+750 1.50 30.00 45.00
30+000 0.90 8.00 7.20
30+000 0.60 14.00 8.40

CALCULO DEL MODULO RESILIENTE (MR)

TRAMO DE DISEÑO SUB TRAMO I SUB TRAMO II


Mr (Psi) 13192.12 16246.71