You are on page 1of 17

+ SBEA3413 Architectural

Management & Practice

BOMBA SUBMISSION
- compliance to UBBL
By Ar. NORSHAHIDA AZILI
Senior Lecturer
Department of Architecture
Faculty of Built Environment
+ WHY DO WE NEED TO SUBMIT TO BOMBA?
n  TO COMPLY TO UBBL 245(2) to OBTAIN JBPM DIRECTOR’S
GENERAL APPROVAL

n  TO COMPLY TO SDBA 70 FOR OTHER AUTHORITY


REQUIREMENT IN OBTAINING BUILDING APPROVAL

n  TO COMPLY TO SDBA SEC 133 BY LAWS

n  TO COMPLY TO FIRE SERVICE ACT


+ WHAT ARE THE TECHNICAL GUIDELINE TO
FOLLOW?

BOMBA
GUIDELINES:
OSC & CCC

Local Authorities
(LA)
Requirement
+ BOMBA GUIDELINES: OSC & CCC PROCEDURES
1.  THE PROCEDURE FOR CERTIFICATION
q  Architectural Plan
q  Mechanical & Electrical Plan
q  Application of waiver
q  Stage Certification

2.  CLASSIFICATION OF PLAN


a)  Ibu Pejabat Jabatan Bomba & Penyelamat Malaysia
b)  Ibu Pejabat Jabatan Bomba & Penyelamat Negeri
c)  Balai Bomba Zon / Daerah

3.  FIRE SAFETY DESIGN PHILOSOPHY (FSDP)


By Law 236 (UBBL 1984) Special Hazards
Places constituting special hazards or risk due to the nature of storage,
trade, occupancy or size shall be required to be protected by fixed
installation, protective devices, systems and special extinguishers as
may be required by the Fire Authority.
&
10th Schedule_UBBL 1984_PG VI (2) High Hazard Factory

4.  PERFORMANCE BASED CODES


+ TYPES OF APPLICATION
BOMBA APPLICATION

Standard submission Fire safety design philosophy


Performance base approach (PBA) (FSDP)

Example
Building covered under a) Any building under 5th sche. Extension UBBL 236
schedule 5 UBBL b) Tall and large building for special hazards
areas cannot be covered under
UBBL
c) Mega and special structure
which cannot be covered under Example
Example UBBL
Building purpose group 1-8 a) High Risk Building
Not allowed
b) Industrial High Risk
a)  Bulk storage building
c) Chemical/petrochemical
b)  Process building Flamable
Requirement Dangerous chemical Explosive d) Energy generated
As set in part VI and VII and toxic e)  Not in UBBL 5th schedule
schedule 5,6,7,8,9,10 Submit f) Special/ Unique building
c) Cheap design building
by PSP & SP

Requirement
Document prepared by Fire Requirement
Document prepared by Fire safety
safety engineer and submitted
engineer, Mechanical
together by PSP/SP
engineer ,Chemical engineer and
follow British standard and submitted together by PSP/SP
International fire engineer
guidelines & etc
+ WHO TO SUBMIT TO?
Ibu pejabat Bomba & Ibu pejabat Bomba & Balai bomba zon &
penyelamat Malaysia penyelamat negeri Balai bomba daerah
i.  Acknowledge as i.  Any project under i.  Any project under
Mega project jurisdiction of schedule 5 UBBL
Malaysia JBPM ii.  Apartment/ flats
ii.  Project which
ii.  Special project lower then 5 units
conforms to 3
criteria identified by state iii.  Office or shop
•  Area more then 1 JBPM houses less then 4
million meter square iii.  Project not in the storey
•  Higher then capacity of Local iv.  Factory 1 storey
150meter Bomba not more then 750
•  Mix development iv.  Project using PBA sqm
with 3 different 2 storey and v.  Small Assembly
purpose group
below area not using fix
iii.  Project involving
hazardous process installation system
iv.  Special structure vi.  Any project which
project such as KL does not use fix
tower, tunnel installation system
v.  Performance based
approach
+ WHY THE BOMBA REQUIREMENT NEEDED?
+ WHAT TO SUBMIT?
+ SUBMISSION NEEDS
+ SUBMISSION NEEDS
+ SUBMISSION NEEDS
+
+ CHECKLIST 1: TESTING & COMMISSIONING (T&C)
+ CHECKLIST 2 : T&C CHARGES
+ TESTING AND COMMISSIONING PAYMENT
+ RELEASE LETTER
+