SUMMARY.
ee
(MAST ceeoir nouRs
30%
25%
FIELD OF PRACTICE
ARCHITECTURALDESIGNING/DRAFTING STRUCTURALCONCEPTUALIZATION,|
PLANNING & THE LIKE
PREPARATION OF CONTRACT DOCUMENTS, SPECIFICATION WRITING, BILL OF
MATERIALS, COST ESTIMATES, GENERAL CONDITIONS, SIDDINGDOCUMENTS|
CLERK OF WORKS AND THE LIKE
FIELD SUPERINTEDENCE, PROJECT MANAGEMENT ADMINISTRATION & THE
ae 15% 576
TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITYSTUDIES, PROJECT
PROMOTIONAL, PRE-DESIGNA THE UKES
"ARCHITECTURAL LAY-OUTING OF MECHANICAL ELECTRICAL, ELECTRONIC,
SANITARY, PLUMBING, COMMUNICATIONSAND OTHERUTILITY SYSTEMS,
EQUIPMENT AND FIXTURES ARCH'LLIGTHING, ACOUSTICS AND ALLIED FIELD
OF PRACTICE
|ABCHITECTURAL INTERIORS/SPACE PLANNING, RESTORATION/P RESERVATION
AND OTHER ANCILLARY SERVICES
10%
TOTAL
Corresponding Number of hours of
Training (FOP)
8 c o E
PROJECT TITLE/DESCRIPTION & LOCATION
Project ttle: Ms, XX Residence
Location: Pacac Pampanga
‘Conducted ar. Pragremming and feasibaity
Schematic Design preparation
Consultation and presentation to client 36
Preparation of drawings fo
building permit
‘acchitectural Interior space planning
Preparation of estimates, specications and materials
Meeting with dient and pra)
32
ect approval
‘aplication for building pee
‘Ste Supenicion 380
Preparation of Architectural shop di
Consultation mecting with cat 32
‘application for occupancy
‘architectural interior detaling | 2
Final cost analysis ofthe project
TOTAL NO OF HOURS|