You are on page 1of 1
SUMMARY. ee (MAST ceeoir nouRs 30% 25% FIELD OF PRACTICE ARCHITECTURALDESIGNING/DRAFTING STRUCTURALCONCEPTUALIZATION,| PLANNING & THE LIKE PREPARATION OF CONTRACT DOCUMENTS, SPECIFICATION WRITING, BILL OF MATERIALS, COST ESTIMATES, GENERAL CONDITIONS, SIDDINGDOCUMENTS| CLERK OF WORKS AND THE LIKE FIELD SUPERINTEDENCE, PROJECT MANAGEMENT ADMINISTRATION & THE ae 15% 576 TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITYSTUDIES, PROJECT PROMOTIONAL, PRE-DESIGNA THE UKES "ARCHITECTURAL LAY-OUTING OF MECHANICAL ELECTRICAL, ELECTRONIC, SANITARY, PLUMBING, COMMUNICATIONSAND OTHERUTILITY SYSTEMS, EQUIPMENT AND FIXTURES ARCH'LLIGTHING, ACOUSTICS AND ALLIED FIELD OF PRACTICE |ABCHITECTURAL INTERIORS/SPACE PLANNING, RESTORATION/P RESERVATION AND OTHER ANCILLARY SERVICES 10% TOTAL Corresponding Number of hours of Training (FOP) 8 c o E PROJECT TITLE/DESCRIPTION & LOCATION Project ttle: Ms, XX Residence Location: Pacac Pampanga ‘Conducted ar. Pragremming and feasibaity Schematic Design preparation Consultation and presentation to client 36 Preparation of drawings fo building permit ‘acchitectural Interior space planning Preparation of estimates, specications and materials Meeting with dient and pra) 32 ect approval ‘aplication for building pee ‘Ste Supenicion 380 Preparation of Architectural shop di Consultation mecting with cat 32 ‘application for occupancy ‘architectural interior detaling | 2 Final cost analysis ofthe project TOTAL NO OF HOURS|

You might also like