Benefits • Understand the potential value of the deposit.

• Establish the economic viability of the deposit and options for capital
investment and development strategies.
3ds.com/GEOVIA

• Identify preferred development strategy, capital investment, expected NPV


and optimal extraction sequence.

• Analyse expected return on investment.

• Determine strategic direction for the mine; cut-off grade and optimised
cut-off grade; mining areas and extraction sequence per period; and
development strategies for new mines and push backs.
Trusted Results
You Can Bank On
When exploration and mining Whittle Benefits
companies need to evaluate the
financial viability and the optimal mine Project Phase Benefits
strategy for a deposit, they turn to
the industry leading strategic mine Exploration • Understand the potential value of the deposit.
planning solution – GEOVIA Whittle. • Target areas for future drilling.
Companies depend on Whittle to help
Scoping • Establish the economic viability of the deposit and options for
them determine their investment
capital investment and development strategies.
strategy and to deliver robust mine
• Examine sensitivities and assign resources accordingly for
plans that maximise profitability
future studies.
by taking into account real mining
constraints. Delivering trusted results, Pre- • Identify preferred development strategy, capital investment,
the software is used in scoping, feasibility, expected NPV and optimal extraction sequence.
feasibility, life-of-mine scheduling, Feasibility • Calculate sensitivities to develop risk reduction strategy.
and in the ongoing re-evaluation of • Ascertain final reserve statement for the deposit.
mine plans throughout the production
phase. Bankable • Analyse expected return on investment.
Feasibility • Analyse sensitivities and investment risk.
Pit optimisation alone is not enough Study • Consider multiple scenarios for reducing risk.
to unlock the full economic potential
of your operation Whittle provides Production • Determine strategic direction for the mine; cut-off grade
mine optimisation, which enables and optimised cut-off grade; mining areas and extraction
significant increases in project value sequence per period; and development strategies for new
over and above pit optimisation. With mines and push backs.
Whittle, you have all the strategic • Re-evaluate mine plans in response to changing conditions.
mine planning capabilities you need to • Calculation of annual reserve statement.
achieve mine optimisation: strategic
scheduling; detailed cost, price
and recovery modelling; stockpiles; By choosing Whittle, you are aligning Whittle: Solutions
multiple mines; blending and cut-off with the industry leader: the world’s
optimisation; and now simultaneous top open pit mines use the software
Tailored for Your
optimisation for creating the ultimate because it delivers results they can Needs
mine schedule. Whittle provides bank on. For over 25 years, Whittle
As a Whittle customer, you can select the
the ability to rapidly evaluate many customers have extracted maximum
features that are right for your needs.
alternatives to ensure that variations value from their deposits by using
from the expected are considered and trusted mine planning processes to You can extend Whittle by adding new
potential deposit value is uncovered. optimise and plan open pit mines. modules as your needs grow.

Block model showing copper grades. 3D viewer enables validation of results and Maximise NPV across your operations.
querying of individual block attributes.

2 Whittle
Standard Whittle Features
“Whittle helped us extend our bench across the orebody and
Companies involved in scoping,
feasibility, planning and production come up with new cash flows. We have increased our ore
depend on Whittle’s standard reserves by more than 1.2 million tonnes in six months, and
features to drive decision-making. we expect extra years of production from the Youga mine.”
That is because Whittle comes with
the essential tools for making mine — Samuel Takyi, Senior Mine Planning Engineer,
strategy decisions including: capital Etruscan Resources Inc.
investment required; economic viability
of the deposit; the size and shape of
the final pit; and understanding key
sensitivities of the mine plan such as • Multi-Element – Enables the support up to 50 push backs during
the effect of costs and metallurgical incorporation of up to 30 elements scheduling.
recoveries. You can also re-evaluate that can be used for modelling
• NPV Practical Push Backs –
your mine plan at anytime in response physical, economic or geological
factors. Realises potential value with push
to changing economic conditions.
backs that target NPV and mining
The unique structure of projects in • Advanced Analysis – Easy to use
width. Also includes:
Whittle promotes the analysis of graphs and templates facilitate
alternatives to attain the best possible extensive analysis of sensitivities • Push Back Chooser – Automatically
strategy for your mine. Whittle projects and risk. selects the set of maximum NPV
are easy to manage as you are guided push backs for a specified ultimate
through key planning functions, from Additional Whittle pit, based solely on NPV.
pit optimisation through life-of-mine Capabilities
scheduling, to sensitivity analysis
and final NPV calculations. While the Life-of-Mine
software’s features are easy to use, Scheduling Modules
they can model even the most complex
When determining project life,
scenarios.
ultimate pit size and extraction
Whittle’s standard feature set includes strategy, mining companies use NPV
the following four modules: as a key project indicator and decision
making tool. To accurately calculate
• Core – Provides essential NPV, realistic mine schedules need to
functionality for pit optimisation be developed. Whittle’s life-of-mine
and benchmark scheduling, scheduling modules provide practical
including: model import; reblocking
push back creation and automated
functionality; slope modelling;
scheduling routines, as well as multi-
best and worst case schedules and Pit-by-pit graph shows increasing ore and
mine capabilities where required to
visualisation; reporting; and export waste tonnages for different final pit options,
model realistic deposit scenarios. along with expected NPV for different
of results.
schedules.
• Milawa Algorithm – Automatically
• Multi-Analysis – Unique ability
schedules up to 10 push backs to
to organise multiple analyses
target maximum NPV or balance ore
within a single project, saving
and waste production.
time, promoting repeatability
of processes and ensuring all • Push Back 50 – Extends the
information is easily accessible. Milawa Algorithm’s capabilities to

Standard graphs and templates promote


analysis.

Schedule directly from shells created in any Geology and Mine Planning System using Milawa and/or Create NPV practical push backs in a single step.
Simultaneous Optimisation.

Whittle 3
• Mining Width – Adjusts user- allow extra value to be realised using
defined pitshells or final pit to techniques for blending, stockpile
accommodate minimum mining and cut-off optimisation, and block
width requirements. value calculations.

• Multi-Mine – Supports scheduling • Blending – Blends scheduled


from multiple mines. material to final product or process
input constraints. In conjunction
Simultaneous Optimisation with the Simultaneous Optimisation
module, allows the simultaneous
Simultaneous Optimisation is the
optimisation of the mining
latest advancement in strategic
schedule, final product or process
mine planning. It facilitates multiple
input blend constraints, stockpiles
optimisation mechanisms in a single
and cut-offs for the mine.
step. The resulting mine schedule
returns higher NPV for the project • Value Expressions – Enhances the
by leveraging the interdependency stockpiles and cut-offs module
between those mechanisms. to work with parcel revenues and
supports multiple methods for
• Simultaneous Optimisation –
calculating block values and parcel Multiple pit schedule visualisation showing
Optimises mine schedule, cut-off
revenues. copper grades with the Multi-Mine module.
grade, stockpiles, and optionally
blending, in a single step.

• Blending – Optional enhancement NPV


to the simultaneous optimisation BLEND
module for final product or process
STOCKPILE
input blend constraints. SIMULTANEOUS
OPTIMISATION
• Stockpiles and cut-offs – Optimises
CUT-OFF
cut-off grade strategy and stockpile
utilisation as an independent
mechanism. SCHEDULE

OPTIMISED PIT
Special Modules
Whittle’s special modules build on the Simultaneous Optimisation achieves greater overall NPV in a single step than multiple optimisation
life-of-mine scheduling modules to mechanisms applied sequentially.

For more information email GEOVIA.Whittle@3ds.com or visit 3ds.com/GEOVIA/Whittle.

Dassault Systèmes, the 3DExperience Company, provides a Business Platform on


premise, on line, in the cloud, powered by 10 software applications that permits social
and industrial collaboration.

B.13.1
Dassault Systèmes, the 3DExperience Company, provides business and people
with virtual universes to imagine sustainable innovations.  Its world-leading www.3ds.com/GEOVIA/Whittle © Dassault Systèmes 2013. All rights reserved.
solutions transform the way products are designed, produced, and supported.
Dassault Systèmes’ collaborative solutions foster social innovation, expanding
possibilities for the virtual world to improve the real world.  The group brings
value to over 150,000 customers of all sizes, in all industries, in more than 140
countries. 

CATIA, SolidWorks, SIMULIA, DELMIA, ENOVIA, GEOVIA, EXALEAD, Netvibes,


3DSwYm and 3DVIA are registered trademarks of Dassault Systèmes or its
subsidiaries in the US and/or other countries.

For more information, visit www.3ds.com/GEOVIA

The mining solutions you expect. From the people you trust.

You might also like