Feroze Gandhi Unchahar Thermal Power Plant has an installed capacity of 1,550 megawatts (2,080,000
hp), inclusive of Fourth Stage, that got operational in April 2017. The First unit was commissioned in
November 1988. The coal for the plant is derived from North Karanpura Coalfield. The water source is
from Sarda Sahyak Canal.[3]