AMOUNT Material TENDER MATERIAL GFC

MILE
WORK DESCRIPTION
STONE NO Japanese Indonesia Concrete Rebar Formwork nos Concrete Rebar Formwork Remark
Yen Rupiah m3 kg m2 m3 kg m2
No 8.2 Complete all piling works
8.2.(1) Bored Cast In-Place Piles

8.2.(1).1 A1~5,A15~17,AA6~AA14 1,832,504,565 427 43,630 17 483 56,462


8.2.(1).2 B2,4,6,8,10,12,14,16,C1~10 1,940,298,951 452 46,196 18 476 28,231
8.2.(1).3 C11~17、Pa1~6 1,401,327,020 270 27,915 13 479 83,422

8.2.(2) Bored Cast In-Place Piles

8.2.(2).1 mobilization and demobilization of Bored-Pile mashine 183,078,105


8.2.(2).2 A6~A14 1,423,508,184 387 40,024 9 359 29,915
8.2.(2).3 B1,3,5,7,9 2,847,016,368 860 88,942 20 715 176,380
8.2.(2).4 B11,13,15,17 2,524,082,321 688 71,154 16 568 138,102

No 8.3 Complete all pile caps and ground beams

8.3.(1) Pilecap TypeA


8.3.(1).1 LST6,14,7,13(4TH) 57,346,701 15 1,951 41 4
8.3.(1).2 LST8,12,9,11(4TH) 57,346,701 15 1,951 41 4
8.3.(1).3 LST10(4TH),LST9,10,8(Right) 57,346,701 18 2,368 45 4
8.3.(1).4 LST11,7,12,6(Right) 57,346,701 19 2,507 46 4
8.3.(1).5 LST13,5,14,4(Right) 57,346,701 17 2,229 44 4
8.3.(1).6 LST15,3,16,2(Right) 57,346,701 15 1,951 41 4
8.3.(1).7 LST17,1(Right),LST10,12(Center) 57,346,701 15 1,951 41 4 245 30,528 567
8.3.(1).8 LST8,14,6,4(Center) 57,346,701 15 1,951 41 4
8.3.(1).9 LST5,6,13,14(Left) 57,346,701 15 1,951 41 4
8.3.(1).10 LST16,2(Center),LST8,9(Left) 57,346,701 15 1,951 41 4
8.3.(1).11 LST10,11,12,7(Left) 57,346,701 15 1,951 41 4
8.3.(1).12 LST15,4,16,3(Left) 57,346,701 15 1,951 41 4
8.3.(1).13 LST17,2,1(Left) 43,010,026 11 1,463 31 3

8.3.(2) Pilecap TypeB


8.3.(2).1 LST9,11(Center) 367,683,845 145 18,122 108 2
8.3.(2).2 LST7,13(Center) 367,683,845 145 18,122 108 2
8.3.(2).3 LST17,15(Center) 367,683,845 145 18,122 108 2 541 48,047 410
8.3.(2).4 LST5,3(Center) 367,683,845 145 18,122 108 2
8.3.(2).5 LST1(Center) 183,841,923 73 9,061 54 1

8.3.(3) Pilecap for Pedestrian bridge


8.3.(3).1 P1a 57,346,701 15 1,951 41 2
141 15,394 220
8.3.(3).2 P1a 28,673,350 8 976 20 2

8.3.(4) Water Tank Type A


8.3.(4).1 Type A (19.20*6.80*5.80 ) 1,060,073,858 365 60,113 1,252 1 402 66,124 1,377

No 8.4 Complete concourse level including columns, beams and slabs

8.4.(1) Cast In Place Column


8.4.(1).1 Cast In Place Column (Type StCol-A)
8.4.(1).1.1 LST6,14,7,13(4TH) 289,916,060 27 20,122 106
8.4.(1).1.2 LST8,12,9,11(4TH) 289,916,060 25 19,454 101
8.4.(1).1.3 LST10(4TH),LST9,10,8(Right) 289,916,060 26 19,721 103
8.4.(1).1.4 LST11,7,12,6(Right) 289,916,060 27 20,077 106
8.4.(1).1.5 LST13,5,14,4(Right) 289,916,060 27 20,254 107
8.4.(1).1.6 LST15,3,16,2(Right) 289,916,060 27 20,455 109
8.4.(1).1.7 LST17,1(Right),LST10,12(Center) 289,916,060 26 20,043 106 448 353,242 1,756
8.4.(1).1.8 LST8,14,6,4(Center) 289,916,060 27 20,410 108
8.4.(1).1.9 LST5,6,13,14(Left) 289,916,060 27 20,188 107
8.4.(1).1.10 LST16,2(Center),LST8,9(Left) 289,916,060 27 20,199 107
8.4.(1).1.11 LST10,11,12,7(Left) 289,916,060 26 19,710 103
8.4.(1).1.12 LST15,4,16,3(Left) 289,916,060 27 20,299 108
8.4.(1).1.13 LST17,2,1(Left) 217,437,045 21 15,840 85

8.4.(1).2 Cast In Place Column (Type StCol-D)


8.4.(1).2.1 LST9,11,7,13(Center) 1,160,873,449 148 108,675 402
8.4.(1).2.2 LST17,15,5(Center) 870,655,087 113 82,217 282 471 172,441 905
8.4.(1).2.3 LST3,1(Center) 580,436,725 82 58,183 187

8.4.(1).3 Cast In Place For Track Corsshead Beam


8.4.(1).3.1 LST9,11,7,13(Center) 541,995,064 129 18,109 194
8.4.(1).3.2 LST17,15,5(Center) 406,496,298 97 13,582 145 - - -
8.4.(1).3.3 LST3,1(Center) 270,997,532 65 9,054 97

8.4.(1).4 Cast In Place For Concourse Corsshead Beam


8.4.(1).4.1 StCCB-D(1) of Corsshead Beam 2,308,083,318 378 205,460 713
8.4.(1).4.2 StCCB-F(1) of Corsshead Beam 1,374,748,716 208 82,635 556
8.4.(1).4.3 StCCB-D(2) of Corsshead Beam 631,018,123 86 43,391 158
8.4.(1).4.4 StCCB-F(2) of Corsshead Beam 445,180,737 86 36,510 229

8.4.(1).5 Concourse Work of Station


8.4.(1).5.1 Concourse Work Type ST-CC1 8,829,496,296 1,610 127,078 769 exclude qty precast

No 8.5 Complete Track way Basic Structure


8.5.(1) Track Work Type ST-TR1 4,728,143,949 1,101 86,148 795 exclude qty precast

No 8.6 Complete platform level


8.6.(1) Platform Work Type ST-PF1 5,648,060,586 1,472 96,840 1,164 exclude qty precast
10,240 1,713,232 9,380 5,327 1,198,289 -
AMOUNT Material TENDER MATERIAL GFC
MILE
WORK DESCRIPTION
STONE NO Japanese Indonesia Concrete Rebar Formwork Concrete Rebar Formwork Remark
Yen Rupiah m3 kg m2 nos m3 kg m2
No 3A.2 Complete all piling works

3A.2.(1) Bored Cast In-Place Piles

3A.2.(1).1 A4,6,8,10,12,14,C4,6,8,10 1,069,863,165 204 21,762 10 334 19,542


3A.2.(1).2 C12,14,Pa1~8 1,069,863,165 135 15,047 10 188 29,517
3A.2.(2) Bored Cast In-Place Piles

3A.2.(2).1 mobilization and demobilization of Bored-Pile mashine 181,705,678


3A.2.(2).2 A1~A3,A11~15,B1~B4 2,825,673,997 680 75,285 21 838 101,020
3A.2.(2).3 A5~A9,B5~B9 2,171,925,821 615 68,259 17 944 134,947
3A.2.(2).4 B10~B13,B14~B15 2,354,728,331 566 62,902 17 875 120,858
3A.2.(2).5 C1~C3,C5~C15 1,412,836,999 326 36,137 9 379 19,446
No 3A.3 Complete all pile caps and ground beams

3A.3.(1) Pilecap TypeA


3A.3.(1).1 FST14,4,12(Center) 42,687,605 16 2,026 37 37
3A.3.(1).2 FST6,10,8(Center),FST1(Left) 56,916,807 22 2,701 49 61
3A.3.(1).3 FST15,1(Right),FST15,2(Left) 56,916,807 22 2,701 49 93
3A.3.(1).4 FST14,2(Right),FST14,3(Left) 56,916,807 19 2,420 46 82
3A.3.(1).5 FST13,3(Right),FST13,4(Left) 56,916,807 21 2,561 48 59
3A.3.(1).6 FST12,4(Right),FST12,5(Left) 56,916,807 18 2,279 45 39
3A.3.(1).7 FST11,5(Right),FST11,6(Left) 56,916,807 21 2,561 48 46
3A.3.(1).8 FST10,6(Right),FST10,7(Left) 56,916,807 18 2,279 45 39
3A.3.(1).9 FST9,7(Right),FST9(Left) 42,687,605 16 2,026 37 37
3A.3.(1).10 FST8(Left),FST8(Right) 28,458,403 9 1,069 22 36
1,047 140,589
3A.3.(2) Pilecap TypeB
3A.3.(2).1 FST1,15(Center) 364,927,540 162 20,170 137 142
3A.3.(2).2 FST3,13(Center) 364,927,540 145 18,072 108 117
3A.3.(2).3 FST5,11(Center) 364,927,540 145 18,072 108 117
3A.3.(2).4 FST7,9(Center) 364,927,540 145 18,072 108 123
3A.3.(3) Pilecap TypeC
3A.3.(3).1 FST2(Center) 64,484,025 24 3,005 36 25
3A.3.(4) Pilecap for Pedestrian bridge
3A.3.(3).1 P1a 56,916,807 15 1,876 41
3A.3.(3).2 P1a 56,916,807 15 1,876 41
3A.3.(5) Water Tank Type A
3A.3.(5).1 Type A (19.20*6.80*5.80 ) 1,052,127,122 376 57,409 414 63,150 -

No 3A.4 Complete concourse level including columns, beams and slabs

3A.4.(1) Cast In Place Column


3A.4.(1).1 Cast In Place Column(Type StCol-A-FA)
3A.4.(1).1.1 FST2,14,4,12(Center) 760,709,176 66 30,729 262
3A.4.(1).1.2 FST6,10,8(Center)FST2(Left) 760,709,176 65 30,593 261
3A.4.(1).1.3 FST14,2(Right),FST14,4(Left) 760,709,176 66 30,688 262
3A.4.(1).1.4 FST12,4(Right),FST12,6(Left) 760,709,176 66 30,892 264
3A.4.(1).1.8 FST10,6(Right),FST10(Left) 570,531,882 50 23,278 199
3A.4.(1).1.10 FST8(Left),FST8(Right) 380,354,588 33 15,555 133
3A.4.(1).2 Cast In Place Column (Type StCol-B)
3A.4.(1).2.1 FST15,1(Right),FST15,1(Left) 1,047,675,934 109 51,025 393 1,523 789,432 4,401
3A4.(1).2.2 FST13,3(Right),FST13,3(Left) 1,047,675,934 109 51,268 395
3A.4.(1).2,3 FST11,5(Right),FST11,5(Left) 1,047,675,934 111 51,832 400
3A.4.(1).2.4 FST9,7(Right),FST9,7(Left) 1,047,675,934 110 51,633 398
3A.4.(1).3 Cast In Place Column (Type StCol-E)
3A.4.(1).3.1 FST1,15,3(Center) 2,367,357,791 380 184,223 607
3A.4.(1).3.2 FST13,5,11(Center) 2,367,357,791 390 191,034 624
3A.4.(1).3.3 FST7,9(Center) 1,578,238,527 258 125,607 413
3A.4.(1).4 Cast In Place For Track Corsshead Beam
3A.4.(1).4.1 FST1,15,3(Center) 588,706,005 97 14,405 138
3A.4.(1).4.2 FST13,5,11(Center) 588,706,005 97 14,405 138 - - -
3A.4.(1).4.3 FST7,9(Center) 392,470,670 65 9,604 92
3A.4.(1).5 Cast In Place For Concourse Corsshead Beam
3A.4.(1).5.1 (1.5m*1.135m)Type StCCB-E(M) of Corsshead Beam 1,795,033,324 239 142,378 565
3A.4.(1).5.2 (1.0m*1.135m)Type StCCB-G(M) of Corsshead Beam 1,311,015,934 151 83,570 373
3A.4.(1).5.3 (2.0m*1.135m)Type StCCB-A(H) of Corsshead Beam 2,195,572,667 314 181,880 631
3A.4.(1).5.4 (1.0m*1.135m)Type StCCB-G(H) of Corsshead Beam 1,056,731,988 151 87,105 435
3A.4.(1).6 Concourse Work of Station
3A.4.(1).6.1 Concourse Work of Type ST-CC2-Lower 5,268,017,199 385 29,579 199 exclude qty precast
3A.4.(1).6.2 Concourse Work of Type ST-CC2-Upper 8,280,676,837 1,460 109,065 595 exclude qty precast

No 3A.5 Complete Track way Basic Structure

3A.5.(1) Track work Type ST-TR2 4,125,027,512 1,109 83,935 705 exclude qty precast

No 3A.6 Complete platform level


3A.6.(1) Platform Work Type ST-PF1 5,648,060,586 1,383 141,688 2,014 exclude qty precast

9,615 2,064,851 9,485 6,541 1,418,503 5,453


AMOUNT Material TENDER MATERIAL GFC
MILE
WORK DESCRIPTION
STONE NO Japanese Indonesia Concrete Rebar Formwork Concrete Rebar Formwork Remark
Yen Rupiah m3 kg m2 m3 kg m2
No 3B.2 Complete all piling works

3B.2.(1) Bored Cast In-Place Piles


3B.2.(1).1 A1~A15,B2,B4,B6 1,925,753,696 396 41,263 18 598 44,030
3B.2.(1).2 B8,B10,B12,B14,C1~C12 1,711,781,063 352 36,679 16 514 39,432
3B.2.(1).3 C13~15,Pa1~15 1,686,787,629 240 26,917 20 252 40,789

3B.2.(2) Bored Cast In-Place Piles


3B.2.(2).1 mobilization and demobilization of Bored-Pile mashine 181,705,678
3B.2.(2).2 B1,B3,B5 1,883,782,665 461 52,220 12 658 112,344
3B.2.(2).3 B15,B13,B11 1,883,782,665 461 52,220 12 473 70,356
3B.2.(2).4 B7,B9 1,255,855,110 308 34,813 8 394 54,527

No 3B.3 Complete all pile caps and ground beams

3B.3.(1) Pilecap TypeA

3B.3.(1).1 CST2,14,4,12(Center) 56,916,807 15 1,951 41 13.26 1,145.88 36.00


3B.3.(1).2 CST6,10,8(Center),CST15(Left) 56,916,807 15 1,951 41 13.26 1,124.65 36.00
3B.3.(1).3 CST1,14,2,13(Left) 56,916,807 15 1,951 41 13.26 1,060.96 36.00
3B.3.(1).4 CST3,12,4,11(Left) 56,916,807 15 1,951 41 13.26 1,058.53 36.00
3B.3.(1).5 CST5,10,6,9(Left) 56,916,807 15 1,951 41 13.26 1,058.53 36.00
3B.3.(1).6 CST7,8(Left),CST1,15(Right) 56,916,807 15 1,951 41 13.26 1,058.53 36.00
3B.3.(1).7 CST2,14,3,13(Right) 56,916,807 15 1,951 41 13.26 1,058.53 36.00
3B.3.(1).8 CST4,12,5,11(Right) 56,916,807 15 1,951 41 13.26 1,058.53 36.00
3B.3.(1).9 CST6,10,7(Right) 42,687,605 11 1,463 31 9.95 793.90 27.00
3B.3.(1).10 CST9,8(Right) 28,458,403 8 976 20 6.63 529.27 18.00
3B.3.(2) Pilecap TypeB -
3B.3.(2).1 CST1,15,3(Center) 364,927,540 145 18,122 108 189.06 23,380.07 117.00
3B.3.(2).2 CST3,13(Center) 364,927,540 145 18,122 108 120.11 11,527.92 91.16
3B.3.(2).3 CST5,11(Center) 364,927,540 145 18,122 108 120.11 11,603.26 91.16
3B.3.(2).4 CST7,9(Center) 364,927,540 145 18,122 108 120.11 10,958.03 91.16
3B.3.(3) Pilecap for Pedestrian bridge
3B.3.(3).1 P1a 56,916,807 19 2,439 51
3B.3.(3).2 P1a 56,916,807 19 2,439 51
100.17 10,514.11 140.21
3B.3.(3).3 P1a 56,916,807 15 1,951 41
3B.3.(3).4 P1a 42,687,605 11 1,463 31
3B.3.(4) Water Tank Type B
3B.3.(4).1 Type B 635,766,782 128 19,609 468 126.61 26,546.44 525.42

No 3B.4 Complete concourse level including columns, beams and slabs

3B.4.(1) Cast In Place Column


3B.4.(1).1 Cast In Place Column (Type StCol-A)
3B.4.(1).1.1 CST2,14,4,12(Center) 287,742,733 36 26,476 145
3B.4.(1).1.2 CST6,10,8(Center),CST15(Left) 287,742,733 34 25,365 136
3B.4.(1).1.3 CST1,14,2,13(Left) 287,742,733 36 26,476 145
3B.4.(1).1.4 CST3,12,4,11(Left) 287,742,733 36 26,476 145
3B.4.(1).1.5 CST5,10,6,9(Left) 287,742,733 37 27,335 146
343 238,315 1,346
3B.4.(1).1.6 CST7,8(Left),CST1,15(Right) 287,742,733 35 26,659 142
3B.4.(1).1.7 CST2,14,3,13(Right) 287,742,733 36 26,221 143
3B.4.(1).1.8 CST4,12,5,11(Right) 287,742,733 36 26,321 144
3B.4.(1).1.9 CST6,10,7(Right) 215,807,050 28 20,365 110
3B.4.(1).1.10 CST9,8(Right) 143,871,367 18 13,809 72
3B.4.(1).2 Cast In Place Column (Type StCol-D)
3B.4.(1).2.1 CST1,15,3(Center) 864,128,309 157 84,105 372 149.84 73,735.29 287.87
3B.4.(1).2.2 CST13,5,11(Center) 864,128,309 152 81,924 363 146.31 60,530.57 281.10
3B.4.(1).2.3 CST7,9(Center) 576,085,539 106 56,900 236 100.94 49,971.70 193.92
3B.4.(1).3 Cast In Place For Track Corsshead Beam
3B.4.(1).3.1 CST1,15,3(Center) 403,449,040 97 13,582 145
3B.4.(1).3.2 CST13,5,11(Center) 403,449,040 97 13,582 145 - - -
3B.4.(1).3.3 CST7,9(Center) 268,966,026 65 9,054 97
3B.4.(1).4 Cast In Place For Concourse Corsshead Beam
3B.4.(1).4.1 (1.5m*1.3m)Type StCCB-D(1) of Corsshead Beam 2,036,249,782 343 173,566 632 - - -
3B.4.(1).4.2 (1.0m*1.3m)Type StCCB-F(1) of Corsshead Beam 1,154,885,799 200 85,190 497 - - -
3B.4.(1).5 Concourse Work of Station
3B.4.(1).5.1 Concourse Work of Type ST-CC3 6,782,527,781 1,271 101,526 741

No 3B.5 Complete Track way Basic Structure

3B.5.(1) Track work Type ST-TR2 4,125,027,512 964 71,216 695

No 3B.6 Complete platform level

3B.6.(1) Platform work Type ST-PF3 4,868,656,145 1,275 84,938 1,036

TOTAL 8,188 1,383,634 7,737 4,528 888,508 3,498


SUMMARY TOTAL QTY MATERIAL GFC
Milestone CONCRETE (M3) REBAR (KG)
Description Remark
No. TENDER GFC TENDER GFC
8 Lebak Bulus
Bored Pile 3,084 3,506 317,861 512,512

Pilecap 1,242 1,392 170,716 160,094


Column 682 1,063 505,847 525,683

Track Crosshead Beam 291 291 40,745 40,745


Concourse Crosshead Beam 758 870 367,997 183,548.90 Rebar beam from 500 kg to 200 kg/m3
Concourse work 1,610 1,293 127,078 314,154.89 Rebar slab from 34 to 240 Kg / m3
Track Work 1,101 1,101 86,148 86,148 Concrete slab decresed 0.75%
Platform work 1,472 1,472 96,840 96,840

SubTotal concourse work 5,232 5,026 718,808 721,437


TOTAL LEBAK BULUS 10,240 10,988 1,713,232 1,919,726

3A Fatmawati
Bored Pile 2,526 3,557 279,391 425,332

Pilecap 1,210 1,461 161,176 203,739


Column C31-C37 assume same with C29
Column 1,812 1,523 868,357 789,432 ; C40 assume same with C39; C46~C49
assume same with C45

Track Crosshead Beam 258 258 38,414 38,414


Concourse Crosshead Beam 856 856 494,933 180,554.81 Rebar beam from 500 kg to 200 kg/m3
Concourse work 1,845 1,383 138,644 336,177.80 Rebar slab from 34 to 240 Kg / m3
Track Work 1,109 1,109 83,935 83,935 Concrete slab decresed 0.75%
Platform work 1,383 1,383 141,688 141,688

SubTotal concourse work 5,450 4,989 897,614 780,770


TOTAL FATMAWATI 10,998 11,530 2,206,539 2,199,272

3B Cipete Raya
Bored Pile 2,218 2,889 244,111 361,478

Pilecap 912 899 118,438 104,477


C46~C53 assume with Column fatmawati
Column 747 740 468,433 422,553
station C50~C57

Track Crosshead Beam 258 258 36,217 36,217


Concourse Crosshead Beam 543 543 258,756 114,657.40 Rebar beam from 500 kg to 200 kg/m3
Concourse work 1,271 953 101,526 231,593.50 Rebar slab from 34 to 240 Kg / m3
Track Work 964 964 71,216 71,216 Concrete slab decresed 0.75%
Platform work 1,275 1,275 84,938 84,938

SubTotal concourse work 4,311 3,993 552,653 538,622


TOTAL CIPETE 8,188 8,521 1,383,634 1,427,130
GRAND TOTAL 29,426 31,039 5,303,405 5,546,129
SUMMARY MATERIAL BORED CAST IN PLACE FOR DEPOT BUILDING

Milestone No. Description Tender GFC Deviation Remark No. Of Structure

Rebar Concrete Rebar Concrete Rebar Concrete Tender GFC


(a) (b) (c) (d) (e)=(c)-(a) (f)=(d)-(b)

3b.3.(1) Administration Building


3b.3.(1).1 Bored Cast In-Place 79,358.99 529.06 76,952.76 1,025.11 (2,406.23) 496.05 23.00 23.00
-3% 94%
3b.3.(2) Workshop Office
3b.3.(2).1 Bored Cast In-Place 31,247.85 208.32 29,362.20 360.87 (1,885.65) 152.55 15.00 15.00
-6% 73%
3b.3.(3) Infrastructure Maintenance Office
3b.3.(3).1 Bored Cast In-Place 29,661.23 197.74 20,107.50 245.99 (9,553.73) 48.25 15.00 15.00
-32% 24%
3b.3.(4) Workshop (Main)
3b.3.(4).1 Bored Cast In-Place 616,115.29 3,520.66 982,296.28 9,151.29 366,180.99 5,630.63 183.00 173.00
59% 160%
3b.3.(5) Inspection Shed
3b.3.(5).1 Bored Cast In-Place 257,100.29 1,714.00 590,153.52 6,057.37 333,053.23 4,343.37 88.00 104.00
130% 253%
3b.3.(6) Maintenance Car Garage
3b.3.(6).1 Precast Concrete Piles --> Bored Cast In Place - - 16,584.10 167.95 16,584.10 167.95 80.00 20.00

3b.3.(7) Gate House 1

3b.3.(8) Gate House 2

3b.3.(9) Rescue Car Garage

3b.3.(10) Car Garage


3b.3.(10).1 Car Garage 1
3b.3.(10).2 Car Garage 2

3b.3.(11) Shunting Loco Shed


3b.3.(11).1 Precast Concrete Piles --> Bored Cast In Place - - 8,776.40 87.76 8,776.40 87.76 22.00 12.00

3b.3.(12) Hazardous Store

3b.3.(13) Industrial Wastewater treatment plant

3b.3.(14) Domestic Wastewater treatment plant

3b.3.(15) Manual Cleaning Deck

3b.3.(16) Driver's Deck

3b.3.(17) Garbage Collection Site

3b.3.(18) Motorbike Parking Shed (1)

3b.3.(19) Motorbike Parking Shed (2)

3b.3.(20) Incinerator

3b.3.(21) Fuel tank

3b.3.(22) Water Supply Storage Tank and Pump House

3b.3.(23) Fire fighting storage Tank and Pump House

3b.3.(24) Car Parking

3b.3.(25) Stock Yard

3b.3.(26) Recharge Pond

TOTAL 1,013,483.64 6,169.78 1,724,232.76 17,096.34 710,749.12 10,926.56