8. The crane load will be incremented by 10% until it reaches the final lift weight.

Visual
inspections shall be carried out to ensure that the rigging system is intact.

9. Adjust the crane booms and lifting height to a safe level as per rigging arrangement.

10. When the structure is lifted, the load cell will read the load displayed on the monitor
connected with the cable and should be recorded.

11. Release the crane load in small increment until free loaded and the upper grillage will be put
back into its original position.

12. Remove the riggings and others helping rope / tagline that use when lifting.

13. All temporary handling padeyes shall be removed after stacking. Also shall be grinded-flush
and remove sharp edges.

14. Weighing operation minimum twice (2) and the average results will be recorded and
submitted.