You are on page 1of 3
Mob - 8929279222 DAIKIN RVA ENGINEERS LLP AIR CONDITIONING, REFRIGERATION ENGINEERS & CONTRACTORS plit& Window AIC * Dairy Plants * Cold Storage * Chilling Plant for injection Moulding, Brewery Paints Any type of Air Conditioning Works Reg At:- F64/C-3 Flate No 61 .Sec-40 Noida (UP.) ‘Spin Maintenance of :* Central AIC Plant Package * Unit Works At C-55, sector-®, Noida (U.P) ‘Annexure-I-A (SUPPLY OF EQUIPMENT) PART-1 Description - Variable Refrigerant Volume System Unit | Qty. [Rate | Total Amount (Rs) 1 Supply of VRV Modular Type fioning System with Inverter Based Technology with factory fitted Indoor and Outdoor Units, Induvidual Temperature Controller with each Indoor Unit complete with interconnected refrigerant piping with control wiring as per Standards and. specifications between Indoor and Outdoor Us charge of refrigerant gas and oil after necessary vacumising, nitrogen flushing and pressure testing of system. A) Supply of Outdoor Units Equiped with Highly efficient Multiple scroll Compressors with all Variable speed in ‘each outdoor unit with noise level not exceeding 67db(A), ete. with Nitrogen Reprocessing, vacumising, Charging and Top-up of R410 A gas (Heating & Cooling) as per requirement at site. D 'S HP (RXRQSARVI6) Nos. [1 __| 137,500_ | 137,500 2 Supply of Indoor Units with outer cabinet equipped with ters, multispeed Inverter Motor, DX C Section, Drain Pain, Builtin Drain Pump,cleetronic expansion valves, pipe connections, PCBs etc. a) Wall Mounted Type AC i) FXARQ2SARVE6 (0.8 TR) Nos. [1 | 20,489 | 20,489 ii) FXARQ40ARVES (1.28 TR) Nos. [i | 22,765 | 22,765 FXARQO3ARVE6 (2.02 TR) Nos. [1 | 24871 _| 24,871 3 Supply of Interconnecting "Y" Joints ie. Refnet Joints/Header with Insulation for refrigerant piping. a) Y Joints (727, 337, 221) Nos. [2 [2277 [4554 4 Lifting, Shifting, Installation, Testing and Commissioning of System Controllers, Aa) Cordless Nos. [3 [3,430 | 10,290 TOTAL VALUE OF Annexure-I1-A (SUPPLY OF EQUIPMENT) 220,169 GST WILL BE PAID EXTRA PART-2 Annexure-II-B (INSTALLATION WORK) Description - Variable Refrigerant Volume System Unit | Qty. [Rate | Total Amount (Rs) 1.0 | Installation, Testing and Commissioning of VRV Modular Type Air-conditioning System with Inverter Based Technology with factory fitted Indoor and Outdoor Units, Induvidual Temperature Controller with each Indoor Unit complete with interconnected refrigerant piping with control wiring as per Standards and specifications between Indoor and Outdoor Units, full charge of refrigerant gas and oil after necessary vacumising, nitrogen flushing and pressure testing of system. A) Lifting, Shifting, Installation, Testing and Commissioning of Outdoor Units Equiped with Highly efficient Multiple scroll Compressors with all Variable speed in each ‘outdoor unit with noise level not exceeding 674b(A), et with Nitrogen Reprocessing, vacumising, Charging and Top-up of R410 A gas as per requirement at site. i) 'S HP (RXRQSARVI6) Nos. [1 | 7,000 | 7,000 BY ‘Additional Gas Charging for i) 5 HP (RXRQSARVI6) Nos. [1 | 10,000 | 10,000 2 Lifting, Shifting, Installation, Testing and Commissioning of Indoor Units with outer cabinet equipped with pre air- filters, multispeed Inverter Motor, DX Coil Section, Drai Pain, Builtin Drain Pump, electronic expansion valves, pipe connections, PCBs ete, Wall Mounted Type AC FXARQ2SARVEG (0.8 TR) Nos. [1 | 1,500 _ | 1,500 FXARQAARVEG (1.28 TR) Nos. [7 | 1500 | 1,500 FXARQG3ARVEG (2.02 TR) Nos. [1 | 1500 | 1,500 3 Lifting, Shifting, Installation, Testing and Commissioning of Interconnecting "Y" Joints ie. Refnet Joints/Header with Insulation for refrigerant piping A) Y Joints (73, 721, 331, 221) Nos. [2 | 250 300 4 ‘Supply, Installation, Testing and Commissioning of Rm [30 [1100 | 33,000 refrigerant piping, tees, sockets, expanders and reducers as per requirement at site complete with supports, threaded rods, channel, tie, fastners etc. interconnecting the outdoor condensing units and indoor evaporating units with closed cell elastomeric nitrile rubber tubular insulation of 19mm on gas pipe line and 13mm on liquid pipe line. (Quantities Quoted here are only for estimation purpose on tentative basis and However they are to be Charged as per actual measurement at site on Rmt basis, as applicable) 5 ‘Supply, Installation, Testing and Commissioning of 2 core | Rmt | 40 | 150 6,000 x I/LS sq.mm copper conductor cable as per requirement at site complete with supports, threaded rods, channel, tie, fastners etc. for control between indoor and outdoor unit & for communication between Indoor Unit & Remote Controllers in suitable PVC Conduict (Quantities Quoted here are only for estimation purpose on tentative basis and However they are to be Charged as per actual measurement at site on Rmt basis as applicable) 6 Supply, Installation, Testing and Commissioning of Hard u-PVC condensate drain piping with 9 mm thick closed cell elastomeric nitrile rubber tubular insulation up to the nearest drain point along with necessary fittings. (Quantities Quoted here are only for estimation purpose ‘on tentative basis and However they are to be Charged as per actual measurement at site on Rmt basis as ble) Insulation and instolation will be done by us A) Rime [30 | 120 3,600 7 ‘Outdoor Stand with Epoxy Paint As Per Customer Requirment ) 3 HP (RXRQSARVI6) Nos. [1 [2,800 | 2,800 TOTAL VALUE Annexure-II-B (INSTALLATION WORK) 67,400 PART-3 TOTAL VALUE OF Annexure-II-A (SUPPLY OF EQUIPMENT) 220,169 TOTAL VALUE Annexure-II-B (INSTALLATION WORK) 67,400 GRAND TOTAL VALUE OF (Annexure-I-A + Annexure-II-B) 2,87,569 GST @28% on Equipment’s Value & @18% on Low Side Work Would be Charged Extra, 1, 100% Advance Payment of High Side (ie. of Equipment Value) along with Performa Invoice. Low Side 1. 50% Advance Payment of Low Side work when the Material is ready for shipping. 2. 40% Payment after All Piping & Ducting Work Installation. 3. 10% After Commissioning & Handing Over. c. sec-9 Noida

You might also like