Mob - 8929279222
DAIKIN
RVA ENGINEERS LLP
AIR CONDITIONING, REFRIGERATION ENGINEERS & CONTRACTORS
plit& Window AIC * Dairy Plants
* Cold Storage * Chilling Plant for injection Moulding, Brewery Paints Any type of Air Conditioning Works
Reg At:- F64/C-3 Flate No 61 .Sec-40 Noida (UP.)
‘Spin Maintenance of :* Central AIC Plant Package * Unit
Works At C-55, sector-®, Noida (U.P)
‘Annexure-I-A (SUPPLY OF EQUIPMENT)
PART-1
Description - Variable Refrigerant Volume System Unit | Qty. [Rate | Total Amount
(Rs)
1 Supply of VRV Modular Type fioning System with Inverter Based Technology with factory
fitted Indoor and Outdoor Units, Induvidual Temperature Controller with each Indoor Unit
complete with interconnected refrigerant piping with control wiring as per Standards and.
specifications between Indoor and Outdoor Us charge of refrigerant gas and oil after
necessary vacumising, nitrogen flushing and pressure testing of system.
A) Supply of Outdoor Units Equiped with Highly efficient
Multiple scroll Compressors with all Variable speed in
‘each outdoor unit with noise level not exceeding 67db(A),
ete. with Nitrogen Reprocessing, vacumising, Charging
and Top-up of R410 A gas (Heating & Cooling) as per
requirement at site.
D 'S HP (RXRQSARVI6) Nos. [1 __| 137,500_ | 137,500
2 Supply of Indoor Units with outer cabinet equipped with
ters, multispeed Inverter Motor, DX C
Section, Drain Pain, Builtin Drain Pump,cleetronic
expansion valves, pipe connections, PCBs etc.
a) Wall Mounted Type AC
i) FXARQ2SARVE6 (0.8 TR) Nos. [1 | 20,489 | 20,489
ii) FXARQ40ARVES (1.28 TR) Nos. [i | 22,765 | 22,765
FXARQO3ARVE6 (2.02 TR) Nos. [1 | 24871 _| 24,871
3 Supply of Interconnecting "Y" Joints ie. Refnet
Joints/Header with Insulation for refrigerant piping.
a) Y Joints (727, 337, 221) Nos. [2 [2277 [4554
4 Lifting, Shifting, Installation, Testing and Commissioning
of System Controllers,
Aa) Cordless Nos. [3 [3,430 | 10,290
TOTAL VALUE OF Annexure-I1-A (SUPPLY OF EQUIPMENT) 220,169
GST WILL BE PAID EXTRA
PART-2Annexure-II-B (INSTALLATION WORK)
Description - Variable Refrigerant Volume System Unit | Qty. [Rate | Total Amount
(Rs)
1.0 | Installation, Testing and Commissioning of VRV Modular Type Air-conditioning System with
Inverter Based Technology with factory fitted Indoor and Outdoor Units, Induvidual Temperature
Controller with each Indoor Unit complete with interconnected refrigerant piping with control
wiring as per Standards and specifications between Indoor and Outdoor Units, full charge of
refrigerant gas and oil after necessary vacumising, nitrogen flushing and pressure testing of system.
A) Lifting, Shifting, Installation, Testing and Commissioning
of Outdoor Units Equiped with Highly efficient Multiple
scroll Compressors with all Variable speed in each
‘outdoor unit with noise level not exceeding 674b(A), et
with Nitrogen Reprocessing, vacumising, Charging and
Top-up of R410 A gas as per requirement at site.
i) 'S HP (RXRQSARVI6) Nos. [1 | 7,000 | 7,000
BY ‘Additional Gas Charging for
i) 5 HP (RXRQSARVI6) Nos. [1 | 10,000 | 10,000
2 Lifting, Shifting, Installation, Testing and Commissioning
of Indoor Units with outer cabinet equipped with pre air-
filters, multispeed Inverter Motor, DX Coil Section, Drai
Pain, Builtin Drain Pump, electronic expansion valves,
pipe connections, PCBs ete,
Wall Mounted Type AC
FXARQ2SARVEG (0.8 TR) Nos. [1 | 1,500 _ | 1,500
FXARQAARVEG (1.28 TR) Nos. [7 | 1500 | 1,500
FXARQG3ARVEG (2.02 TR) Nos. [1 | 1500 | 1,500
3 Lifting, Shifting, Installation, Testing and Commissioning
of Interconnecting "Y" Joints ie. Refnet Joints/Header
with Insulation for refrigerant piping
A) Y Joints (73, 721, 331, 221) Nos. [2 | 250 300
4 ‘Supply, Installation, Testing and Commissioning of Rm [30 [1100 | 33,000
refrigerant piping, tees, sockets, expanders and reducers
as per requirement at site complete with supports,
threaded rods, channel, tie, fastners etc. interconnecting
the outdoor condensing units and indoor evaporating units
with closed cell elastomeric nitrile rubber tubular
insulation of 19mm on gas pipe line and 13mm on liquid
pipe line. (Quantities Quoted here are only for estimation
purpose on tentative basis and However they are to be
Charged as per actual measurement at site on Rmt basis,
as applicable)
5 ‘Supply, Installation, Testing and Commissioning of 2 core | Rmt | 40 | 150 6,000
x I/LS sq.mm copper conductor cable as per requirement
at site complete with supports, threaded rods, channel, tie,
fastners etc. for control between indoor and outdoor unit
& for communication between Indoor Unit & Remote
Controllers in suitable PVC Conduict (Quantities Quoted
here are only for estimation purpose on tentative basis and
However they are to be Charged as per actual
measurement at site on Rmt basis as applicable)6 Supply, Installation, Testing and Commissioning of Hard
u-PVC condensate drain piping with 9 mm thick closed
cell elastomeric nitrile rubber tubular insulation up to the
nearest drain point along with necessary fittings.
(Quantities Quoted here are only for estimation purpose
‘on tentative basis and However they are to be Charged as
per actual measurement at site on Rmt basis as
ble) Insulation and instolation will be done by us
A) Rime [30 | 120 3,600
7 ‘Outdoor Stand with Epoxy Paint As Per Customer
Requirment
) 3 HP (RXRQSARVI6) Nos. [1 [2,800 | 2,800
TOTAL VALUE Annexure-II-B (INSTALLATION WORK) 67,400
PART-3
TOTAL VALUE OF Annexure-II-A (SUPPLY OF EQUIPMENT) 220,169
TOTAL VALUE Annexure-II-B (INSTALLATION WORK) 67,400
GRAND TOTAL VALUE OF (Annexure-I-A + Annexure-II-B) 2,87,569
GST @28% on Equipment’s Value & @18% on Low Side Work Would be Charged Extra,
1, 100% Advance Payment of High Side (ie. of Equipment Value) along with Performa Invoice.
Low Side
1. 50% Advance Payment of Low Side work when the Material is ready for shipping.
2. 40% Payment after All Piping & Ducting Work Installation.
3. 10% After Commissioning & Handing Over.
c.
sec-9 Noida